
1 minute read
4.7 Non standard power take-off
4 Technical threshold values for planning 4.7 Non standard power take-off
4.7 Non standard power take-off
When non standard power take-off is used, see the dimensions listed on e page 206 for the lead-out port diameter and transmission-related dimensions.