Concerning your safety – Maintenance work 3.9.5 Measures for longer shut-down periods If the machine is taken out of operation for a longer period of time, various conditions must be met and maintenance work must be carried out both before and after shut-down Ä Chapter 8.11.5 ‘Measures prior to extended shut-down period’ on page 94. It is not necessary to define a maximum storage period if these measures have been performed.
3.9.6 After maintenance work Reassemble all guards and protections.
34
DRP45DX