
1 minute read
T orque the pressure switch (15) – N·m ).
from CNH Object handling kit 580ST 590ST 695ST 580T Loader Backhoe Installation Instructions Manual - PDF
30. W orking from inside the cab, remove the plug (R) the front left - hand instrument panel (S) . 31. Loosen and remove the fastening screws (T) . 32. Paying attention the electric connections, partially lift the front left - hand instrument panel (S) make the lower side accessible.
33. Remove the screws fastening (U) the side instrument (V) . NOTICE: Care must used when pulling the panel away from the cluster that there is damage the wire harnesses.
34. W orking under the instrument, first install the plate (19) , then mount the buzzer (20) it. 35. Connect the wiring harness (21) the buzzer (20) .
36. Remove the fuse cover loosing the cover screws and pulling f the cover . 37. Connect the wiring harness (21) . 38. Install the fuse cover .
RAIL14TLB0878BA 16

RAIL14TLB0879BA 17

RAIL14TLB0880BA 18

RAIL14TLB0883BA 19