
1 minute read
Connect the hose (G) the tube (10
from CNH Object handling kit 580ST 590ST 695ST 580T Loader Backhoe Installation Instructions Manual - PDF
V alidating kit upgrade
Close and / reassemble possible covers, protections guards still open unmounted.
Check the hydraulic fluid reservoir level. T with
CASE AKCELA NEXPLORE™ FLUID if necessary
Start the machine and, activating some the controls, carry out some movement, in order let the oil circulate in the whole system.
Check that, during the installation the “object handling kit”, functions the machine have been impaired, carrying out some movements with the backhoe attachment.
Also check the correct operation the buzzer (and the new wiring harness), raising the boom and keeping the cylinder pressurized for a few seconds stroke end; in this condition, the buzzer activates. A TTENTION: After installing the “object handling kit”, it is necessary update the EC Declaration Conformity (ask your Dealer). Until the new updated EC Declaration Conformity is released, with the approval for using the new “suspended load handling” unit, this function the machine must not used.