CNH Joystick Steering Kit with Standard Hydraulic Steering 821G W190D Wheel Loader Installation Inst

Page 16

5 - ASSEMBLY

19. Install the tee (10) to the suction valve hose (45). 20. Install the 45° elbow (18) to the LS steering hose (18). 21. Install the check valve (25) to the tee (10) and the to CF port of the steering priority valve (Z). 22. Install the steering supply hose (46) to the tee (10). 23. Install the straight connector (17) to the steering priority valve (Z). 24. Install the shuttle tee hydraulic valve (6) to the straight connector (17) and the 45° elbow (18). 25. Install the LS steering hose (47) to the shuttle tee hydraulic valve (6).

LEIL19WHL0696GB

8

16 EN


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CNH Joystick Steering Kit with Standard Hydraulic Steering 821G W190D Wheel Loader Installation Inst by www.heydownloads.com - Issuu