CLARK FORKLIFT ET204 Troubleshooting the EV T5 Control TECHNICAL TRAINING MANUAL

Page 8

Section 1. EV-T5 Control Sequence of Operations This sequence of operation is designed to provide a complete step-by-step description of the operation of Clark lift trucks equipped with GE model EV-T5 MOSFET control. Please read each operation sequence and then trace the sequence onto the diagram as described. If you will follow the steps carefully, and not skip around you should be familiar with the entire operation of the lift truck electrical system. Then, if you wish to review any particular part or sequence, consult the Table of Contents and refer to the particular sequences involved.

Identification of Abbreviations The following abbreviations are used in the text and in the wiring schematics: A B.D.I. 1A IC F FWD FU HM p L FET R REV FIL SW CTP FTP

EV T-5 Control page 6

Armature Battery Discharge Indicator Bypass Contactor Assembly Capacitor Forward Contactor Assembly Forward Directional Switch Fuse Hour Meter Main Pump Contactor Assembly Line Contactor Assembly Field Effect Transistor Reverse Contactor Assembly Reverse Directional Switch Filter Switch Thermal Protector [ Capacitor ] Thermal Protector [ Fets ]

Copyrighted Material Intended for CLARK dealers only Do not sell or distribute


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CLARK FORKLIFT ET204 Troubleshooting the EV T5 Control TECHNICAL TRAINING MANUAL by www.heydownloads.com - Issuu