Claas Swathers LINER 1550 TWIN Profil Operator’s Manual - PDF DOWNLOAD

Page 19

Assembly

2 1

4

2

5

FIRST MACHINE HITCH-UP Before using the machine for the first time, the hitching points and the universal drive shaft must be matched to the tractor. 1. Check the scope of delivery against the delivery note. 2. Assemble the machine according to the instructions. 3. Hitch up the machine, and adapt the hitching points if necessary – see Hitching, page 8.2. 4. Adapt and connect the universal drive shaft – see Universal drive shaft, page 8.3. 5. Connect the hydraulic hoses – see Hydraulic connections, page 8.9. 6. Carry out the operations described in Items to check and observe before operation on Page 8.1. 7. Put machine into operation – see Field operation, page 9.1.

0299 243.3 - BA LINER 1550 TWIN Profil

7.2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Claas Swathers LINER 1550 TWIN Profil Operator’s Manual - PDF DOWNLOAD by www.heydownloads.com - Issuu