Claas LINER 780 Profil LINER 680 Profil Operator's Manual - PDF DOWNLOAD

Page 18

Assembly FIRST MACHINE HITCH-UP 2

Before using the machine for the first time, the hitching points and the universal drive shaft must be matched to the tractor. 1. Check the scope of delivery against the delivery note. 2. Assemble the machine according to the instructions.

3

3. Hitch up the machine, and adapt the hitching points if necessary – see , page Hitching to the tractor8.2. 4. Adapt and connect the universal drive shaft – see , page Universal drive shaft8.3. 5. Connect the hydraulic hoses – see , page Hydraulic connections8.5. 6. Carry out the operations described inItems to check and observe before operationon page 8.1. 7. Put machine into operation – see , page Field operation9.1.

7.2

BA LINER 780 Profil / 680 Profil - 299 239.2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Claas LINER 780 Profil LINER 680 Profil Operator's Manual - PDF DOWNLOAD by www.heydownloads.com - Issuu