BMA Shield PMC-R Operating Manual
Initiate an SRB Newstart – Shearer communications tracking To initiate SRB, the operator must be adjacent to the shearer, where the flashing.
key is
1.
Press
to select SRB automatic operation.
2.
Then select the Direction that the shearer will travel, by pressing either .
3.
Start the SRB by pressing
or
.
NOTICE
If the is running.
and
keys LED’s are lit, SRB
Now that the SRB automatic is started, if the Shearer Running Batch (SRB) is cancelled (for example, the Stop key was pressed), the SRB can be ‘Restarted’ from a group of Shields near the shearer, indicated by a flashing flashing.
The sequence can be ‘Restarted’ by pressing
4.
To stop SRB press
and
, then
keys LED’s
and then
.
.
NOTICE It is important to ‘Restart’ SRB and not to initiate e new start unless the shearer is at the beginning of its main-to-tail or tail-to-main sequence.
EM027362-01