Front Balancer Group

FUEL INJECTION CONTROL LINKAGE

5. Remove bolts (9) and the caps that hold the levers of rod assemblies (8) to the fuel control rod.

6. If necessary, remove the cover from the front right side of the flywheel housing and use tool (B) to turn the engine flywheel until the camshaft is moved in a position so the levers of rod assemblies (8) can be removed between the cylinder block and camshaft.

7. Remove bolts (11) and remove lever assemblies (10) and fuel control rod assemblies (8) as a unit from the cylinder heads. See Step 6 if the levers on the lower ends of rod assemblies (8) do not have enough clearance to be removed from the engine.

8. Remove locknut (12) and the washer to remove rod assembly (8) from lever assembly (10).

9. Remove levers (14) from control shafts (1).

10. Remove the bolts and supports(13) from each side of the engine.

372

FUEL INJECTION CONTROL LINKAGE

11. If necessary, remove bearings (15) from supports (13) with tool group (A).

12. Pull control shaft (1) out of each side of the engine block.

13. Remove the bolts and remove two bracket assemblies ( 16) on each side of the 3512 Engine. The 3508 Engine has only one bracket assembly (16) on each side.

14. If necessary, use tool group (A) to remove bearings (17) from bracket assemblies (16).