Mainvue
GAS &
Multi-Generational
A selection of beautiful luxury homes, designed to accommodate multi-generation living.
The ground floor of each design features a dedicated guest suite with built-in or walk-in robe and a private bathroom or ensuite, providing the ideal space for extended family or visiting guests.
Multi-Generational
Display Locations
EAST
SOUTH-EAST
WEST
NORTH
Mt Atkinson estate, 19 Sierra Street 8306 6080
SINGLE STOREY FAÇADE
Eliana 232-S25
Adeline 266-S29
Carmelle 264-S28
DOUBLE STOREY
Emperor 483-D52
Amelia 290-D31
Lyla 352-D38
Alamora estate, 22 Monferrato Avenue P 8588 2440
SINGLE STOREY
Eliana 232-S25
DOUBLE STOREY
442-D48
SINGLE STOREY
Evoka 234-S25
DOUBLE STOREY
Malia 312-D34
and fixed site cost’ jobs, customer must sign a tender within 60 days, and sign a contract within 90 days, of payment of initial deposit. c. For all ‘untitled land’ jobs (not fixed site cost), customer must sign a tender within 120 days of payment of initial deposit and sign a contract within 45 days of registration of tile, however, commencement of construction on site must occur within 18 months of payment of the initial deposit. Please note: Henley requires a minimum of 90 days to commence construction work on site after the customer is the registered landowner of the site and this must be factored into the timing by customer. If customer does not sign contracts and provide proof of registration before the end of the 15th month of the customer’s price lock, Henley is entitled to withdraw the price lock offer. Commencement of construction work is the date when excavation works commence on site. d. For all ‘knock down rebuild’ jobs, the customer must sign a tender within 120 days and sign a contract within 180 days of payment of the initial deposit i) Regardless of the timing above, contracts must be signed before the end of the 15th month of the customer’s