HERITAGE BUILDING RENOVATION | Ryerson Revit Assignment

Paired Project | Work-sharing and Phasing

Advertisement

Duration : 5 weeks

Type : Design Development Drawings

Site location :

Project brief : The task of the assignment was to renovate a fictious, existing low rise office building in an urban setting, and turn it into a mid rise building. Aspects of the building will be demolished as well as constructed new with the goal of creating a mixed used commercial and office building. The existing building is a heritage property and existing façade was not allowed to be demolished. The ground floor was to be converted to a restaurant/ bar with related staff spaces, offices and kitchen with its own entrance and exits. Four additional office floors were expected to be designed with elevations aesthetically different than the floors below using curtain wall and basic wall assemblies. Phase