Fr anc e
G e rm a ny
Swi tzerl and
Black Box Animal Research Center In Novartis Campus
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Basel Analysis
Scale 1 : 10 000
2
Grid System
Campus Border
Tree System
Green Areas
Build Buildings
Selected Plot View
Main Entrances
Main Street - Fabrikstrasse
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Master Plan Scale 1 : 2000
Master Plan Analysis Scale 1 : 5000
3
Building Volume
Dark Volume Location
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Main Void Location
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Perimeter Space
Axonometric Campus View Scale 1 : 1000
Volume Studies Scale 1 : 1000
4
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Urban Plan Scale 1 : 500
Section A-A,B-B Scale 1 : 500
5
2 1 Green Roof 2 Technical Space
1
3
5
4
3 Auditorium 4 Rooftop Garden 5 Rooftop Seating
6 7
6 Display Medical Facility 7 Isolated Office Space 8 Open Office
8
9 10
9 Main Vivarium Space 10 Modular Free Space 11 Kitchen Space
11
14
12 15
15
17
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
12 Regular Office Space 13 Free Seating Area 14 Closed Meeting Room
16 15 Restaurant 16 Open Meeting Room 17 Main Entrance Space
Exploded View
Scale 1 : 500
6
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Manifesto Section Scale 1 : 100
7
5
4
3
1
2
1 2 3 4 5
Semi - Open Space Sitting Area Storage Space Kitchen Space Building Archives
Space Grid System
Flow of People
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Green Area Continuity
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Seating Views
Underground Level -1 Scale 1 : 200
Space Diagrams Scale 1 : 500
8
5
4
3 1
2
1 2 3 4 5
Building Entrance Siting Area Restaurant Conference Room Free Modular Space
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Ground Level Plan Scale 1 : 200
South Elevation Scale 1 : 200
9
1
2
3
2
1
1 Staircase 2 Mezzanine 3 Lower Restaurant
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Mezzanine Floor Plan Scale 1 : 200
East Elevation
Scale 1 : 200 10
Top Auditorium Space
Open Office Space
Open Meeting Space
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Internal Views
Supervisor : Francesca Battisti 11
4
5
3
1
2 1 2 3 4 5
Open Office Closed Meting Room Main Vivarium Space Regular Office Kitchen Space
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Floor Plan Level 3 Scale 1 : 200
North Elevation Scale 1 : 200
12
5
4
3
2 1
1 2 3 4 5
Open Meeting Space Resting Space Entrance Space Open Siting Area Free Modular Space
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Floor Plan Level 4 Scale 1 : 200
West Elevation Scale 1 : 200
13
4
2
5
3
1
1 2 3 4 5
Viewing Corner Lower Auditorium Display Medical Facility Special Meeting Room Open Kitchen Space
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Floor Plan Level 8 Scale 1 : 200
Section D-D Scale 1 : 200
14
Auditorium Space
Free Space
Office Space
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Internal Views
Supervisor : Francesca Battisti 15
4
5
2
3
1
1 2 3 4 5
Roof Top Siting Siting Space Auditorium Space Green Roof Roof Top Garden
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Roof Terrace Floor Plan Scale 1 : 200
Section C-C Scale 1 : 200
16
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Manifesto Section 2 Scale 1 : 100
17
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
External Views
Supervisor : Francesca Battisti 8
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
External Views
Supervisor : Francesca Battisti 8
Main Void Space
Auditorium Space
Display Medical Facility
Restaurant Space
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
3D Building View
Scale 1 : 500
Axonometric View
18
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Part Section 2 Scale 1 : 50
Part Facade Scale 1 : 50 19
Black Box Roof Detail
Black Box Glazing Detail
1
2
3
5
6
7
4
15 16 1
2
3
4
17
5
18 19
16 17 18 19 20 6
7
8
8
9
10
11
12
13 14 15
20
9
10
11
12
13 14
1 Soil 2 Geotextile 3 Drainage 4 Waterproofing 5 XPS Insulation 6 Precast Concrete 7 Preplaced Reinforcement 8 Bubble Deck 9 Gypsum Board 10 Support
11 12 13 14 15 16 17 18 19 20
Primary Structure Ceiling Cable L Bracket (Hot Rod) Insulation Strip Steel Flashing Façade Panel Panel Connection Façade Panels Anchor Insulation Roll Steel Flashing
1 Epoxy Finish 2 Underlay 3 Screed layer 4 Insulation 5 Precast Concrete 6 Preplaced Reinforcement 7 Bubble Deck 8 Gypsum Board 9 Support 10 Primary Structure
Entrance Detail
11 Bolt 12 Ceiling Cable 13 L Bracket (Hot Rod) 14 Insulation Strip 15 Mullion 16 Façade Panel 17 Façade Panels Anchor 18 Panel Connection 19 Steel Flashing 20 End Cap Mullion
Black Box Floor Detail
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
6
15
7 1
2
3
4
11 12 13
16
17
14
18
15
19
1 Flooring Tiles 2 Underlay 3 Plywood 4 Stud Frame 5 Insulation 6 Nail 7 Sealant Joint 8 Mullion 9 End Cap 10 Drainage Grill
20
11 Drainage Pipe 12 Waterproofing 13 Raised Floor Support 14 Flooring 15 Secondary Support 16 Precast Concrete 17 Preplaced Reinforcement 18 Bubble Deck 19 Reinforcement 20 Cast-In-Situ Concrete
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
8
9
10
1 Epoxy Finish 2 Underlay 3 Screed layer 4 Insulation 5 Gypsum Board 6 Reinforcement 7 Cast-In-Situ Concrete 8 Precast Concrete 9 Preplaced Reinforcement 10 Bubble Deck
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
11 12 13 14 15
Façade Panel Panel Connection Secondary Structure Façade Panels Anchor Insulation Roll
Facade Details
Scale 1 : 10
20
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Part Section 1 Scale 1 : 50
Part Facade 1 Scale 1 : 50 21
Roof Detail
Corner Detail 13 14 15 16
1
2
3
4
5 16
17 18 19 1
2
3
4
6
5
7
6
7
17
18 19
20
20
8
9
10
11
12
13 14 15
12
8
9
10
11
1 Soil 2 Geotextile 3 Drainage 4 Waterproofing 5 XPS Insulation 6 Divider 7 Rocks 8 Gypsum Board 9 Support 10 Reinforcement
11 Cast-In-Situ Concrete 12 Anchor 13 Steel Flashing 14 Sealant Joint SSG 15 Frosted Glass 16 L Bracket 17 Steel Cover 18 Wood Scrap 19 L Bracket (Hot Rod) 20 Window Blind
1 Raised Floor Panel 2 Support 3 Raised Floor Support 4 Cable Tray Support 5 Cable Tray 6 Reinforcement 7 Cast-In-Situ Concrete 8 Gypsum Board 9 Bolt 10 Insulation Roll
Facade Detail
Skylight Detail Part 1
1
1
2
3
4
11 Ceiling Steel Support 12 Insulation Sheet 13 Mullion 14 Insulation Strip 15 Sealant Joint SSG 16 Triple Glazing 17 Frosted Glass 18 Insulation Roll 19 L Bracket 20 Steel Cover Black
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
11 12
13 14 15
11 12
13 14 15
5 13 14 15 16 17 18 19 20
11
6
7
8
9
12
10
1 Raised Floor Panel 2 Support 3 Raised Floor Support 4 Cable Tray Support 5 Cable Tray 6 Gypsum Board 7 Support 8 Bolt 9 Reinforcement 10 Cast-In-Situ Concrete
11 L Bracket (Hot Rod) 12 Sealant Joint 13 Triple Glazing 14 Sealant Joint SSG 15 Mullion 16 Steel Cover 17 Screw 18 Wood Scrap 19 Steel Sheet 20 Window Blind
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
1 Floor Finish 2 Floor Support 3 Cast-In-Situ Concrete 4 Reinforcement 5 Raised Floor Support 6 C Profile 7 Insulated Mullion 8 Steel Sheet 9 Insulation Strip 10 Skylight Support
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
11 Steel Profile Skylight 12 Underlay 13 Flooring 14 XPS Insulation 15 Waterproofing
Inner Facade Details Scale 1 : 10
22
Delta Beams
Delta Beams and Columns
Shared Walls
Shared Walls Combined With Beams and Columns
Floor Structure with Beams, Columns and Shared Walls
Typical Beams
Typical Beams and Columns
Beams and Columns Combined with Concrete Slab
All Structural Elements Combined
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Axonometric Structure View Scale 1 : 350
Diagrams Section Loads Scale 1 : 400
23
1
2 3 4 5
N
6 7
5500
8
ncre
te Be
am 2 50/4
50 force
d Co
ncre
te Be
am 2 50/4
50 force
RC Beam 350/600
RC Beam 250/600
Rein
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
d Co
ncre
te Be
am 2 50/4
50
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Rein
force
d Co
ncre
te Be
am 2 50/4
Rein
force
d Co
Reinforced Concrete Beam 250/450
I
Delta Beam D30-300
Delta Beam D30-300
RC Beam 250/600
E Reinforced Concrete Beam 250/450
3600
Reinforced Concrete Beam 250/450
Delta Beam D30-300
7200
E
F Reinforced Concrete Beam 250/450
Delta Beam D30-300
Delta Beam D30-300
Delta Beam D30-300
G
RC Beam 250/600
Reinforced Concrete Beam 250/450
Delta Beam D30-300
7200
F
H
Reinforced Concrete Beam 250/450
Delta Beam D30-300
7200
Delta Beam D30-300
D'
RC Beam 250/600
C
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
RC Beam 250/600
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
C
Reinforced Concrete Beam 250/450
B
2100
2100
B
Reinforced Concrete Beam 250/450 RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
5100
RC Beam 250/600
Reinforced Concrete Beam 250/450
D Reinforced Concrete Beam 250/600
2100
D 2100
M
RC Beam 250/600
Reinforced Concrete Beam 250/450
Delta Beam D30-300
E'
5100
J
50
Reinforced Concrete Beam 250/450
Delta Beam D30-300
Delta Beam D30-300
6000
am 2 50/4
Reinforced Concrete Beam 250/450
3600 7200
G
F'
9600
te Be
RC Beam 250/600
G'
6000
ncre
Reinforced Concrete Beam 250/450
2100
Reinforced Concrete Beam 250/450
N
50
H
61000
11
Reinforced Concrete Beam 250/450
d Co
Rein
I 2100
force
RC Beam 350/600
Rein
Reinforced Concrete Beam 250/450
RC Beam 250/600
RC Beam 250/600
J
10
50
RC Beam 250/600
am 2 50/4
RC Beam 250/600
te Be
RC Beam 250/600
RC Beam 350/600
ncre
RC Beam 250/600
d Co
RC Beam 250/600
force
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
5100
9
50
RC Beam 350/600
am 2 50/4
RC Beam350/600
te Be
Reinforced Concrete Beam 250/450
5100
5100
ncre
Rein
K
5100
d Co
RC Beam350/600
5100
5100
L
force
RC Beam 350/600
Rein
RC Beam 250/600
5500
M
A
A 2' 1
3'
2
2700
4'
3
3600
2700
4
6000
5
9600
7200
5' 6
6000
7200
7
3600
7200
7200
8
9
10
11
7200
7200
2100
5100
2100
7200
7200
2100
5100
2100
55200
Level 2 Structural Plan 1 : 200
Column Calculation 2
350
25
25 500
25
450
Concrete C 35/45 FCD Concrete C 35/45 FCK structure Steel B450 C FYK 1 : 10 Steel B450 C FYD
35 600
530
600
35
500
600
Concrete C 45/55 Concrete C 45/55 Steel B500 C Steel B450 C
23.33 35.00 450.00 391.30
Axial factor Size of Side (mm) Selected Size (mm) Area of Reinforsment (2% of column) (cm) N of bars with d 28
0.80 490.06 500.00 50.00
FCD FCK FYK FYD
30.00 45.00 500.00 434.78
0.80 589.04 600.00 72.00 12.00
35 350
35
35
530
530
35
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 600 600 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
35
35
35
35
35
280
250
180
280
35
35
250
180
35
8.00
35 600
35
Column Section
Axial factor Size of Side (mm) Selected Size (mm) Area of Reinforsment (2% of column) (cm) N of bars with d 30
530
530
Material
Column Section
35
530
25
500
400
Material
1 : 10
35
600
Section Properties
Section Properties
structure
25
75.00 8.89 1.30 4.00 1.50 1316.78 8.00 810.00 35 11344.20
35
450
25
25
400
450
500
450
25 350 25
25
400
Tributary area of slab (m2) Dead load (kN/m2) Dead load Coefficent Live load (kN/m2) Live load Coefficent Loads/Floor (kN) Number of Floor Load of Roof (kN) 35 on Column (kN) 530 Load
350
25
44.00 9.25 1.30 4.00 1.50 793.10 7.00 810.00 6361.70
25
25
350
Tributary area of slab (m2) Dead load (kN/m2) Dead load Coefficent Live load (kN/m2) Live load Coefficent Loads/Floor (kN) Number of Floor Load of Roof (kN) Load350 on Column25(kN)
Loads
400
Loads
Column Section 2
Column Dark Volum
25
Column at Ground level
35
Column Section 1 25
Column Calculation 1
Supervisor : Francesca Battisti Professors : Mauro Marinelli,35Gianpaolo Rosati, Angela Silvia 35 530 Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants 600 : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Structural Plan type 1 Scale 1 : 200
Axonometric Views
24
1
2 3 4 5
N
6 7
5500
8 9
50
te Be
am 2 50/4
50 force
d Co
ncre
te Be
am 2 50/4
50
RC Beam 250/600
force
RC Beam 350/600
Rein
Reinforced Concrete Beam 250/450
d Co
ncre
te Be
am 2 50/4
50
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Rein
force
d Co
ncre
te Be
am 2 50/4
Rein
force
d Co
ncre
Reinforced Concrete Beam 250/450
Delta Beam D30-300
Delta Beam D30-300
E Reinforced Concrete Beam 250/450
3600
D'
RC Beam 250/600
Reinforced Concrete Beam 250/450
Delta Beam D30-300
E
F Reinforced Concrete Beam 250/450
Delta Beam D30-300
Delta Beam D30-300
Delta Beam D30-300
G
RC Beam 250/600
Reinforced Concrete Beam 250/450
Delta Beam D30-300
9600
F
H
Reinforced Concrete Beam 250/450
Delta Beam D30-300
7200
Delta Beam D30-300
Reinforced Concrete Beam 250/450
Delta Beam D30-300
7200 6000
I
RC Beam 250/600
RC Beam 250/600
C
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
RC Beam 250/600
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
C
Reinforced Concrete Beam 250/450
B
2100
B
Reinforced Concrete Beam 250/450 RC Beam 250/600
Reinforced Concrete Beam 250/450 RC Beam 250/600
5100
RC Beam 250/600
Reinforced Concrete Beam 250/450
D Reinforced Concrete Beam 250/600
2100
D
5100
M
Reinforced Concrete Beam 250/450
Delta Beam D30-300
Delta Beam D30-300
6000
G
E'
2100
J
50
Reinforced Concrete Beam 250/450
3600 7200
G'
7200
am 2 50/4
RC Beam 250/600
F'
2100
te Be
Reinforced Concrete Beam 250/450
2100
Reinforced Concrete Beam 250/450
N
50
H
61000
11
Reinforced Concrete Beam 250/450
ncre
RC Beam 350/600
d Co
Reinforced Concrete Beam 250/450
I 2100
force
Rein
Reinforced Concrete Beam 250/450
RC Beam 250/600
5100
Rein
Reinforced Concrete Beam 250/450
Reinforced Concrete Beam 250/450
J
10
0
RC Beam 250/600
am 2 50/4 5
RC Beam 250/600
te Be
RC Beam 250/600
RC Beam 350/600
ncre
RC Beam 250/600
d Co
RC Beam 250/600
force
RC Beam 350/600
am 2 50/4
RC Beam350/600
te Be
Reinforced Concrete Beam 250/450
5100
5100
ncre
Rein
K
5100
d Co
RC Beam350/600
5100
5100
L
force
RC Beam 350/600
Rein
RC Beam 250/600
5500
M
A
A 2' 1
3'
2
4'
3
2700
3600
4
6000
5
9600
7200
6
6000
7200
7200
7
3600 7200
8
9
10
11
7200
7200
2100
5100
2100
7200
7200
2100
5100
2100
35
2700
5'
350
25 25
25
450
35
530
500
25
25 350
25
25
450
25
500
400
structure 1 : 10
Beam Calculation 2
35
530 600
35
Section Properties
Section Properties
Material
Material FCD FCK FYK FYD
23.33 35.00 450.00 391.30
Beam Section A(s) (mm2) A22 = 380 mm2 Minimum Base (mm) (6bars x 2) A(s)` (mm2)
Concrete C 35/45 Concrete C 35/45 Steel B450 C Steel B450 C
FCD FCK FYK FYD
250
280
31.72 6.25 1.30 4.00 1.50 448.05 5.10 87.85 285.63 224.02 246.67 202.67
35
35
Tributary area of slab (m2) Dead load (kN/m2) Dead load Coefficent Live load (kN/m2) Live load Coefficent Load on beam (kN) Span (m) Distributed load (kN/m) Bending moment (kN.m) Maximum Shear Force (kN) h (mm) d (mm)
35
530 600
35
350
49.80 6.25 1.30 4.00 1.50 703.43 7.40 95.06 650.67 351.71 347.42 303.42
280
250
Loads
35
Tributary area of slab (m2) Dead load (kN/m2) Dead load Coefficent 35 Live load 530 (kN/m2) Live load Coefficent 600 Load on beam (kN) Span (m) Distributed load (kN/m) Bending moment (kN.m) Maximum Shear Force (kN) h (mm) d (mm)
35
180
Loads
Beam Section 2
Beam office
35
35
Beam Office Openings
Beam Section 1
180
Beam Calculation 1
350
1 : 10
b (mm)
25
600
Level 4 Structural Plan 1 : 200 structure
Concrete C 35/45 Concrete C 35/45 Steel B450 C Steel B450 C
35
400
450
25
500
400
35
600
500
350
25
35
25
35
25
25
350
400
450
530
25
25
55200
35 35
530
35
600
23.33 35.00 450.00 391.30
Beam Section 6447.47 18.00 308.00 3223.74 594.01
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
A(s) (mm2) A22 = 380 mm2 Minimum Base (mm) (4bars x 2) A(s)` (mm2) b (mm)
4237.31 12.00 220.00 2118.66 584.46
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Structural Plan Type 2 Scale 1 : 200
Axonometric Views
25
Pv Panels
Pv Panels Water Colection system
Water Colection system
DC
DC
Battery System Charge Controler
Ventilation Plan Type 3
Climate Data
AC
DC
Toilet Sytem
Building Power Inverter
Electric Grid
AC
AC
Toilet Sytem
Building Power Inverter
AC
Heating/Cooling System Fan Coil Unist Water
Ventilation Plan Type 2
Charge Controler DC
Electric Grid
Ventilation Plan Type 1
Battery System
Heating/Cooling System Fan Coil Unist
Water Reserve Water Pump
Water Distribution
District Heating (Backup)
Water Reserve Water Pump
Air Handle Unit
Heat Exchanger
Out
Distribution
District Heating (Backup)
Heat Exchanger
DHW Reversible Heat Pump
In
Boreholes
Building System During Winter
Air Handle Unit
Out DHW
Reversible Heat Pump
In
Boreholes
Building System During Summer
Level 4 Ventilation 1 : 300
Level 8 Ventilation 1 : 300
Building Shafts
Basement Wall
Building Data
External Floor
Energy Demand
Energy Demand
External/Internal Wall
External Roof
Ventilation Calculation
Energy Calculation LIGHT
Ventilation Calculation Area System One
5004 3000 4724 600
Office space Meeting Rooms Break Rooms Auditorium seating area
16012.8 9600 15116.8 1920 42649.6 6272
3192 3000
2.6 2.6 Total
8299.2 7800 16099.2
LIGHT0.9
900
2.7
2430
11.25
900
2.7
2430
11.25
Volume
m3/h
N‐1
63608.8 117228.24
1.84
System Three Type Vivarium 1 Unit System Four Office Part Vivarium 2 Vivarium Restorant
Totale Building
Danish Ventilation Standarts
Duct Type Points unit Monitors Unit One Main Pipe Computers Screens Unit Two Main Pipe Copy machines Unit Three Main Pipe Printers TV Unit Four Main Pipe
Volume
3.2 3.2 3.2 3.2 Total 2400
22400 System Two Science laboratories Supporting Labs
Hight
Ventilation Rate per surface area L/(s.m2) 0.3 0.3 0.6 0.3
150 0 0 300
L/(s.person) 2.5 2.5 2.5 2.5
l/s 1876.2 900 2834.4 930 6540.6
Air change m3/h 6754.32 3240 10203.84 3348 23546.16
n‐1 0.42 0.34 0.68 1.74 0.55
20 20
5 5
2972.8 2800 5772.8
10702.08 10080 20782.08
1.29 1.29 1.29
13728
0.9
Airflow m³/s
6540.6
6.5406
6.5406
5772.8
5.7728
5.7728
10125
10.125
10.125
10125
10.125
10.125
Non‐critical Industrial buildings 6 ‐ 9 5.5 ‐ 6 5.5
Duct size Cross‐sec. rectangular Energy per year area a in mm b in mm m²
Total Duct size airflow Quantity round m³/s mm
100.00 100.00 10.00 10.00 10.00 5.00
kWh/year 190.00 1200 0.960 1,400.00 590.00 1000 0.700 95.00 1200 360.00 1.200 320.00 1.200 1200 Total Per m2
800 700 1000 1000
MIN 4.5 3.5 3
MAX 9 6 5.5
Velocity
Ventilation
Energy DemanType m/s kWh/year 19,000.00 6.81 Main duct 140,000.00 5,900.00 8.25 Main duct 950.00 8.44 Main duct 3,600.00 1,600.00 8.44 Main duct 171,050.00 8.91
PRODUCTION PV SYSTEM
Name Parcial Energy lighting (pel) Energy Heat Pump (ed) Parcial Energy equip (pee) Energy Lighting+equip (el) 137 kWh/year per m^2 (wm) m^2 for solar panels (ms) m^2 for solar panels (fms)
Values
Units
92,892.50 93,180.00
kWh/year kWh/year
171,050.00
kWh/year
357,122.50
kWh/year
137.00
kWh/year
2,606.73
m^2
3,388.75
m^2
Description Energy needed for Lighting in the Building Electric energy needed , data from Appliances Energy Demand (pel+pee+ed) yearly production per m^2
Building Section With Systems
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science)
Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem
Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
Values 296,969.00 93,180.00 203,789.00 2,400.00 84.91 60.00 1,415.20 20.00 70.76
ms(1.30), deviation from the absolute south,
Description Units kWh/year Heat Demand , number from Casanova Energy Demand , Number from kWh/year Hd‐Ed=Hg kWh/year Basel ground heat documentation Hg/ao kW W/m Eg/epm m m
Quantity Hours year Heat Gain h W kW/h year 100.00 2,920.00 15.00 4,380.00 200.00 8,760.00 50.00 87,600.00 25.00 3,650.00 10.00 912.50 Subtotal 92,892.50
APPLIANCES ENERGY DEMAND
Type unit Monitors Computers Screens Copy machines Printers TV
Energy per year kWh/year 190.00 1,400.00 590.00 95.00 360.00 320.00 Total Per m2
Quantity 100.00 100.00 10.00 10.00 10.00 5.00
Energy Deman kWh/year 19,000.00 140,000.00 5,900.00 950.00 3,600.00 1,600.00 171,050.00 8.91
PRODUCTION PV SYSTEM
Name Parcial Energy lighting (pel) Energy Heat Pump (ed) Type Parcial Energy Unit equip (pee) Users Normal Energy Users Peak Lighting+equip (el) 137 kWh/year per m^2 (wm) m^2 for solar panels (ms) Type m^2 for solar Unit panels (fms) Office Part Vivarium Restorant
Values
HEAT GAIN Units
People kWh/year 92,892.50 93,180.00 kWh/year Area Density Quantity m2 m^2/pp 171,050.00 pp kWh/year 19,200.00 256.00 75.00 19,200.00 128.00 150.00 357,122.50 kWh/year
Description Energy needed for Lighting in the Building Electric energy needed , data from Hours year Heat Gain Appliances Energy Demand h W kW/h year 104.00 100.00 780.00 (pel+pee+ed) 3016.00 100.00 45,240.00 Subtotal 46,020.00 yearly production per m^2
137.00 kWh/year LIGHT eed/wm 2,606.73 m^2 Quantity Hours year Heat Gain ms(1.30), deviation from the absolute W kW/h year south, 3,388.75 m^2 h 100.00 2,920.00 15.00 4,380.00 200.00 8,760.00 50.00 87,600.00 25.00 3,650.00 10.00 912.50 Subtotal 92,892.50
eed/wm
HEAT PUMP
Name Heat demand (Hd) Electric demand (Ed) Heat Ground (Hg) Annual operating hours (ao) Energy from the ground (Eg) Energy per meter (epm) Lenght inside the earth (edi) Quantity of Probes (p) Deep of Each Probe
Type Unit Office Part Vivarium Restorant
Quantity Hours year Heat Gain 10125 36450 15.00 h W kW/h year 100.00 2,920.00 15.00 4,380.00 15.00 200.00 8,760.00 10125 50.00 36450 87,600.00 25.00 3,650.00 10.00 912.50 Subtotal 92,892.50
Very quiet Fairly quiet Less quiet Dwellings, Schools, Theaters,sound studies etc. hospital ward offices etc. 4.5 ‐ 6.5 n/a 3.5 ‐ 4 2 ‐ 2.5 2.5 ‐ 3.5 3.5 ‐ 4.5 1.5 ‐ 2 2 ‐ 2.5 3 ‐ 3.5 APPLIANCES ENERGY DEMAND
Main duct Branch duct Connection duct
Airflow l/s
People
Ventilation Rate per person
edi/p
EQUIPMENT Type Unit Computers (office) Monitors (office) Vivarium Equpment (pc)
Quantity
Hours year Heat Gain h W kW/h year 100.00 2,920.00 50.00 14,600.00 100.00 2,920.00 80.00 23,360.00 20.00 8,760.00 100.00 17,520.00 Subtotal 55,480.00
kW/h year 194,392.50
TOTAL HEAT GAIN
Building
Useful area
Heat gain
Heat gain/m2
m2 19,200.00
kW/h year 194,392.50
kW/h year m2 10.12
Technical Plants
26
Bubble Deck
Dark Volume
Closed Roof
Concrete
SSG Glazing
Glazing System
Glass Roof
Phase 1
Green Roof
Dark Film
Movable Roof
Phase 2
Summer
Winter
Summer Solstice
Winter Solstice
Building Physics Summer
Building Physics Winter
School of Architecture, Urban Planning, Construction Engineering Academic Year 2017-2018 Laurea Magistrale (Equivalent to Master of Science) Thesis Study Programme Architecture-Building Architecture Georgi Mihaylov Dimov Personal Number : 10498023
Rooftop Garden
Supervisor : Francesca Battisti Professors : Mauro Marinelli, Gianpaolo Rosati, Angela Silvia Pavesi, Golkar Narges , Noel Adolf Van Hattem Studio Assistants : Roberta Contrino, Maurizio Dilauro, Alisia Tognon Marco Cervio, Marta Gechelin, Ettore Valentini
XPS
Indoor Garden
Raised Floor
Blinds
Open Roof
Building Systems
27