Al Mansouri (M3B) Company Profile - Option 2

Page 1



I NDE X 1.

Al Mansouri 3B Group a. Group History b. Group Structure c. Vision & Mission

2.

Introduction of AL Mansouri 3B LLC

3.

Company Organizational Chart

4.

Financial Status

5.

Company Resouces

6.

Running Projects

7.

Major Executed Projects • MEP Projects

8.

List of Project

9.

Company Registration Documents

10. Company Certificates

3


AL MANSOURI 3B GROUP Structure AL Mansouri 3B Construction Group • Al Mansouri 3B LLC • Al Mansouri Gulf Contracting • Al Arz LLC (MEP) • Misan General (Transporting and Contracting) Al Mansouri 3B Commercial Group • Three Brothers (Commercial Investment) • Art Ware (Wooden & Furniture Factory) • Capital Homes (Building Materials) • Lamici Design • Royal Style Watches & jewelery L.L.C

4


AL MANSOURI 3B GROUP

AL MANSOURI 3B LLC

With more than 36 years, Al Mansouri 3B Group has been offering construction services with a focus on the growing in UAE Market. Mansouri 3B has faced Challenging and prestigious projects, span across, high rise building, big wide projects, steel structure and marine, hotels, club, hospital and other projects.

Al Mansouri 3B LLC is a part of the Al Mansouri 3B Group was established in the year 1981, one of the leading construction companies in Abu Dhabi & Other Arab Emirates (UAE). We are specialized in most types of Constructions, Steel Structure, Electromechanical, Marine works, Carpentry & Joinery and complete main wide projects.

M3B has been recognized as a pioneer within its scope of activities, under the leadership and guidance of its Chairman, Mr. Amer Al Omar Salem Mohamed Al Mansouri, enabling it to successfully fulfill all its undertakings. Since 1981,AL Mansouri 3B Group has grown from a single office organization to various companies spread over UAE doing sterling business in a variety of activities. Today, the Group offers a wide array of products & services. Total staff exceeds 1000 employees in different specializations, including professional and specialized experts, maintenance engineers, industrial engineers, technical supervisors, site operation experts, in addition to specialized labor force. Today Mansouri 3B Group consist of subsidiaries, with specialization in construction and commercial sections, which will shape the future in sustainable and prestigious way. M3B has adopted a comprehensive quality approach for its production, administrative and IT systems. M3B has implemented an integrated programme that led to the valued certification in an Integrated Quality, Environment, Health & Safety Management System (ISO 9001, ISO 14001 and OSHAS 18001).

Al Mansouri 3B L.L.C has successfully completed and take diverse number of construction projects with proper management, sequencing and design challenges. This has given the company a level of experience and confidence which enables us to continually undertake and successfully complete the most challenging projects in the construction industry. Our design input into every project we undertake, is an integral part of our operational approach. This ensures that the client benefits due to increased construction speed and efficiency while controlling cost. The success of our organization is due to our highly qualified and well experienced professionals from different countries by using advanced construction technology. We are operating branches in AL-Ain and Dubai Cities, Our management adopted & establish in company advance Quality Management System ISO 9001:2008, Environment Management System ISO 14001:2004, OHSAS 18001:2007 standards to organize the company in right direction of success. Our operational team is highly qualify & expert in advanced engineering technology. ď śM3B will ensure that its clients receive the required service at an efficient and timely manner. 5


Greetings and welcome to AL Mansouri 3B L.L.C. We are proud of the many great projects we have built in our 31-plus years history. Our experience includes projects in Abu Dhabi, Dubai and surrounding emirates states. We have extensive expertise with all type of construction facilities, Commercial Investments, Joinery furniture and an impressive resume of work in marine and general construction field. Please enjoy your trip around the world of AL Mansouri 3B. We look forward to have an opportunity to serve your needs in the near future.

6


OUR VISION AL MANSOURI 3B aims to become a global group with trusted for quality and assurance in the every business sector, signing under the prestigious projects for tomorrow’s world of business, harmonizing innovative and progressive technology with its experience, excellence and high-caliber work. Assurance is the foundation of every business. The sparkling of the Group is the result of our vision focused on uncompromising quality and excellence.

OUR MISSION Al Mansouri 3B LLC, from the very beginning, has always chosen a path that inspires trust and growth. As we grew, this cardinal principal was at the heart of every new business venture. As the need for specialization came up, AL Mansouri 3B spawned expansion and asset management plan. Our strategy is to create a worldwide network that will build on the strength of the individual companies within Group.

7


8


MAJOR PROJECTS BY M3B

9


PARK VIEW Client: Bloom Holding Consultant: MZ- Architects Contractor: AL Mansouri 3B LLC Location: Saadiyat Island Period: 2016-2017 Total Value: AED 204,338,790 Million

Scope of Work:

Park View is a mixed commercial and residential 3 buildings with Retail units. The development comprises distinct blocks of Residential and Serviced Apartments in G+9 floors following a perimeter building typology with an open space in the center two blocks are connected at the higher level by a bridge at the seventh floor along the north-west side. Swimming pool is placed on this bridge which shall be a semiprivate area for the residents, capturing all significant views across the open space. With area of 61,363 m2.

10


‫بارك فيو‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بارك فيو عبارة عن مبان جتارية و�سكنية خمتلطة مكونة من ‪3‬‬ ‫وحدات �سكنية‪ .‬ويتكون التطوير من كتل �سكنية �سكنية و�شقق‬ ‫خمدومة يف الطوابق ‪ 9 + 9‬بعد ت�صنيف املبنى املحيط مب�ساحة‬ ‫مفتوحة يف املركز‪ ،‬ويتم تو�صيل كتلتني على م�ستوى �أعلى بوا�سطة‬ ‫ج�سر يف الطابق ال�سابع على طول اجلانب ال�شمايل الغربي‪ .‬يتم‬ ‫و�ضع حمام ال�سباحة على هذا اجل�سر الذي يجب �أن يكون منطقة‬ ‫�شبه منف�صلة لل�سكان‪ ،‬والتقاط جميع وجهات النظر الهامة عرب‬ ‫الف�ضاء املفتوح‪ .‬مب�ساحة ‪ 61363‬مرت مربع‪.‬‬

‫‪11‬‬


PARK VIEW

12


13


SOHO SQUARE Client: Bloom Holding Consultant: MZ- Architects Contractor: AL Mansouri 3B LLC Location: Saadiyat Island Period: 2016-2017 Total Value: AED AED 166,412,000 Million

Scope of Work:

Construction of 2 residential plate but connect on the ground and first levels via connecting corridors and public, private and semi-private open spaces and amenities, area of 50,610 m2. With garden and swimming pool all Civil, MEP and landscaping works will be done by Al Mansouri 3B.

14


‫�سوهو �سكوير‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪15‬‬


SOHO SQUARE

16


17


AL MANSOURI TOWER Client: Mr. Mohd. Sultant AL Mansouri Consultant: Hanover Consultant Engineers Contractor: AL Mansouri 3B LLC Location: Abu Dhabi, UAE Period: 2012 Total Value: AED 135 Million

Scope of Work

Comm. & Residential Hotel Apartment Tower (4 Basement + GF+ MZ + 17 Typical + Roof)

18


‫برج املن�صوري‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪19‬‬


AL MANSOURI TOWER

20


21


AL QUBAISI TOWER Client: Mr. Mohd. Shiwah AL Qubaisi Consultant: National Engineering Bureau Contractor: AL Mansouri 3B LLC Location: Abu Dhabi, UAE Period: 2012 Total Value: AED 58,750 Million

Scope of Work

Comm. & Residential Hotel Apartment Tower (4 Basement + G+ Mezz. + 12 Typical + Roof)

22


‫برج القبي�سي‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪23‬‬


AL QUBAISI TOWER

24


25


AL MAZROUEI TOWER

Client: Heirs Ali Salmeen Ali AL Mazrouei Consultant: Syrconsult Consulting Engineers Contractor: AL Mansouri 3B LLC Location: Abu Dhabi, UAE Period: 2014 - 2016 Total Value: AED 46,049,930 Million

Scope of Work

Commercial & Residential Tower with (3 Basement + G round Floor + Mezz + Floor + 16 Typical Floors + Roof + Top Roof)

26


‫برج املزروعي‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪27‬‬


AL MAZROUEI TOWER

28


29


Z.H.O. Commercial & Residential Tower

Client: Zayed Higher Organization For Humanitarian Care Special Need & Minor Affair Consultant: National Engineering Bureau Contractor: AL Mansouri 3B LLC Location: Abu Dhabi, UAE Period: 2010 Total Value: AED 168 Million

Scope of Work

Comm. & Residential Hotel Apartment Building/ Tower (4 Basement + GF+ MZ + 23 Typical + Roof) for Zayed Higher Organization For Humanitarian Care Special Need & Minor Affair at Khaldiya, Abu Dhabi, UAE

30


‫زي �إت�ش �أو تور‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪31‬‬


AL MAZROUEI TOWER

32


33


AJYAL AMERICAN SCHOOL Client: Bin Omear Education Foundation Consultant: Al Suweidi Engineering Consultancy Contractor: AL Mansouri 3B LLC Location: Al Falah City, Abu Dhabi Period: 2015 to 2016 Total Value: AED 108 Million

Scope of Work

Construction of (GF + FF) various buildings like classrooms buildings, Administration building, Auditorium building, Stage / Theater hall with seating facilities, Restaurant building, Laboratory building, Swimming pools complex, Steel structure, Court yard, Plant-rooms, Children playing area (rubber flooring), External service block, Transformer building, Boundary wall, Tent parking area, Walk way & Drive way with all MEP works.

34


‫مدر�سة �أجيال الأمريكية‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪35‬‬


AJYAL AMERICAN SCHOOL

36


37


Al Mawaheb School Client: Bin Omear Education Foundation Consultant: Al Suweidi Engineering Consultancy Contractor: AL Mansouri 3B LLC Location: Al Falah City, Abu Dhabi Period: 2015 to 2016 Total Value: AED 108 Million

Scope of Work

Construction of (GF + FF) various buildings like classrooms buildings, Administration building, Auditorium building, Stage / Theater hall with seating facilities, Restaurant building, Laboratory building, Swimming pools complex, Steel structure, Court yard, Plant-rooms, Children playing area (rubber flooring), External service block, Transformer building, Boundary wall, Tent parking area, Walk way & Drive way with all MEP works.

38


‫مدر�سة املواهب‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪39‬‬


Al Mawaheb School

40


41


STS School Client: Bin Omear Education Foundation Consultant: Al Suweidi Engineering Consultancy Contractor: AL Mansouri 3B LLC Location: Al Falah City, Abu Dhabi Period: 2015 to 2016 Total Value: AED 108 Million

Scope of Work

Construction of (GF + FF) various buildings like classrooms buildings, Administration building, Auditorium building, Stage / Theater hall with seating facilities, Restaurant building, Laboratory building, Swimming pools complex, Steel structure, Court yard, Plant-rooms, Children playing area (rubber flooring), External service block, Transformer building, Boundary wall, Tent parking area, Walk way & Drive way with all MEP works.

42


‫املدر�سة الثانوية الفنية‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪43‬‬


Al Mawaheb School

44


45


EXECUTED HOSPITAL PROJECTS Client: Al Mussfah Ahalia Hospital Consultant: Al Arab Consultant Contractor: AL Mansouri 3B LLC Location: Al Mussfah, Abu Dhabi, UAE Period: 2012 Total Value: AED 128 Million

Scope of Work

Hospital Buildings Phase 1 & Phase 2 with latest amenities with underground parking Facilities Phase 1 1 Basement + GF + MZ + 5 Typical + Roof Phase 2 2 Basement + GF + MZ + 3 Typical + Roof Overall 150 bed Hospital

46


‫م�ست�شفى الأهلية‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪47‬‬


EXECUTED HOSPITAL PROJECTS

48


49


VILLAS Client: Musanada Consultant: National Engineering Bureau Contractor: AL Mansouri 3B LLC Location: Gayathi City, Abu Dhabi, UAE Period: 2013 - 2014 Total Value: AED 62 Million

Scope of Work

Construction of Residential Villa’s G+1+Roof + Service Block + Driver & Guardrooms with Boundary wall. (51 Villa’s) at Gayathi

50


‫جممع فلل‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪51‬‬


VILLAS

52


53


AL MAFRAQ COMMERCIAL STORES & OFFICES, INDUSTRIAL Client: Investment Holding Real State Consultant: Society Technology House Contractor: AL Mansouri 3B LLC Location: Plot No-401,402,403, Ind. Area, Mafraq Period: 2010 - 2011 (12 Months) Total Value: AED 65,813,860 Million

Scope of Work

Construction of steel structure project for the Commercial Stores & Offices (GF+MF) at Mafraq with total built-up area 46,000 M2

54


‫خمازن وجممعات جتارية يف املفرق‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪55‬‬


AL MAFRAQ COMMERCIAL STORES & OFFICES, INDUSTRIAL

56


57


AL MAFRAQ COMMERCIAL STORES & OFFICES, INDUSTRIAL Client: Investment Holding Real State Consultant: Society Technology House Contractor: AL Mansouri 3B LLC Location: Plot No-401,402,403, Ind. Area, Mafraq Period: 2010 - 2011 (12 Months) Total Value: AED 65,813,860 Million

Scope of Work

Construction of steel structure project for the Commercial Stores & Offices (GF+MF) at Mafraq with total built-up area 46,000 M2

58


‫خمازن وجممعات جتارية يف املفرق‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪59‬‬


COMMERCIAL STORES, OFFICES & BUSINESS CENTER COMPLEX

60


61


INDUSTRIAL Client: Investment Holding Real State Consultant: Society Technology House Contractor: AL Mansouri 3B LLC Location: Plot No-401,402,403, Ind. Area, Mafraq Period: 2010 - 2011 (12 Months) Total Value: AED 65,813,860 Million

Scope of Work

Construction of steel structure project for the Commercial Stores & Offices (GF+MF) at Mafraq with total built-up area 46,000 M2

62


‫جممعات �صناعية‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪63‬‬


INDUSTRIAL

64


65


MEP work Client: Investment Holding Real State Consultant: Society Technology House Contractor: AL Mansouri 3B LLC Location: Plot No-401,402,403, Ind. Area, Mafraq Period: 2010 - 2011 (12 Months) Total Value: AED 65,813,860 Million

Scope of Work

Construction of steel structure project for the Commercial Stores & Offices (GF+MF) at Mafraq with total built-up area 46,000 M2

66


‫�أعمال ميكانيكية‪ ،‬كهربائية و�سباكة‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪67‬‬


ADDITIONAL WORKS FOR ABU DHABI GOLF COURSE Client: Abu Dhabi Municipality / Golf Club Consultant: DIAR Consultant Contractor: AL Mansouri 3B LLC Location: Near to Khalfa City-A, Abu Dhabi Period: 1999 to 2000 (12 Months) Total Value: AED 23 Million

Scope of Work

External swimming pool with sitting lawn facilities, Main Fountains, Gymnasium with all equipment’s, Various type of Buildings (GF), External Landscaping works, Walk way & Drive way and all MEP works for the project.

68


‫نادي �أبو ظبي للغولف‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪69‬‬


ADDITIONAL WORKS FOR ABU DHABI GOLF COURSE

70


71


FLOATING MARINA FOR ABU DHABI INTERNATIONAL MARINA SPORTS CLUB Client: Public Work Department Consultant: Feras Consultant Contractor: AL Mansouri 3B LLC Location: Opposite Marina Mall, Abu Dhabi Period: 2000 to 2001 (12 Months) Total Value: AED 7,400,000 Million

Scope of Work

420 LM Floating Docks Marine Boat Parking for 186 Boats, Central rest area with tents structures and water and electrical facilities for boats, Supported by marine piles with special marine protect paint coating, Reinforced deck for the movable connection to the floating decks & All MEP Services.

72


‫نادي �أبو ظبي الدويل للريا�ضات‬ ‫البحرية‬ ‫العميل‪ :‬بلوم القاب�ضة‬ ‫اال�ست�شاري‪ - MZ :‬املهند�سني املعماريني‬ ‫املقاول‪ :‬املن�صوري ‪ 3B‬ذ‪.‬م‪.‬م‬ ‫املوقع‪ :‬جزيرة ال�سعديات ‪� ,‬أبو ظبي‪ ،‬الإمارات العربية املتحدة‬ ‫الفرتة‪2017 - 2016 :‬‬ ‫القيمة الإجمالية‪ 204،338،790 :‬مليون درهم‬

‫جمال العمل‪:‬‬ ‫بناء �سكني مميز بحيث يت�صل الطابق الأر�ضي وامل�ستويات الأوىل‬ ‫عرب ممرات وم�ساحات مفتوحة عامة‪ ،‬خا�صة و�شبه اخلا�صة‪،‬‬ ‫امل�ساحة ‪ ٥٠،٦١٠‬مرت مربع مع حديقة وحمام �سباحة‪ ،‬جميع‬ ‫الأعمال املدنية‪ ،‬الهند�سة امليكانيكية والكهربائية �سيتم القيام به‬ ‫من قبل املن�صوري ‪.3B‬‬

‫‪73‬‬


FLOATING MARINA FOR ABU DHABI INTERNATIONAL MARINA SPORTS CLUB

74


75


COMPANY LICENSES

76


COMPANY CERTIFICATES AND ISO

77


78



www.almansouri3bgroup.com


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.