CASE STUDY
PRIORS HALL, CORBY
Working with one of our nationwide house builders, we completed this project consisting of 81 units. The program was tight, especially at year end and half year end (June & December).
Advertisement
The scaffold was built progressively in 4 lifts, plus gable ends with gable end edge protection. Each block was fitted with a loading bay with rubbish chute and site staircase. The loading bay requirement was for a SWL of 15.0KN/M² UDL – which is our standard heavy-duty loading bay design for house builds. Birdcage scaffolds were installed to each floor level, with back propping to the underside of the joists on the first & second floors.
Following the successful completion of this project we are now working on phase 2 of the program with confirmation of phase 3. Our house building division prides itself on quality, health and safety and tidiness.