PCB Management how close they are to meeting their goals for the ultimate removal of all PCBs from service in Canada.

their site meets the minimum require ments for residual PCBs on surfaces and in soil in and around the areas

Historical sites

where PCBs were handled and stored.

Often in the past, before Swan Hills, Alberta, was open to PCB imports, owners stored PCB equip ment on their site. The MOE assigned a PCB site number and required the generator to register their PCB wastes. From that point on, an owner was in

Any rooms, substations or contain ers previously used for storage of PCBs must be wipe-tested for PCB residues. When floors or storage con tainers appear to be clean on visual inspection, wipe samples are taken without pre-cleaning. The PCB residues must be < 10 ug/100 cm sq or

the database and would remain there

until they got rid of their PCBs. PCB owners who have disposed of their PCBs are undertaking to have

the area will have to be decontaminat

their site listed as "historical" with the

staining or leakage occurred from drums, cables, potheads or transform ers, the container or storage room floor is decontaminated using a thorough solvent wash before confirmatory

MOE. In order to obtain the MOE let

ter acknowledging that a site has been removed from the "active" PCB list, owners must prove to the MOE that

ed and re-tested. In those instances where noticeable

AWI Specialists

wipe samples are taken. Where shipping containers are involved for storing PCB wastes out side, as opposed to inside of a build ing, samples of soil are taken from around the perimeter of the container and are submitted to the lab for direct

PCB analysis on each separate sample. In addition, based on site character istics, a modified leachate test is per formed on a composite of all soil sam ples taken to target other chlorinated hydrocarbons, heavy metals, PAHs, pesticides, etc., as the situation may dictate.

It must be kept in mind that even the most rigorous sampling and analy sis exercises cannot give the whole site a clean bill of health. It is not uncom

mon to find companies that are not aware that they still have PCBs in light ballasts, underground storage tanks, potheads, cables, compressors, electro magnets, rectifiers, circuit breakers,

in Water Filtration

switches, arrestors, etc.

Technology

If any PCB equipment is removed from service once your site has been

• In-house testing facility • Ptioenix Underdrain & Components • Ptioenix Airscour System • Phoenix Panel System & Components • On-site hydraulic profiling • Filter Audits & Pilot Filtration Studies

• Filter Refurbishments, Retrofits & Upgrades • Pressure Filter Packages • Custom Filter Media Installation & Design • Filter Strainers & Filter Internals

• Filter Maintenance & Inspection Service • High-Rate iron & Manganese Removal • Specialty Filter Media Sales

Call(403) 255-7377 wwvv.awifilter.com

de-listed, the PCBs will have to be transported off site to a licenced

receiving facility within 30 days to avoid having to re-register the site and go through the whole "decoimnissioning" process again. In these cases concerning PCBs, ignorance is not bliss. Before breaking out the champagne and celebrating your "freedom" from PCBs, it would be advisable to conduct a comprehen sive survey, preferably by a PCB spe cialist. Dr.

Smith

can

be

reached

esmith@pcbdisposalmc. com. For more information, circle reply card No. 166(See page 25)

flSH

PERFORMANCE FLUID EQUIPMENT INC. Central Region 169 Dufferin St. South, Units 25&26, Alliston, Ont. L9R 1E6

Phone:(705)434-9006 1-866-683-PUMP (7867) Fax:(705)434-9007

Web site: www.performancequip.com F.mail: info@perfnrmancequip.com Stocking Facilities Across Canada For all your pumping requirements, PERFORMANCE carries complete inventory on seepex Progressive Cavity Pumps/Parts as well as EMEC Metering Pumps PERFORMANCE also proudly represents American LEWA,Recessed Impeller and Submersible NonClog Pit Pumps,ALL-FLO Air Operated Diaphragm Pumps,Paco Centrifugal Pumps, Gresco Trash Pumps, J-Line Verticle Turbine Pumps, Hayward Gordon Pumps & Mixers, PFE Polymer Dosing Systems 68 Environmental Science & Engineering,September 2003

For more information, circle reply card No. 158(See page 25)

at


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.