Instant download Thermodynamic analysis and optimization of geothermal power plants can ozgur colpan

Page 1


Thermodynamic Analysis and Optimization of Geothermal Power Plants Can Ozgur Colpan

https://ebookmass.com/product/thermodynamicanalysis-and-optimization-of-geothermal-powerplants-can-ozgur-colpan/

More products digital (pdf, epub, mobi) instant download maybe you interests ...

Phase diagrams and thermodynamic modeling of solutions

Pelton

https://ebookmass.com/product/phase-diagrams-and-thermodynamicmodeling-of-solutions-pelton/

Applications of modern heuristic optimization methods in power and energy systems Lee Kwang Y.

https://ebookmass.com/product/applications-of-modern-heuristicoptimization-methods-in-power-and-energy-systems-lee-kwang-y/

Blast Furnace Ironmaking: Analysis, Control, and Optimization Ian Cameron

https://ebookmass.com/product/blast-furnace-ironmaking-analysiscontrol-and-optimization-ian-cameron/

Genetic Optimization Techniques for Sizing and Management of Modern Power Systems Juan Miguel Lujano Rojas

https://ebookmass.com/product/genetic-optimization-techniquesfor-sizing-and-management-of-modern-power-systems-juan-miguellujano-rojas/

Advances in Steam Turbines for Modern Power Plants

Tadashi Tanuma

https://ebookmass.com/product/advances-in-steam-turbines-formodern-power-plants-tadashi-tanuma/

Applied Power Quality: Analysis, Modelling, Design and Implementation of Power Quality Monitoring Systems

Sarath Perera

https://ebookmass.com/product/applied-power-quality-analysismodelling-design-and-implementation-of-power-quality-monitoringsystems-sarath-perera/

How the Qur'■n Works Leyla Ozgur Alhassen

https://ebookmass.com/product/how-the-quran-works-leyla-ozguralhassen/

Embedded Mechatronic Systems, Volume 2: Analysis of Failures, Modeling, Simulation and Optimization 2nd

Edition Abdelkhalak El Hami

https://ebookmass.com/product/embedded-mechatronic-systemsvolume-2-analysis-of-failures-modeling-simulation-andoptimization-2nd-edition-abdelkhalak-el-hami/

Geothermal Energy Systems Ibrahim Dincer

https://ebookmass.com/product/geothermal-energy-systems-ibrahimdincer/

ThermodynamicAnalysisandOptimization ofGeothermalPowerPlants

ThermodynamicAnalysis andOptimizationof GeothermalPowerPlants

OnderKizilkan

Elsevier

Radarweg29,POBox211,1000AEAmsterdam,Netherlands

TheBoulevard,LangfordLane,Kidlington,OxfordOX51GB,UnitedKingdom 50HampshireStreet,5thFloor,Cambridge,MA02139,UnitedStates

Copyright©2021ElsevierInc.Allrightsreserved.

Nopartofthispublicationmaybereproducedortransmittedinanyformorbyanymeans,electronicor mechanical,includingphotocopying,recording,oranyinformationstorageandretrievalsystem,without permissioninwritingfromthepublisher.Detailsonhowtoseekpermission,furtherinformationaboutthe Publisher’spermissionspoliciesandourarrangementswithorganizationssuchastheCopyrightClearance CenterandtheCopyrightLicensingAgency,canbefoundatourwebsite: www.elsevier.com/permissions

ThisbookandtheindividualcontributionscontainedinitareprotectedundercopyrightbythePublisher(other thanasmaybenotedherein).

Notices

Knowledgeandbestpracticeinthisfieldareconstantlychanging.Asnewresearchandexperiencebroadenour understanding,changesinresearchmethods,professionalpractices,ormedicaltreatmentmaybecome necessary.

Practitionersandresearchersmustalwaysrelyontheirownexperienceandknowledgeinevaluatingandusing anyinformation,methods,compounds,orexperimentsdescribedherein.Inusingsuchinformationormethods theyshouldbemindfuloftheirownsafetyandthesafetyofothers,includingpartiesforwhomtheyhavea professionalresponsibility.

Tothefullestextentofthelaw,neitherthePublishernortheauthors,contributors,oreditors,assumeanyliability foranyinjuryand/ordamagetopersonsorpropertyasamatterofproductsliability,negligenceorotherwise,or fromanyuseoroperationofanymethods,products,instructions,orideascontainedinthematerialherein.

LibraryofCongressCataloging-in-PublicationData

AcatalogrecordforthisbookisavailablefromtheLibraryofCongress

BritishLibraryCataloguing-in-PublicationData

AcataloguerecordforthisbookisavailablefromtheBritishLibrary ISBN:978-0-12-821037-6

ForinformationonallElsevierpublications visitourwebsiteat https://www.elsevier.com/books-and-journals

Publisher: BrianRomer

AcquisitionsEditor: GrahamNisbet

EditorialProjectManager: LeticiaM.Lima

ProductionProjectManager: PoulouseJoseph

CoverDesigner: MilesHitchen

TypesetbySPiGlobal,India

Contributors

Numbersinparenthesisindicatethepagesonwhichtheauthors’ contributionsbegin.

Sertaҫ Akar(17) NationalRenewableEnergyLaboratory (NREL),Golden,CO,UnitedStates

OlusolaCharlesAkinsipe(3) SchoolofEngineering&Built Environment,GriffithUniversity,Brisbane,QLD,Australia

PanagiotisAlexopoulos(131) LaboratoryofSoftEnergy ApplicationsandEnvironmentalProtection,Mechanical EngineeringDepartment,UniversityofWestAttica, Athens,Greece

SharjeelAshrafAnsari(249) DepartmentofEngineering Sciences,NationalUniversityofSciencesandTechnology,Islamabad,Pakistan

ChadAugustine(17) NationalRenewableEnergyLaboratory(NREL),Golden,CO,UnitedStates

MuhammadAziz(97) InstituteofIndustrialScience,The UniversityofTokyo,Tokyo,Japan

Young-JinBaik(315) ThermalEnergySystemsLaboratory,KoreaInstituteofEnergyResearch,Daejeon, RepublicofKorea

YusufBas ¸ ogul(113) DepartmentofMechanicalEngineering,EngineeringFaculty,AdıyamanUniversity, Adıyaman,Turkey

RiccardoBasosi(53) CenterforColloidandSurface Science,UniversityofFirenze,SestoFiorentino;R2ES Lab,DepartmentofBiotechnology,Chemistryand Pharmacy,UniversityofSiena,Siena;NationalResearch Council—InstitutefortheChemistryofOrganoMetallic Compounds,SestoFiorentino,Italy

JosephBonafin(43) TurbodenS.p.A.,Brescia,Italy

AriannaBonzanini(43) TurbodenS.p.A.,Brescia,Italy

GurcanC¸etin(263) DepartmentofInformationSystems Engineering,TechnologyFaculty,MuglaSıtkı Koc ¸ man University,Mugla,Turkey

GeorgeCharis(131) LaboratoryofSoftEnergyApplications andEnvironmentalProtection,MechanicalEngineering Department,UniversityofWestAttica,Athens,Greece

C.OzgurColpan(153) TheGraduateSchoolofNatural andAppliedSciences;FacultyofEngineering, DepartmentofMechanicalEngineering,DokuzEylul University,Buca,Izmir,Turkey

IbrahimDincer(207,225) CleanEnergyResearch Laboratory,FacultyofEngineeringandApplied Science,UniversityofOntarioInstituteofTechnology, Oshawa,ON,Canada

AnilErdogan(153) TheGraduateSchoolofNaturaland AppliedSciences,DokuzEylulUniversity,Buca,Izmir, Turkey

MehmetAkifEzan(153) TheGraduateSchoolofNatural andAppliedSciences;FacultyofEngineering, DepartmentofMechanicalEngineering,DokuzEylul University,Buca,Izmir,Turkey

MuhammadFarooq(315) DepartmentofMechanical Engineering,UniversityofEngineeringandTechnology,KSKCampus,Lahore,Pakistan

MiladFeili(167) DepartmentofMechanicalEngineering, FacultyofEngineering,UniversityofMohagheghArdabili,Ardabil,Iran

HikariFujii(83) GraduateSchoolofEngineeringand ResourceScience,AkitaUniversity,Akita,Japan

HadiGhaebi(167) DepartmentofMechanicalEngineering,FacultyofEngineering,UniversityofMohagheghArdabili,Ardabil,Iran

OnurVahipGuler(113) DepartmentofEnergySystems Engineering,TechnologyFaculty,MuglaSıtkı Koc ¸ man University,Mugla,Turkey

MuhammadImran(315) SchoolofEngineeringand AppliedScience,AstonUniversity,Birmingham,West Midlands,UnitedKingdom

MohammadAsharJamal(185) DepartmentofEngineeringSciences,NationalUniversityofSciencesand Technology,Islamabad,Pakistan

RaoHamzaJamil(185) DepartmentofEngineeringSciences,NationalUniversityofSciencesandTechnology, Islamabad,Pakistan

FirmanBagjaJuangsa(97) FacultyofMechanicaland AerospaceEngineering,InstitutTeknologiBandung, Bandung,Indonesia

KhurramKamal(249) DepartmentofEngineeringSciences,NationalUniversityofSciencesandTechnology, Islamabad,Pakistan

PrasadKaparaju(3) InstituteforAppliedSustainability Research(iiasur),Quito,Ecuador;SchoolofEngineering&BuiltEnvironment,GriffithUniversity, Brisbane,QLD,Australia

SpyridonKarytsas(65) GeothermalEnergyDepartment, DivisionofRenewableEnergySources,Centrefor RenewableEnergySourcesandSaving(CRES), Pikermi;DepartmentofHomeEconomicsandEcology, SchoolofEnvironment,GeographyandAppliedEconomics,HarokopioUniversity(HUA),Kallithea, Greece

KosmasA.Kavadias(131) LaboratoryofSoftEnergy ApplicationsandEnvironmentalProtection,Mechanical EngineeringDepartment,UniversityofWestAttica, Athens,Greece

AliKec ¸ ebas ¸ (113,263) DepartmentofEnergySystems Engineering,TechnologyFaculty,MuglaSıtkı Koc ¸ man University,Mugla,Turkey

ShoaibKhanmohammadi(279) Departmentof MechanicalEngineering,KermanshahUniversityof Technology,Kermanshah,Iran

OnderKizilkan(153,279) DepartmentofMechanical Engineering,FacultyofTechnology,IspartaUniversity ofAppliedSciences,Isparta,Turkey

ParthivKurup(17) NationalRenewableEnergyLaboratory(NREL),Golden,CO,UnitedStates

SaeidMohammadzadehBina(83) GraduateSchoolof EngineeringandResourceScience,AkitaUniversity, Akita,Japan

DiegoMoya(3) DepartmentofChemicalEngineering &GranthamInstitute—ClimateChangeandthe Environment,ScienceandSolutionsforaChanging PlanetDTP,ImperialCollegeLondon,London, UnitedKingdom;InstituteforAppliedSustainability Research(iiasur),Quito;CarreradeIngenierı´a Meca ´ nica,FacultaddeIngenierı´aCivilyMeca ´ nica, UniversidadTecnicadeAmbato,Ambato; Coordinacio ´ ndeInvestigacio ´ neInnovacio ´ n,ABREC, Quito,Ecuador

HafizAliMuhammad(315) ThermalEnergySystems Laboratory,KoreaInstituteofEnergyResearch, Daejeon,RepublicofKorea

FarayiMusharavati(279) DepartmentofMechanical andIndustrialEngineering,QatarUniversity,Doha, Qatar

GregF.Naterer(225) CleanEnergyResearchLaboratory, FacultyofEngineeringandAppliedScience,UniversityofOntarioInstituteofTechnology,Oshawa, ON;FacultyofEngineeringandAppliedScience, MemorialUniversityofNewfoundland,St.John’s, NL,Canada

Osman € Ozkaraca(263) DepartmentofInformation SystemsEngineering,TechnologyFaculty,MuglaSıtkı Koc ¸manUniversity,Mugla,Turkey

Murat Ozturk(207) FacultyofTechnology,Departmentof MechatronicsEngineering,IspartaUniversityof AppliedScience,Isparta,Turkey

MohammadMustafaPardesi(185) DepartmentofEngineeringSciences,NationalUniversityofSciencesand Technology,Islamabad,Pakistan

MariaLauraParisi(53) CenterforColloidandSurface Science,UniversityofFirenze,SestoFiorentino;R2ES Lab,DepartmentofBiotechnology,Chemistryand Pharmacy,UniversityofSiena,Siena;National ResearchCouncil—InstitutefortheChemistryof OrganoMetallicCompounds,SestoFiorentino,Italy

OlympiaPolyzou(65) GeothermalEnergyDepartment, DivisionofRenewableEnergySources,Centrefor RenewableEnergySourcesandSaving(CRES), Pikermi,Greece

TahirAbdulHussainRatlamwala(185,249) Department ofEngineeringSciences,NationalUniversityofSciencesandTechnology,Islamabad,Pakistan

ZabdurRehman(315) DepartmentofMechanicalEngineering,AirUniversityIslamabad,AerospaceandAviationCampus,Kamra,Pakistan

RonR.Roberts(225) CleanEnergyResearchLaboratory, FacultyofEngineeringandAppliedScience,University ofOntarioInstituteofTechnology,Oshawa,ON, Canada

HadiRostamzadeh(167) EnergyandEnvironment ResearchCenter,NirooResearchInstitute(NRI), Tehran,Iran

LalitChandraSaikia(293) DepartmentofElectricalEngineering,NationalInstituteofTechnology,Silchar, Assam,India

MuhammadNoumanSaleem(249) DepartmentofEngineeringSciences,NationalUniversityofSciencesand Technology,Islamabad,Pakistan

MuhammadAfzalSheikh(249) DepartmentofEngineeringSciences,NationalUniversityofSciencesand Technology,Islamabad,Pakistan

FarooqSher(315) SchoolofMechanical,Aerospaceand AutomotiveEngineering,CoventryUniversity,Coventry,UnitedKingdom

UzairAzizSuria(185) DepartmentofEngineeringSciences,NationalUniversityofSciencesandTechnology, Islamabad,Pakistan

WashimaTasnin(293) SchoolofElectricalEngineering, VelloreInstituteofTechnology,Vellore,TamilNadu, India

LorenzoTosti(53) CenterforColloidandSurfaceScience, UniversityofFirenze,SestoFiorentino;R2ESLab, DepartmentofBiotechnology,Chemistryand Pharmacy,UniversityofSiena,Siena,Italy

ShunsukeTsuya(83) GraduateSchoolofEngineeringand ResourceScience,AkitaUniversity,Akita,Japan

Variouscycleconfigurationsfor geothermalpowerplants

DiegoMoyaa,b,c,d,OlusolaCharlesAkinsipee,andPrasadKaparajub,e a DepartmentofChemicalEngineering&GranthamInstitute—ClimateChangeandtheEnvironment,ScienceandSolutionsforaChangingPlanetDTP, ImperialCollegeLondon,London,UnitedKingdom, b InstituteforAppliedSustainabilityResearch(iiasur),Quito,Ecuador, c CarreradeIngenierı´a Meca´nica,FacultaddeIngenierı´aCivilyMeca´nica,UniversidadTecnicadeAmbato,Ambato,Ecuador, d Coordinacio´ndeInvestigacio´neInnovacio´n, ABREC,Quito,Ecuador, e SchoolofEngineering&BuiltEnvironment,GriffithUniversity,Brisbane,QLD,Australia

1.1Introduction

Globally,thetransitionfromthepresentpetroleumdependentenergytechnologytogreenenergyisfundamentallycontingentonmakingadecisiononresult-driven renewablesystems [1].Mitigatingclimateissuesaswell aspromotingsustainabledevelopmentareunattainable withoutinnovativesystemsandtechnologytransfer.Featuressuchaslowgreenhousegasemissions,minimized environmentaldisruption,andtheviabilityoftechnology extractionhavedemonstratedgeothermalenergyasasustainableenergyresource [2] thatcouldbeharnessedand exploitedregardlessofclimaticfactors [3].TheEarth’s crusthousestherenewablegeothermalenergysource [4], usuallyassociatedwithtectonicactivityandvolcanicactivities [5].Typically,geothermalenergyislocatedasaheat sourceinhotrocks [6] aswellashydrothermalreservoirs intheEarth’scrust.

Geothermalenergyisconsideredasustainableclean renewableenergyresource.Theglobalinstalledgeothermal capacityisestimatedtobe12.729MWandthatisprojected togrowby68.46%in2020.Amongthegeothermalpower plantconfigurations,singleflash(41%)isthepredominant configurationfollowedbydrysteam(23%),doubleflash (19%),andbinary(14%).Thetripleflash(2%)andback pressure(1%)plantconfigurationsarelesspopular [7] Factorssuchastheheatreinjectionmechanism,geothermal applications,andgeologictimescalearebackstoppingthe acceleratedgeothermalreservoirheatextractionincomparisonwiththereplacementofheatinthereservoirs. However,methodsforheatreinjectionhavebeendeveloped toensuregeothermalenergyasarenewableenergy resource.

Geothermalfluidsaregenerallyusedtocaptureheat energyfromtheEarth’scrustandtransportittothesurface throughproductionwellsdrilledintothegeothermal

reservoir [8].Dependinguponthelocation,temperature, anddepthofthegeothermalreservoir,geothermalfluids consistingofmineral-coatedhotwaterknownasbrine andsteam(vapor-dominatedfluids)aregenerallyused [9].Theheatenergythatistransportedtothegroundsurface isfurtherprocessedforelectricitygenerationand/ordirect uses [8].Dependingonthegeothermalsitefeatures,thermal energycanbeharvestedfromdepthsof300to3000mand beyond.Atgreaterdepths,thermofluidsarenaturally occurringastheporoushotrockofthehydrothermaland geopressuredgeothermalreservoirs [10].Harvestingthe hotfluidsisacontingentfeatureofthesereservoirs,and variouscontrolmeasuresarefactoredtomaximizetheutilizationofthisheatenergy [11].Finally,theelectricalpower generationisdependentupontheapplicationofvariousgeothermalheat [12].Inthischapter,currentgeothermalpower plantsystemsandtheirsignificanceinapplyingcuttingedgegeothermalconfigurationsaswellasundertaking researchonhybridconfigurationsarepresented.

1.2Geothermalpowerplantsystem

Theabundanceofhydrothermalresourceshasinfluenced thedevelopmentofgeothermalpowerplantarrangements andsystems [13].Geothermalpowerplantscanbeclassified assingle-flashsteampowerplants,double-flashsteam powerplants,drysteampowerplants,binary(Organic Rankine-KalinaCycle)powerplants,andadvancedgeothermalenergysystems.Theadvancedgeothermalenergy systemsarefurtherclassifiedashybridsingle-double-flash systems,hybridflash-binarysystems,hybridfossilgeothermaltechnologies,andhybridotherrenewableheat source-geothermalsystems [12].Geothermalpowerplants arebestgroupedintosteamandbinarycyclesforcycles forhigherwellenthalpiesandlowerenthalpies,respectively

[14].Thischapterwillassessthethermodynamicaspectsof thefivegeothermalpowerplantconfigurations.

1.2.1Single-flashsteampowerplants

Thesingle-flashsteampowerplantisthesimplestgeothermalpowertransformationarrangement.Thisconfigurationfacilitatesliquid-vaporproductionfromthe geothermalproductionwells.Basedontheirlargedensity disparity,theseareseparatedintotwodissimilarphases: steamandliquidwiththesupportofacylindricalcyclone pressurevessel [14].Theterm“single”depictsasingle flashingmechanismofthegeofluidobtainedbydepressuringthegeothermalfluidpressure [15].Thiscanbe achievedinaproductionwell,areservoir,oracycloneinlet tosupportthetransitionofpressurizedliquidtoliquid-steam mixtureproduction.A30MWsingle-flashgeothermal powerplantdemandsbetween5and6productionwells and2–3reinjectionwellsappropriatedalongwiththegeofluidresource [15].Further,pipesaredeployedformixture accumulationandtransportationfromthevariousgeo-

thermalproductionwells.Theidentifiedconstraintisthe dropinvaporpressureduetothepipefrictionalforceassociatedwithharvestingmechanisms [16].Empiricalcorrelationsareinvestigated,consideringtheircomplicationand reliability,bydeployingfactorssuchasthevapormassflow rate,thedensity,thepipediameter,thelength,andthecomponentsofthepipetoforecastpressureloss.Thevariables aresignificantcomparedtotheinvestmentcostofthepower plantandtheenergyconversiontechnology [16].Aturbine generatorproduceselectricalenergyfromvapor(around 99.95%dry)afterseparationofthevaporandliquid [15] Thechoiceofasingle-flashprocessisapplicablewhen thegeothermalfluidtemperatureexceeds260°Cwiththe attainmentofacapacityfactorbetween95%and100% [10]

Fig.1.1 showsthesingle-flashprocessofenergyconversiontechnology.Station1iswherethesingle-flash steampowerprocesscommenceswhilethegeothermalfluid accessestheproductionwellthroughthesourceinlettemperature.Betweenstations1and2(producingpipes),a pressuredropoccurs,andthisfacilitatestheboilingofthe fluid(avapor-liquidmixture)beforeitistransportedto

FIG.1.1

station2.Atstation5,itcollectssteamfromthemixture fluidafterseparationwhilethebrine(mineral-ladenhot water)iscollectedatstation3beforereinjectingatstation4.

Atstation5,theinducedmotionoftheturbinegenerator supportstheelectricalenergyattheentranceofthesteam, followedbytheproductionofsteamexpansionalongwith theturbinetostation6atcondenserpressure.Anaircooler condensermaybeusedatstationc1toallowthecoolingof airandexitatstationc2 [15].Thesignificanceofcertain plantequipmentintheoperationofasingle-flashsteamgeothermalpowerplantisgreatlyacknowledged.Inthisconfiguration,largeamountsoffreshwaterarenotneededfor cooling [18].Nevertheless,coolingthetower,particularly thedryregionswithoutfreshwater,isachievedby deployingcoolingwaterobtainedfromcondensed steam [16].

Fig.1.2 isathermodynamicstate(T-s)diagramanalyzingthesingle-flashsteamconversionprocess.Itshould benotedthatmassconversionandtheenergyconversion

principle,thetwofundamentalthermodynamicprinciples, areconsideredintheinvestigationoftheprocesswiththe aidofthediagram.Inasingle-flashpowerplant,flashing occurswhenthegeothermalfluidunderpressureinitiates theprocessclosetothesaturationcurveatstate1 (Fig.1.2).Thechangeinthepotentialorkineticenergyis notconsidered,andtheenthalpy(h)isdesignedasconstant, h1 ¼ h2,ascanbeseeninEq.(1.1)in Table1.1.Afterthe flashingprocess,theseparationprocessoccursatstate2, andissimulatedatconstantpressure.Further,thevapor andliquidmixtureisshown,ascertainingthemixture qualityinthisstate.Thedrynessfraction(x2)drivesthis quality,asshownbyEq.(1.2)in Table1.1.Thequantity ofvaporenteringtheturbineisrepresentedbythesteam massfraction.Eq.(1.3)in Table1.1 showstheworkperunit mass(w1)generatedbytheturbineexpansionprocess betweenstates4and5.Thepotentialandkineticenergy arenotgenerallyconsidered,andheatlossesareneglected whenthethermalfluidentersandleavestheturbine. Eq.(1.4)in Table1.1 istheisentropicturbineefficiency, whichisdenotedby t.Thisisconsideredtheratioofthe actualworktothatoftheisentropicwork,whichistheideal processfromstates4to5.Eq.(1.5)indicatestheturbine grossmechanicalpower( _ Wt ).Theelectricalpoweroutput ofthegenerator(Eq.1.6)isgivenastheturbine’s mechanicalpowertimestheefficiencyofthegenerator ( g).Lastly,atstates5and6,thecondensationandcooling processesoccur,andEq.(1.7)givesthecoolingwaterflow rate [4]

Forthepurposeofanalyzingthewholeplantefficiency, thesecondlawofthermodynamicsisinvestigated [16].This allowsitsexaminationincontrasttotheactualpoweroutput towardthefinishofthesingle-flashprocessandtothe utmosttheoreticalpowerthatisgeneratedbythegeothermal fluid [15].Exergyistheenergyfeasibletobeusedandthe capacitytoproduceworkfromenergy [16].Eq.(1.8)presentedin Table1.2 definesthespecificexergy(ex)ofthe

FIG.1.2 Temperature-entropy(T-s)diagramofasingle-flashcycle [4]
TABLE1.1 Equationsusedforthermodynamicstateanalysis [15]

TABLE1.2 Exergyandpowerplantefficiency [19].

Thermodynamic dimensionEquation

geothermalfluidforagivenpressure(P),temperature(T), ambientpressure(PO).andambienttemperature(TO). Eq.(1.9)showstheexergeticpower,alsoknownasthe maximumtheoreticalthermodynamicpower,whichisthe totalgeothermalmassflowratetimestheexergy.Finally, theexergyefficiencyoftheentirepowerplantisgivenby Eq.(1.10) [19].

Thereareseveralenvironmentalimpactsofsingle-flash geothermalpowerplants [15].Locationssuchasthecooling tower,theejectorvents,thepipelinedrains,thesteam tramps,thesilencers,themufflers,andthewellhead,which offersastructuralinterfacebetweenthewellsandtheproductionsystem,aretheprimeareasofpollution [18].The blendingofnoncondensablegasessuchasmethane (CH4),hydrogensulfide(H2S),andcarbondioxide(CO2) fromthesteamofgeothermalreservoirsisconsidereda mainenvironmentalconcern.Thesegasesare,however, subjectedtotreatmentandisolationbeforebeingdischarged intotheatmosphere [20].Further,inspiteofitsCO2 emissions,theGHGemissionsfromasingle-flashgeothermal powerplant(0.06kgCO2/kWh)aresignificantlylowerthan thetraditionalcoal-fired(1.13kgCO2/kWh)ornatural-gasfiredpowerplants(0.59kgCO2/kWh) [13].Withrespectto footprint,thelandrequirementsofacoal-firedpowerplant (40,000m2/MW)andasolarphotovoltaicpowerplant (66,000m2/MW)aremuchhigherthanthe1200m2/MW requiredforasingle-flashplant [15].Ingeneral,theloss ofcharacteristicbeauty,ozone-depletingsubstances,land andwaterutilization,visualandnoisepollution,andwater contaminationaresomeoftheotherenvironmental concernsassociatedwithgeothermalpowerplants [10] Strategiestomitigatetheenvironmentalimpactsof single-flashgeothermalpowerplantasproposedin [20] includemufflersandsilencerstoabatenoisepollution, air-cooledcondensers,reinjectionforsurfacewater,and preventingexpansionofgeothermalprojectsintonational parks.Byandlarge,theemissionsfromgeothermalpower plantsareinconsequentialcomparedtofossil-fuelconventionalpowerplants.

1.2.2Double-flashsteampowerplants

Thedevelopmentofthedouble-flashsteamgeothermal powerplantwastosupportpowergenerationbytheuse ofamixtureofvaporandliquidwatergeneratedinthegeothermalproductionwells [21].Adouble-flashpowerplant isconsideredmoreadvantageousthanasingle-flashpower plant,astheformercangenerate25%moreoutputpower thanthelatterunderthesamegeothermalfluidconditions [13].However,double-flashsteampowerplanttechnology ismorecomplexanditsoperationandmaintenanceare moreexpensivethansingle-flashpowerplants.Nevertheless,theefficientuseofthegeothermalresourceisa pointerthatasecondaryflashprocessisvaluable.Theuse ofasecondpressuredropinasecondaryflashprocess (secondseparator),afterthefirstpressuredrop,supports theproductionofextravaporfromtheseparatedliquid exitingthefirstseparator.Further,thecoupledturbinegeneratorisabletoproduceadditionalpowerduetothesupply oflower-pressuresteam [22] ortoaturbinedependingon theconfiguration [23].Thedouble-flashpowerplant’scompleteexergyperformanceisoptimallyboostedduetothe separatorofthegeothermalsteam-water,whichistheprincipaltechnologicaldevelopmentofthispowerplant technology.

Uponcomparisontoasingle-flashsystem(Fig.1.1),a double-flashconfiguration(Fig.1.3)usesadual-admission turbineandalow-pressureseparator.Forthepurposeof smoothcombinationwiththeexpandedhigh-pressure steam,thelow-pressuresteamissuppliedtotheturbineat therightstage [15] Fig.1.3 presentstheenergyconversion processinadouble-flashsteamgeothermalpowerplant. Thedouble-flashsteampowerprocesscommencesat station2;thesourceoftheinlettemperatureisthecorridor ofthegeofluid.Thefirstflashed-steamprocessoccurs betweenstations1and2,whenthepressuredropsandthe fluidsbegintoboil(mixturesteam-liquid)beforereaching theseparatoratstation2.Thefluidmixtureisthenseparated intothebrineandhigh-pressuresteam.Themineral-laden brinehotwater(station3)isthendownwardlycontrolled tolow-pressure(station8)andhigh-pressuresteam(station 5)withthesupportofaseparator.Thispromptsthesecond flashed-steamprocess.Thesecondpressuredropatstation9 willleadtotheproductionofasteam-brinemixtureandthe brineiscollectedbythelow-pressureseparator.Thesecond steamisinjectedintothesystematstation9andtheturbine collectsthesecondfreshlow-pressuresteam.Atstation5, thefirsthigh-pressuresteamgainsaccesstotheturbineafter theinitialsteaminjection.Theinducedmotionofthedualinjectionturbine,connectedtoagenerator,generateselectricalenergy.Thecondenserpressureatstation6,connected totheturbine,isthelocationwherethesteamexpansion happens [15].Withrespecttotheprocessdesign,thefirst stageadmissionorinjectionoftheturbineshouldhave

Production well

Silencer

Well valves

Ball check valve

Injection well

Condensed water pump

High-pressure cyclone separator

valve

Steam jet ejectors

Condenser

Condensate pump

High-pressure turbine

Low-pressure turbine

Low-pressure flash separator

FIG.1.3 Double-flashgeothermalpowerplantwithadualadmissionturbine [15,17]

thesamepressuredifferencebetweenthehighandlowseparators [24].Thehigh-pressurestagemassflowisexpected tobelowerthanthelow-pressurestagemassflow.The residualhotfluidsatstation6arecondensedbyusingan air-cooledcondenser.Coolairissuppliedatstationc1 andexitedatstationc2.Finally,theresidualbrinefrom thesecondflashedprocessatstation10andthecondensed fluidfromstation7isreinjectedintothesystematstation4 (Fig.1.3).

Thetemperature-entropy(T-s)ofadouble-flashpower plantispresentedin Fig.1.4.Thetwoflashprocessesthat existinstates1–2and3–6aresignificant,andtheyare studiedseparatelyasasingleprocess [15].Toascertain thequantityofsteamgeneratedintheseparatorsateach flashedprocess(x2 instates1–2and x6 instates3–6,theseparationprocess),Eqs.(1.11)–(1.14)in Table1.3 areapplied. Further,theevaluationofthesteamatstate2andthe brineatstate6,obtainedfromdifferentseparatorsatthe high-andlow-pressurestages,wasachievedbyusingfour equations,asshowninEqs.(1.15)–(1.18).Again, Eqs.(1.15),(1.17)givethemassflowrateofsteamgeneratedathighpressure( _ m hps ,atstate5)aswellasatlow pressure( _ m lps ,atstate8),respectively.Also,Eqs.(1.16),

Moisture remover

Steam tramp

Control valve

Throttle valve

Generator

Electric grid

Wellhead

(1.18)areusedtocalculatethemassflowrateofbrineproducedathighpressure(m hpb ,atstate3)andlowpressure (m lpb ,atstate7).Thelow-pressureturbinestage(atstate 9)accommodatesthehigh-pressureandlow-pressure steamstogether.WiththeaidofEqs.(1.15)–(1.18),four valuesareappraised:thedisposedwasteliquid,the

FIG.1.4 Temperature-entropyprocessdiagramforadouble-flashpower plantwithadualadmissionorinjectionturbine [15]

TABLE1.3 Thermodynamicequationsfordouble-flashgeothermalpowerplants [14,15]. State

Turbineexpansion process High-pressurestage(Eqs.1.22–1.23arethe Baumannrule) whpt ¼ h4 h5 (1.19) hpt ¼ h4 h5 h4 h5s (1.20) W hpt ¼ m hps whpt ¼ x2 m total whpt (1.21) h5 ¼ h4 A 1 h7 h8 h7 1+ A h8 h7 (1.22) A ¼ 0.425(h4 h5s) (1.23)

Turbineexpansion process Low-pressurestage m 5 h5 + m 8 h8 ¼ m 5 + m 8 ðÞ h9 (1.24) h9 ¼ x2 h5 +1 x2 ðÞx6 h8 x2 +1 x2 ðÞx6 (1.25) wlpt ¼ h9 h10 (1.26) W lpt ¼ m 9 h9 h10 ðÞ (1.27) h10 ¼ h9 Ax9 h11 h12 h11 1+ A h12 h11 (1.28)

A ¼ 0.425(h9 h10s) (1.29) lpt ¼ h9 h10 h9 h10s (1.30) W total ¼ W hpt + W lpt (1.31) W e , gross ¼ g W total (1.32)

condenserheatdissipated,thecoolingwaterheatlosses,and theturbinepowerproduction.

Thissystemisappliedfortheillustrationofthetwo turbineexpansionprocesses.Eq.(1.19)istherepresentation ofthe firstturbineexpansionprocess producingwork(whpt) thatoccursbetweenstates4and5.Eq.(1.26)describesthe secondturbineexpansionprocess producingwork(wlpt).

Thus,foratypicaldouble-flashpowerplantwiththe high-pressure( hpt)andlow-pressure( lpt)processes,two isentropicturbineefficienciesarederivedbyusing Eq.(1.20),andalow-pressureprocess( lpt)byusing Eq.(1.30).Thefirstturbinestagepowerproducedathigh pressure( _ W hpt )andthesecondstagepowerproducedat lowpressure(W lpt )aredefinedbyusingEq.(1.21)and

Eq.(1.27),respectively.Eq.(1.31)providestheaggregate turbinepowerproduced( _ W total ),whichisanadditionof individualturbinestagepowergenerated.Lastly,as explainedinEq.(1.32),theefficiencyofthegenerator ( g)impactstheelectricalpower(W e, gross ).Theefficiency oftheoverallpowerplant,theincominggeothermalfluid exergy,theenvironmentalimpacts,andthedeployed equipmentaresimilartothatofthesingle-flashprocess [24,25].

1.2.3Dry-steampowerplants

Studieshaveshownthatseverallocationsaroundtheglobe areendowedwithgeothermaldry-steam,particularlyin placessuchasthegeysersintheUnitedStatesandLarderello,Italy.Bothplaceshavethetwolargestdry-steam reservoirs.However,placessuchasCoveFort,Utah,United States;Wairakei,NewZealand;Matsukawa,Japan;and Kamojang,Indonesiaarecharacterizedbylimiteddrysteam [16,20].Intheeventthatageothermalreservoirdries, ZarroukandMoon [16] discussedthepossibilityof

convertingtheflashedgenerationsystemsintoadry-steam system.Consideringhighenthalpysystemconfigurations, dry-steamgeothermalpowerplantsarethemostefficient becausethehydrothermalreservoirssupporttheseconfigurationswithvapor-dominantgeothermalfluidathightemperatures [25,26].Thecoupledturbinegeneratorisable togenerateelectricalenergyusingthesteamsupplied directlyfromtheproductionwell [10]

Indry-steampowergeneration,between50%and70% ofthegeothermalfluidavailablework(exergy)isconverted intoelectricalpower [25].Uponcomparisonwiththesteamflashedprocess,thedrysteamhasasimplerconceptand requirescentrifugalcyclonestoseparateparticulatematters suchasrockchippingsanddust [25].Similarly,thecondensateiseliminatedbyusingdrainpots,andthelast moistureiseliminatedtoachievehigh-gradesteaminthe turbine.AVenturimeterisalsoneededfortheaccuratecalibrationoftheturbinesteamflowrate [13]

Themechanismofconversionofenergyinthedry-steam powerplantprocessisdescribedin Fig.1.5.Bothsingleflashanddry-steam(geothermalfluid)processesshare

FIG.1.5 Dry-steamgeothermalpowerplant [9,17]

similarfeaturesofthewholepowergenerationcycle,from theproductionwellstotheproductionturbine [15].Forboth smallerorlargerunitsofsingleflowordoubleflow,asingle pressureisperformedbythebladingturbineofimpulsereaction.Basedonthegraphs, Fig.1.1 (singleflash)shares thesamesimilaritywith Fig.1.5 withaparticulateremover ratherthanacycloneseparator.

Fig.1.6 istheT-sthermodynamicstateofthedry-steam system.Atstate1,saturatedsteamorlightlysuperheated steamisgeneratedintheproductionwells.Theexpansion oftheturbineoccursbetweenstates1and2whilethe coolingprocessisattainedbetweenstates2and3,where anemissionofheatviathecondenseroccurs.Thesingleflashgeothermalpowerplantsystemisequivalenttothe thermodynamicstudy [18] Table1.4 showstheequations inanalyzingthedry-steampowerplants.Intermsofimpacts ontheenvironment,thesingle-flashgeothermalpowerplant processhasalowerenvironmentalimpactthanflashed powerplants,asthesystemdoesnotusemineral-laden brine [15].

FIG.1.6 Temperature-entropy(T-s)processdiagramforadry-steam powerplantwithsaturatedsteamattheturbineinlet [15,18]

TABLE1.4 Thermodynamicequationsinthedry-steam processforturbineexpansionprocess [15]

1.2.4Binary-organicRankinecycleand Kalinacyclepowerplants

Thebinarygeothermalpowerplant(B-GPP)generateselectricalenergyfromasecondaryseparatedprocess.Preheatingoftheworkingfluidisinvolvedandheatislost uponcontactingthegeothermalfluid [10].Geothermal resourceswithatemperaturerangeof20–150°C [25] or 85–170°C [27] arewellsuitedforbinaryconfigurations [25].Ahighertemperaturerangeprovidethermalstability oftheworkingfluidwhilethelowertemperaturesaremore feasibleintermsoftechnoeconomicandfinancialfactors. Further,theimpactsofcorrosionandscalingarenot apparentathightemperature,asthereisnocontactbetween thepowergenerationequipmentandthegeofluid.Undera conventionalRankinecycle,thereisthefunctionalityofthe secondaryfluid(workingfluid)inthebinarysystem [28], andthebinarycycleisidentifiedastheOrganicRankine Cycle(ORC)duetotheorganicnatureoftheworkingfluid.

Binarypowerplantsareversatileandthefunctionalityof thepowerplantisdecidedbythesecondarycycle.Different typesofconfigurationsofbinarypowerplantsareinoperation,includingB-GPPusinganORCwithaninternalheat exchanger(IHE),B-GPPwitharegenerativeORC,and B-GPPwitharegenerativeORCusingIHE [29].In1982, KalinapatentedavariationinB-GPP [30].Theworking fluidusedintheKalinacycleconsistsofwaterandammonia andcanbeusedindifferentcompositionstosuitvarious configurations [31].Athermalefficiencyof30%–40%is achievableandisconsideredmoreefficientthanthatof anordinaryB-GPP [28].

AclosedloopofathermodynamicRankineCycleused fortheenergyconversionsystemofabasicbinarygeothermalpowerplantisshownin Fig.1.7.Harvestingthe geothermalfluidviatheproductionwells(PW)andthen transportingitthroughvariousprimarycyclecomponents necessitatesthatpumpingsystemsaredeployed.The scouringanderosionofpipesandtubescanbeprevented byextractingsandfromthegeofluidbyemployingsand removers(SR).Finally,anevaporator(E)andapreheater (pH)areusedforcontinuousfluidflowwhilethegeothermalfluidisreinjectedintothereservoirnearthe injectionwell(IW)byusinganinjectionpump(IP).

Regardingtheworkingcycle,twoheating-boilingproceduresareincludedintheworkingfluid.ThePHisthe locationoftheboilingpointoftheworkingfluid.Upon contactofPHwithE,theworkingfluidbecomesasaturated vapor.Thisresultsintheexpansionandcondensationofthe workingfluidintheturbine.Theworkingfluidisthen returnedtotheevaporator,therebyconcludingtheloop processandbeginningtheprocessagain [31].Toprevent steameruptionandcalcitescalingwithinthepipes,monitoringthegeothermalfluidabovetheflashpressurepoint isnecessary [13].Thus,thelow-temperaturegeothermal

resourcesareenabledbythisbinary-typeenergyconversion setupandbyrelyinguponspecializedhighlightstoattain amazinglyhighplantperformances [32].

Fig.1.8 presentsthepressure-enthalpyofabinarygeothermalpowerplant.Atstate1,theworkingfluidatthesaturatedvaporpointaccessestheturbineandfacilitatedthe expansionandproductionofwork,andthismarksthe beginningofthethermodynamicprocess.Basedonthe workproduced,electricalenergyisgeneratedbythegenerator.Atstate2,aftertheexpansionprocessoftheturbine, thetemperatureandpressureofthesaturatedvaporreduce. Atstate3,atemperaturereductionoccursastheworking steam-fluidentersthecondenser,andthiseventuallyculminatesintofluidcondensation.Theapplicationofcooled waterfromtheair-cooledtowerinitiatesthecoolingprocess oftheworkingfluidbetweenstates3and4.Thetransformationoftheworkingfluidstateintoasaturatedliquidis achievedbythiscoolingphase.Atstates5and6,the workingsaturatedliquid-fluidispumpedbacktothepreheaterandevaporator,respectively.Atstate1,the

emergenceoftheworkingfluidassaturatedvaporinitiates theprocessrepeatedly [14,15]

Regardingthecondenser,theturbine,andthefeed pump,theflashanddry-steamplantssharesimilar

FIG.1.7 Basicbinarygeothermalpowerplant [17,18].
FIG.1.8 Pressure-enthalpydiagramofabinarygeothermalpowerplant [15]

Another random document with no related content on Scribd:

LOVE IN LIVERY

THE MAN ON THE BOX

Author of The Puppet Crown and The Grey Cloak

This is the brightest, most sparkling book of the season, crisp as a new greenback, telling a most absorbing story in the most delightful way. There never was a book which held the reader more fascinated.

AlbanyTimes-Union

The best novel of the year.

SeattlePost-Intelligencer

Satire that stops short of caricature, humor that never descends to burlesque, sentiment that is too wholesome and genuine to verge upon sentimentality, these are reasons enough for liking The Man on the Box, quite aside from the fact that it is a refreshing novelty in fiction.

NewYorkGlobe

Illustrated by Harrison Fisher 12mo, cloth, price, $1.50

The Bobbs-Merrill Company, Indianapolis

HEARTS, GOLD AND SPECULATION

BLACK FRIDAY

There is much energy, much spirit, in this romance of the gold corner. Distinctly an opulent and animated tale.

NewYorkSun

Black Friday fascinates by its compelling force and grips by its human intensity. No better or more absorbing novel has been published in a decade.

NewarkAdvertiser

The love story is handled with infinite skill. The pictures of “the street” and its thrilling, pulsating life are given with rare power.

BostonHerald

Illustrated by Harrison Fisher 12mo, cloth, price, $1.50

WANTED: A COOK

BY ALAN DALE

An uproariously funny comedy-novel of a self-conscious couple in contact with the servant question. Their ludicrous predicaments with their cooks are described with a light, farcial quality and a satire that never fail to entertain.

“A good story well told. In every sentence a hearty laugh and many an irrepressible chuckle of mirth.”

NewYorkAmerican

Bound in decorated cloth, 12mo, $1.50

FULL OF DAINTY CHARM

THE GIRL AND THE KAISER

BY PAULINE BRADFORD MACKIE

“An amusing love story, which is certain to win instant favor. Fresh, enthusiastic, and daintily lyrical.”

PhiladelphiaItem

“A charming little book, artistically made, is ‘The Girl and the Kaiser’; one that can be recommended for pleasing entertainment without reserve.”

St.LouisGlobe-Democrat

Here is a beautiful and delightfully seasonable volume that everybody will want. The story is a bubbling romance of the German imperial court with an American girl heroine.

Decorated and illustrated in color by John Cecil Clay 12mo, cloth, $1.50

The Bobbs-Merrill Company, Indianapolis

A STORY OF THE SIMPLE LIFE THE HAPPY AVERAGE

Author of The 13th District and Her Infinite Variety

Mr. Whitlock has done more than simply repeat his earlier success. He has achieved a new one. In The Happy Average he has voiced a deep-seated human sympathy for the unheroic.

Life

A most delightful romance that is as fresh as the flowers of May.

PittsburgLeader

As an example of a good, healthy, entertaining and human story, The Happy Average must be given a place in the front rank.

NashvilleAmerican

Not only the best book that has come from Mr. Whitlock’s pen, but a really noteworthy achievement in fiction.

ChicagoTribune

12mo, cloth, price, $1.50

The Bobbs-Merrill Company, Indianapolis

THE LIFE AND LOVES OF LORD BYRON

THE CASTAWAY

“Three great men ruined in one year a king, a cad and a castaway.”—Byron.

BY HALLIE ERMINIE RIVES

Author of Hearts Courageous

Lord Byron’s personal beauty, his brilliancy, his genius, his possession of a title, his love affairs, his death in a noble cause, all make him the most magnetic figure in English literature. In Miss Rives’s novel the incidents of his career stand out in absorbing power and enthralling force.

The most profoundly sympathetic, vivid and true portrait of Byron ever drawn.

Calvin Dill Wilson, author of Byron—ManandPoet

Dramatic scenes, thrilling incidents, strenuous events follow one another; pathos, revenge and passion; a strong love; and through all these, under all these, is the poet, the man, George Gordon.

GrandRapidsHerald

With eight illustrations in color by Howard Chandler Christy 12mo, cloth, price, $1.00 everywhere

The Bobbs-Merrill Company, Indianapolis

A ROMANCE OF LOVE AND POLITICS

THE PLUM TREE

A New Novel

Author of “The Cost,” “Golden Fleece,” Etc.

In this new novel the author of “The Cost” sounds a trumpet call to American patriotism and integrity.

First and last “The Plum Tree” is a love story of the highest order—interesting, ennobling, purifying.

Senator Depew says: “Well written and dramatic, as might be expected from the pen of Phillips.”

Senator Frye says: “A wonderful story of American political life.”

Senator Beveridge says: “Plot, action, color, vitality, make ‘The Plum Tree’ thrilling.”

Drawings by E. M. Ashe Bound in Cloth, 12mo, $1.50

The Bobbs-Merrill Company, Indianapolis

“AN ADMIRABLE TALE.”

THE MILLIONAIRE BABY

Author of “The Filigree Ball”

“This stirring, this absorbing, this admirable tale.”

NewYorkSun

“A thrillingly sensational piece of fiction—‘The Millionaire Baby.’”

St.PaulPioneerPress

“Certain to keep you up to the wee sma’ hours.”

ChicagoJournal

“Handled with consummate dexterity, adroitness and fertility of invention.”

BrooklynTimes

“A detective story that is a detective story.” Judge

“One reads from page to page with breathless interest.”

NewYorkTimes

“The reader is kept in a state of tiptoe expectation from chapter to chapter.”

BostonHerald

“Anna Katharine Green shows, in ‘The Millionaire Baby,’ a fertility of brain simply marvelous.”

PhiladelphiaItem

Beautifully Illustrated by A. I. Keller 12mo, $1.50

The Bobbs-Merrill Company, Indianapolis

TRANSCRIBER’S NOTES:

Obvious typographical errors have been corrected. Inconsistencies in hyphenation have been standardized.

Archaic or variant spelling has been retained.

*** END OF THE PROJECT GUTENBERG EBOOK THE PIONEER ***

Updated editions will replace the previous one—the old editions will be renamed.

Creating the works from print editions not protected by U.S. copyright law means that no one owns a United States copyright in these works, so the Foundation (and you!) can copy and distribute it in the United States without permission and without paying copyright royalties. Special rules, set forth in the General Terms of Use part of this license, apply to copying and distributing Project Gutenberg™ electronic works to protect the PROJECT GUTENBERG™ concept and trademark. Project Gutenberg is a registered trademark, and may not be used if you charge for an eBook, except by following the terms of the trademark license, including paying royalties for use of the Project Gutenberg trademark. If you do not charge anything for copies of this eBook, complying with the trademark license is very easy. You may use this eBook for nearly any purpose such as creation of derivative works, reports, performances and research. Project Gutenberg eBooks may be modified and printed and given away—you may do practically ANYTHING in the United States with eBooks not protected by U.S. copyright law. Redistribution is subject to the trademark license, especially commercial redistribution.

START: FULL LICENSE

THE FULL PROJECT GUTENBERG LICENSE

PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg™ mission of promoting the free distribution of electronic works, by using or distributing this work (or any other work associated in any way with the phrase “Project Gutenberg”), you agree to comply with all the terms of the Full Project Gutenberg™ License available with this file or online at www.gutenberg.org/license.

Section 1. General Terms of Use and Redistributing Project Gutenberg™ electronic works

1.A. By reading or using any part of this Project Gutenberg™ electronic work, you indicate that you have read, understand, agree to and accept all the terms of this license and intellectual property (trademark/copyright) agreement. If you do not agree to abide by all the terms of this agreement, you must cease using and return or destroy all copies of Project Gutenberg™ electronic works in your possession. If you paid a fee for obtaining a copy of or access to a Project Gutenberg™ electronic work and you do not agree to be bound by the terms of this agreement, you may obtain a refund from the person or entity to whom you paid the fee as set forth in paragraph 1.E.8.

1.B. “Project Gutenberg” is a registered trademark. It may only be used on or associated in any way with an electronic work by people who agree to be bound by the terms of this agreement. There are a few things that you can do with most Project Gutenberg™ electronic works even without complying with the full terms of this agreement. See paragraph 1.C below. There are a lot of things you can do with Project Gutenberg™ electronic works if you follow the terms of this agreement and help preserve free future access to Project Gutenberg™ electronic works. See paragraph 1.E below.

1.C. The Project Gutenberg Literary Archive Foundation (“the Foundation” or PGLAF), owns a compilation copyright in the collection of Project Gutenberg™ electronic works. Nearly all the individual works in the collection are in the public domain in the United States. If an individual work is unprotected by copyright law in the United States and you are located in the United States, we do not claim a right to prevent you from copying, distributing, performing, displaying or creating derivative works based on the work as long as all references to Project Gutenberg are removed. Of course, we hope that you will support the Project Gutenberg™ mission of promoting free access to electronic works by freely sharing Project Gutenberg™ works in compliance with the terms of this agreement for keeping the Project Gutenberg™ name associated with the work. You can easily comply with the terms of this agreement by keeping this work in the same format with its attached full Project Gutenberg™ License when you share it without charge with others.

1.D. The copyright laws of the place where you are located also govern what you can do with this work. Copyright laws in most countries are in a constant state of change. If you are outside the United States, check the laws of your country in addition to the terms of this agreement before downloading, copying, displaying, performing, distributing or creating derivative works based on this work or any other Project Gutenberg™ work. The Foundation makes no representations concerning the copyright status of any work in any country other than the United States.

1.E. Unless you have removed all references to Project Gutenberg:

1.E.1. The following sentence, with active links to, or other immediate access to, the full Project Gutenberg™ License must appear prominently whenever any copy of a Project Gutenberg™ work (any work on which the phrase “Project

Gutenberg” appears, or with which the phrase “Project Gutenberg” is associated) is accessed, displayed, performed, viewed, copied or distributed:

This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook.

1.E.2. If an individual Project Gutenberg™ electronic work is derived from texts not protected by U.S. copyright law (does not contain a notice indicating that it is posted with permission of the copyright holder), the work can be copied and distributed to anyone in the United States without paying any fees or charges. If you are redistributing or providing access to a work with the phrase “Project Gutenberg” associated with or appearing on the work, you must comply either with the requirements of paragraphs 1.E.1 through 1.E.7 or obtain permission for the use of the work and the Project Gutenberg™ trademark as set forth in paragraphs 1.E.8 or 1.E.9.

1.E.3. If an individual Project Gutenberg™ electronic work is posted with the permission of the copyright holder, your use and distribution must comply with both paragraphs 1.E.1 through 1.E.7 and any additional terms imposed by the copyright holder. Additional terms will be linked to the Project Gutenberg™ License for all works posted with the permission of the copyright holder found at the beginning of this work.

1.E.4. Do not unlink or detach or remove the full Project Gutenberg™ License terms from this work, or any files

containing a part of this work or any other work associated with Project Gutenberg™.

1.E.5. Do not copy, display, perform, distribute or redistribute this electronic work, or any part of this electronic work, without prominently displaying the sentence set forth in paragraph 1.E.1 with active links or immediate access to the full terms of the Project Gutenberg™ License.

1.E.6. You may convert to and distribute this work in any binary, compressed, marked up, nonproprietary or proprietary form, including any word processing or hypertext form. However, if you provide access to or distribute copies of a Project Gutenberg™ work in a format other than “Plain Vanilla ASCII” or other format used in the official version posted on the official Project Gutenberg™ website (www.gutenberg.org), you must, at no additional cost, fee or expense to the user, provide a copy, a means of exporting a copy, or a means of obtaining a copy upon request, of the work in its original “Plain Vanilla ASCII” or other form. Any alternate format must include the full Project Gutenberg™ License as specified in paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying, performing, copying or distributing any Project Gutenberg™ works unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing access to or distributing Project Gutenberg™ electronic works provided that:

• You pay a royalty fee of 20% of the gross profits you derive from the use of Project Gutenberg™ works calculated using the method you already use to calculate your applicable taxes. The fee is owed to the owner of the Project Gutenberg™ trademark, but he has agreed to donate royalties under this paragraph to the Project Gutenberg Literary Archive Foundation. Royalty

payments must be paid within 60 days following each date on which you prepare (or are legally required to prepare) your periodic tax returns. Royalty payments should be clearly marked as such and sent to the Project Gutenberg Literary Archive Foundation at the address specified in Section 4, “Information about donations to the Project Gutenberg Literary Archive Foundation.”

• You provide a full refund of any money paid by a user who notifies you in writing (or by e-mail) within 30 days of receipt that s/he does not agree to the terms of the full Project Gutenberg™ License. You must require such a user to return or destroy all copies of the works possessed in a physical medium and discontinue all use of and all access to other copies of Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of any money paid for a work or a replacement copy, if a defect in the electronic work is discovered and reported to you within 90 days of receipt of the work.

• You comply with all other terms of this agreement for free distribution of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™ electronic work or group of works on different terms than are set forth in this agreement, you must obtain permission in writing from the Project Gutenberg Literary Archive Foundation, the manager of the Project Gutenberg™ trademark. Contact the Foundation as set forth in Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend considerable effort to identify, do copyright research on, transcribe and proofread works not protected by U.S. copyright

law in creating the Project Gutenberg™ collection. Despite these efforts, Project Gutenberg™ electronic works, and the medium on which they may be stored, may contain “Defects,” such as, but not limited to, incomplete, inaccurate or corrupt data, transcription errors, a copyright or other intellectual property infringement, a defective or damaged disk or other medium, a computer virus, or computer codes that damage or cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the “Right of Replacement or Refund” described in paragraph 1.F.3, the Project Gutenberg Literary Archive Foundation, the owner of the Project Gutenberg™ trademark, and any other party distributing a Project Gutenberg™ electronic work under this agreement, disclaim all liability to you for damages, costs and expenses, including legal fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE FOUNDATION, THE TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a defect in this electronic work within 90 days of receiving it, you can receive a refund of the money (if any) you paid for it by sending a written explanation to the person you received the work from. If you received the work on a physical medium, you must return the medium with your written explanation. The person or entity that provided you with the defective work may elect to provide a replacement copy in lieu of a refund. If you received the work electronically, the person or entity providing it to you may choose to give you a second opportunity to receive the work electronically in lieu of a refund.

If the second copy is also defective, you may demand a refund in writing without further opportunities to fix the problem.

1.F.4. Except for the limited right of replacement or refund set forth in paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied warranties or the exclusion or limitation of certain types of damages. If any disclaimer or limitation set forth in this agreement violates the law of the state applicable to this agreement, the agreement shall be interpreted to make the maximum disclaimer or limitation permitted by the applicable state law. The invalidity or unenforceability of any provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the trademark owner, any agent or employee of the Foundation, anyone providing copies of Project Gutenberg™ electronic works in accordance with this agreement, and any volunteers associated with the production, promotion and distribution of Project Gutenberg™ electronic works, harmless from all liability, costs and expenses, including legal fees, that arise directly or indirectly from any of the following which you do or cause to occur: (a) distribution of this or any Project Gutenberg™ work, (b) alteration, modification, or additions or deletions to any Project Gutenberg™ work, and (c) any Defect you cause.

Section 2. Information about the Mission of

Project Gutenberg™ is synonymous with the free distribution of electronic works in formats readable by the widest variety of computers including obsolete, old, middle-aged and new computers. It exists because of the efforts of hundreds of volunteers and donations from people in all walks of life.

Volunteers and financial support to provide volunteers with the assistance they need are critical to reaching Project Gutenberg™’s goals and ensuring that the Project Gutenberg™ collection will remain freely available for generations to come. In 2001, the Project Gutenberg Literary Archive Foundation was created to provide a secure and permanent future for Project Gutenberg™ and future generations. To learn more about the Project Gutenberg Literary Archive Foundation and how your efforts and donations can help, see Sections 3 and 4 and the Foundation information page at www.gutenberg.org.

Section 3. Information about the Project

Gutenberg Literary Archive

Foundation

The Project Gutenberg Literary Archive Foundation is a nonprofit 501(c)(3) educational corporation organized under the laws of the state of Mississippi and granted tax exempt status by the Internal Revenue Service. The Foundation’s EIN or federal tax identification number is 64-6221541. Contributions to the Project Gutenberg Literary Archive Foundation are tax deductible to the full extent permitted by U.S. federal laws and your state’s laws.

The Foundation’s business office is located at 809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887. Email contact links and up to date contact information can be found at the Foundation’s website and official page at www.gutenberg.org/contact

Section 4. Information about Donations to the Project Gutenberg Literary Archive Foundation

Project Gutenberg™ depends upon and cannot survive without widespread public support and donations to carry out its mission of increasing the number of public domain and licensed works that can be freely distributed in machine-readable form accessible by the widest array of equipment including outdated equipment. Many small donations ($1 to $5,000) are particularly important to maintaining tax exempt status with the IRS.

The Foundation is committed to complying with the laws regulating charities and charitable donations in all 50 states of the United States. Compliance requirements are not uniform and it takes a considerable effort, much paperwork and many fees to meet and keep up with these requirements. We do not solicit donations in locations where we have not received written confirmation of compliance. To SEND DONATIONS or determine the status of compliance for any particular state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where we have not met the solicitation requirements, we know of no prohibition against accepting unsolicited donations from donors in such states who approach us with offers to donate.

International donations are gratefully accepted, but we cannot make any statements concerning tax treatment of donations received from outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation methods and addresses. Donations are accepted in a number of other ways including checks, online payments and

credit card donations. To donate, please visit: www.gutenberg.org/donate.

Section 5. General Information About Project Gutenberg™ electronic works

Professor Michael S. Hart was the originator of the Project Gutenberg™ concept of a library of electronic works that could be freely shared with anyone. For forty years, he produced and distributed Project Gutenberg™ eBooks with only a loose network of volunteer support.

Project Gutenberg™ eBooks are often created from several printed editions, all of which are confirmed as not protected by copyright in the U.S. unless a copyright notice is included. Thus, we do not necessarily keep eBooks in compliance with any particular paper edition.

Most people start at our website which has the main PG search facility: www.gutenberg.org.

This website includes information about Project Gutenberg™, including how to make donations to the Project Gutenberg Literary Archive Foundation, how to help produce our new eBooks, and how to subscribe to our email newsletter to hear about new eBooks.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.