Transit Routes – City Wide
City of Eau Claire
CORRE Inc. - Project Manager June 2024 Kevin Meyer, PE
Public Information Meeting
City of Eau Claire
CORRE Inc. - Project Manager June 2024 Kevin Meyer, PE
Public Information Meeting
• Project Location
• Purpose and Need
• Proposed Improvements
• Proposed Design Overview
• Traffic Control
• Upcoming Schedule
• Project Contacts
• Public Comment
• In and around the City of Eau Claire metro area
• Improvement to Existing Transit Stops
• Locations of stops to be improved are shown on map
• Purpose of the project
▪Improve accessibility of the transportation system for the public
• Need for the project
▪Add additional pavement connecting sidewalk to the street curb and gutter at transit stops
▪Updates will meet Public Right-of-Way
Accessibility Guidelines (PROWAG)
Unimproved existing transit stop
▪Construct concrete boarding and alighting areas at existing transit stops and connect to existing pedestrian circulation paths with compliant slopes and clearances
• Example Transit stop improvement
• Added sidewalk between existing sidewalk and street curb and gutter for accessibility.
• Vehicle and pedestrian traffic will be routed around bus stop locations during construction:
▪Access will be maintained to adjacent properties during construction
▪Traffic control will be set up for approximately a week at each station location
Preliminary design began: Spring 2024
Preliminary design and environmental process complete: Summer 2024
Final plan submittal: November 2024
Construction: Currently scheduled for Summer 2025