SITING AND ORIENTATION: Living areas to the North to maximize passive solar heat gain PV panels and evacuator tubes to be north facing to maximize solar intake

S

Ensure Rainwater tank is not located to the north to prevent bacteria WINTER SUN PATH

roof pitched to maximize northern sun exposure for passive solar gain in roofing but also to facilitate solar hot water and PV generation

SUMMER SUN PATH

HORIZONTAL SHADING TO THE NORTH EXTENDING PAST WINDOW EDGES

EXISTING SINGLE STOREY RESIDENCE

SURROUNDING CONTEXT: Achieve minimum 6000 spacing from single storey dwellings and

EXISTING DOUBLE STOREY RESIDENCE

11000 from double storey dwellings to prevent overshadowing centralize dwelling on block to minimize trenching needs

MIN 11000 FROM EXISTIN DOUBLE STOREY RESIDENCE

MIN 6000 FROM EXISTING SINGLE STOREY RESDENCE

VEGETATION: Proposed landscaping to funnel cooling southern breezes in summer towards the building Ensure plant selection is grey water tolerant

COLOURBOND KLIPLOK ROOFING

8° FALL

USE OF LAND

HWS

FILTER

SOLAR HOT WATER EVACUATOR TUBES

10,000L RAINWATER COLLECTION TANK

Large block was narrowed through the planting of grey water tolerant vegetation to better facilitate passive cooling via cross ventilation from cool south westerly summer breezes

RAINWATER TANK WP

BOSCH MONOCRYSTALLINE PV PANELS

GREY WATER TOLERANT VEGETATION PLANTED TO FUNNEL AND TAKE ADVANTAGE OF COOL SUMMER BREEZES FOR PASSIVE COOLING

EXISTING DOUBLE STOREY RESIDENCE GAS MAINS CONNECTED TO METER. NO GAS USED IN RESIDENCE THEREFORE NO CONNECTION TO THE BUILDING

OVERHEAD POWER CONNECTION

INTERIOR ZONING: 1. LIVING 2. BEDROOM 3. ENSUITE 4. BEDROOM 5. BEDROOM 6. UTILITY/ BATHROOM

01.

GM

M

02. 06. 03.

E

E

E

E

E

E

E

E

E

E

05.

E

04.

LPD W

W

W

W

GAS

GAS

GAS

GAS

W GAS

W

W

W

W

W

W

GAS

GAS

GAS

GAS

GAS

GAS

CLIENT

LEGEND: GAS MAINS WATER MAINS

GAS W

SEWER PIT

S

LEGAL POINT OF DISCHARGE

GAS METER

GM

SITE BOUNDARY

ELECTRICAL CONNECTION

WATER METER

M

GAS CONNECTION

SUN PATH

LPD

PROJECT

STORMWATER OUTLET

ASSIGNMENT 01 DRAWING TITLE

0

SEWER MAINS

S

TELECOM PIT

WATER CONNECTION

ELECTRICAL LINE

E

HV ELECTRIC LINE POLE

TELECOM CONNECTION

NORTH

.5

2.5

DO NOT SCALE DRAWINGS FOR CRITICAL DIMENSIONS. CHECK DRAWING IS TO SCALE BY MEASURING SCALE BAR BELOW. VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK, SHOP DRAWINGS OR ORDERING MATERIALS.

5

SITE PLAN

DRAWN

STUDENT No.

DEV GOLDING

588 142

SCALE

1:200 @ A3

DATE

24-08-16

DRAWING No.

REVISION

A3.1

A