The Singapore Engineer January 2017

Page 23

COVER STORY

Blk 75 in JTC LaunchPad @ one-north (artist’s impression).

Blk 77 in JTC LaunchPad @ one-north (artist’s impression).

Prefabricated structural steel JTC is using structural steel to build Blk 75 and Blk 77 in the second phase of JTC LaunchPad @ one-north. Structural steel is prefabricated in a controlled environment off-site, before transportation to the project site. The off-site fabrication ensures greater quality control, enhances workers’ safety and improves construction productivity. Moving beyond the use of structural steel for low floor loading spaces, JTC is piloting the use of structural steel for light-industrial buildings with higher floor loading and longer column-free span, such as JTC CleanTech Three @ Jurong Innovation District. It is estimated that with the use

CleanTech Three @ Jurong Innovation District (artist’s impression).

of structural steel, there will be overall project productivity gains of 10% to 15%, as compared to the use of conventional reinforced con-

crete. On-site construction work is also significantly reduced, leading to a neater, cleaner and safer construction environment.

January 2017 THE SINGAPORE ENGINEER

21


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
The Singapore Engineer January 2017 by The Singapore Engineer - Issuu