References
->
Period : April 2011 Place : Norway, Bergen. Costumer : BP. Project on : FPSO Name Skarv. Task : Mechanical Supervision, Precommissioning, commissioning and handover the HVAC system.
->
Period : April 2011 Place : Ghana. Costumer : Novenco. Project on : Drilling Rig Name : Eirik Raude Task : HVAC system survey.
->
Period : February - Marts 2011 Place : Singapore. Sembawang shipyard Costumer : Novenco. Project on : Ship name : Fulk Al Saamah Task : Electrical and mechanical assistance, Precommissioning, commissioning and handover the HVAC system.
->
Period : October - January 2010 Place : Norway. Arendal Costumer : Novenco and Master Marine Project on : Hotel Rig L205 Service Jack 1. Task : Electrical and mechanical assistance, Precommissioning, commissioning and handover the HVAC system.