Daniel Ellis Kendall Architecture Portfolio - A

Page 1

Daniel Ellis Kendall Portfolio Architecture Design

RIBA Stage 0-2 R IBA Stage 3 RIBA Stage 4 RIBA Stage 5-7 Contents Academic Practice RIBA Stage 0-2 RIBA Stage 3 RIBA Stage 4 3. Postgraduate L7 4. Undergraduate BArch 06 24 48 70 60 76
2. Smith Young Architects
A B
1. Rayner Davies Architects
R IBA Stage 3 RIBA Stage 4 RIBA Stage 5-7 RIBA Stage 0-2
2019-2023
1. Rayner Davies Architects Selected Project Work
05
YMCA Innovation Centre

177a Melton Road Residential Scheme

This small bespoke house project was in it’s initial design stages when I joined the project prior to further client consultation. I was tasked with taking a series of briefing sketches completed by a colleague and producing a series of photo-realistic renders. These were completed using a combination of SketchUp and Lumion.

Project Information

SKETCH SHOWING POTENTIAL CHANGES

01 New full-width/full-height glazed structure forming main entrance. Follows existing pitch at roof level and encloses landing gallery above. Space is opened up, creating a more impressive sense of scale and improving natural light.

02 Proposed view/route through the building into garden courtyard beyond, further extending the sense of space and providing a green backdrop to the entrance space. Flow through the entrance area and towards the kitchen/stair is greatly improved.

03 New kitchen with breakfast bar area. A more efficient use of space providing an open, dual-aspect.

04 Existing extension replaced with a larger, brighter extension that matches the aesthetic of the new entrance and opens up onto the garden.

05 Alcove for artwork, sculpture or indoor tree.

06 Cloaks.

07 New skylight above stair.

08 New eliptical staircase creating additional sense of grandure and providing an impressive focal feature.

09 Utility relocated. Cost of moving boiler acknowledged, would make a big difference but appreciate that costs are a consideration here.

10 Breakfast lounge alcove.

R IBA Stage 3
Stage 4
Stage 5-7
RIBA
RIBA
Size Involvement Programme 1,380m2 Project Assistant SketchUp / Lumion
RIBA Stage 0-2 2 PLAN can be altered by items below... 02 03 05 04 01 FOR ENHANCEMENT Demolition of external wall forming new entrance stair extension PROPOSED FLOOR PLAN Initial sketch ideas to be explored further and used to inform the project brief 05 06 07 08 09 10 04 02 03 01
PROPOSED SECTION Indicative section cut through the new space
07

26 Melton Road Residential Scheme

This renovation scheme provided a unique challenge as the client requested the maximisation of spatial efficiency alongside all bedrooms to be Part M accessible. I was involved in multiple client meetings for this project and lead the early stage project progression prior to a full Planning Submission.

Fire Strategy

GIA

IBA
RIBA Stage
RIBA Stage 5-7
R
Stage 3
4
Project Information
SVP 60l/s 15 * * * E S S S S H l/s 15 l/s SVP SP * * * S S S S S S SVP SP l/s * * S S S S A.O.V 1m2 free area Drawing to be read in conjunction with Building Control Notes RDA Ref 3034(04)BCN Drawing Key Alarm and Detection Indicative ONLY Final Design by specialist Compartmentation S H Smoke detector Heat detector Alarm call point Main Panel Fire Exit sign E 30 minute FR 60 minute FR FD60 S SC * Bed Bed Bed Bed Lounge Kitchen Utility A3 01 Ground Floor Plan - 05/08/22 MJV First Issue 0 1m 5m 10m 1:100 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 4. This drawing must be read in conjunction with all relevant engineer's and specialist designers’ drawings and specifications. 5. All demolition works subject statutory approval and assessment by structural engineer. 6. Works covered by pre-commencement conditions or works without consent must NOT be carried out without statutory approval. RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 3034(04)001 A 29/09/22 STATUS REVISIONS NOTES 26 Melton Road Care Home conversion Fire Strategy MJVPreliminary N 02 First Floor Plan 03 Second Floor Plan 04 Section A-A A 29/09/22 MJV Update following Fire Office AI comments
Involvement Programme 137m2 Project Assistant Autocad
RIBA
Stage 0-2
09 1200 1100L Commercial Wheelie Bin 4800 2400 +23,980 +23,600 New external ramp Store 1m2 Rm 1 15.5m2 (Including 2.8m2 En-suite) Kitchen 19.9m2 Store 1.8m2 Living Area 11.6m2 Rear Front Door Blocked to Cill Level and amended to Window New 1800mm Double Doors +23,980 1200 1100L Commercial Wheelie Bin 4800 2400 +23,980 +23,600 New external ramp Staff WC 1.6m2 Laundry 4.6m2 Rm 3 16.0m2 (Including 3.4m2 En-suite) Fire Escape Stairs to be removed Acoustic Insulation Added To Wall Build Up Rm 2 16.1m2 (Including 3.9m2 En-suite) New Partition Wall to Seperate Rooms Fitted Wardrobe Boiler 1200 1100L Commercial Wheelie Bin 4800 2400 +23,980 +23,600 New external ramp Rm 4 20.6m2 (Including 7.9m2 En-suite) Door Blocked Up Dormer Window Installed Store 0.7m2 600mm dia. Hot Water Storage Cylinder 2000mm Above FFL 1800mm above FFL 2000mm Above FFL 1800mm above FFL

3

Aspen Hill, Leeds Care Village Renovation

This project included extensive renovation both internally and externally to an existing two storey care village located in Leeds. I was tasked with creating sets of existing and proposed drawings and used AutoCad to generate these.

1,360m2

Involvement
ENT 01 ENT 05 ENT 02 ENT 03 ENT 04 ENT 06 ENT 07 Reception Lobby Office Laundry Accesible WC Store Store Elec. Maintenance Rm Kitchen Chiller Chiller Office Cup'd WC Plant (03)006 A-A 1800 Hair Salon Nail Parlour 2790.8 0.2 9600 Existing Covered Walk-way Kitchenette 2m2 WC Office 9m2 Capacity: 2 Spa 24m Kitchen Extension 2 41m2 Kitchen Extension 1 25m Office Area: 45m2 Capacity: 8 Workstations 900 900 New Double Doors 1785 s/o 1785 s/o Meeting Room Area 13.5m Capacity: 8 Meeting Room Area: 10.5m2 Capacity: Proposed Cinema 20m Capacity: 12 900 New glazed screen 2110 3015 5060 2665 3955 2325 2704.1 3980 1090 3060 4500 4930 5395 4500 6000 6945 7155.8 8831.4 1340 2910 3473.9 2765 Corridor Traveldistance15.5m Travel distance 14.4m Traveldistance12.9m Traveldistance16m Singledirectiontravel distance 8.9m Schedule of Areas Existing Building GIA (m GEA (m GF 504.5 537.4 FF 122.2 136.1 Total 626.7 673.5 Proposed Extensions GIA (m GEA (m Ground Floor: Kitchen ext. 1 25.1 29.7 Kitchen ext. 2 41.7 47.5 Spa Cinema 46.9 52.9 Offices 45.5 50 Meeting Room 15.5 15.5 First Floor: Office 39.1 46.2 Total 213.8 241.8 Refurbishment GIA (m Ground Floor: Corridor 6 Hair 12.2 Nails 13.1 Office 9.2 Accessible WC 6.4 WC 3.3 Meeting Room 10.7 Total 60.9 RaynerDaviesArchitects JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2930(08)003 A 23/12/21 STATUS REVISIONS NOTES Aspen Hill Leeds Care Home Extension Ground Floor Plan As Proposed DK MJV Preliminary A2 - 06/08/21 DK First Issue Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. A 23/12/21 MJV
R IBA Stage
RIBA Stage 4 RIBA Stage 5-7 Project Information Site Area
Programme Proposed GF Plan
Project Assistant Autocad
RIBA Stage 0-2
011 Bin Bin Water GATE Shed Plant CPS CPS Bin Store Grass Garage Conc Grass Grass Grass Grass Grass Grass Grass CPS CPS CPS CPS CPS CPS Grass Grass Planting Planting Planting Planting Grass Grass Grass Grass Conc Conc Grass Planter CPS CPS Grass Grass Bushes Grass Vent Gravel Gravel Gravel Gravel Gravel Gravel Gravel Gravel Gravel Gravel Planting Planting Planting CPS CPS Green House Butt Water Butt Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Bush Vent ENT 01 ENT 06 ENT 05 ENT 02 ENT 03 ENT 04 Covered Walk-way Ambulance Parking Removed N

Cow Lane, Cambridge Residential Extension

I was tasked with producing a set of Planning Drawings for a residential extension scheme located in Cambridge. The initial planning application was recommended for refusal which resulted in a scheme redesign. The challenge within this re-application was to show the minimised impact of the extension from the street level.

Location Plan Elevations

Involvement Programme

801m2

Existing Garage +15,029 FF FFL +12,422 GF FFL Front Landscaping +14,725 GF CH +17,130 Existing Eaves To Match Existing +18,831 Ridge To Match Existing +19,026 Existing Ridge To Match Existing +14,661 Proposed Eaves Close Boarded Timber Fence, Height 1800mm Existing Picket Fence Height 950mm Proposed Bay Window 4145 Existing Gable 3995 Proposed Gable Existing Proposed +18,606 Gable Ridge Lower than main ridge by 225mm Adjacent Property +15,029 FF FFL +12,422 GF FFL Adjacent Property Site Close Boarded Timber Fence, Height 1800mm +17,130 Existing Eaves To Match Existing +19,026 Existing Ridge To Match Existing +14,661 Proposed Eaves Gable Extended to South Proposed Bay Window Existing Proposed Existing Proposed +18,831 Existing Ridge To Match Existing 2100 Adjacent Property CB Fence Height 900mm Existing Garage +15,029 FF FFL +12,422 GF FFL Existing Proposed Existing Garage CB Fence Height 900mm CB Fence Height 1800mm +12,422 GF FFL Existing Proposed Legal Info ©RDA Consultant Architects. are given millimeters survey information by boundaries to confirmed This drawing intended not assume any liability RaynerDavies St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham JOB TITLE DATE 2805(08)112 25/02/22 REVISIONS 13 Cow Lane Cambridge Elevations Proposed 01 Proposed West Gable Elevation - 12/11/21 First Issue 1m 5m 10m 1:100 03 Proposed East Gable Elevation 04 Proposed Rear Elevation 02 Proposed Front Elevation 15/11/21 22/02/22 General Updates Following RIBA Stage
RIBA Stage
4
5-7 Project Information Site Area
Sketch
Project Assistant Autocad /
RIBA Stage 3 RIBA Stage 0-2 STANSFIELD GARDENS 2 Ingleton 25 7 15 19 17 14 8a 10 551725 551725 551750 551750 551775 551775 551800 551800 551825 551825 256450 256450 256475 256475 256500 256500 256525 256525 256550 256550 metres 0 10 20 551721 256449 551721 256570 551848 256570 551848 256449 TL5156 TL5156 TL5156 TL5156 MapServe © Crown copyright 2021 Ordnance Survey 100053143
013

Greylees, Sleaford Masterplan

I was involved in this Master-planning project from it’s conception and primarily worked on initial concept drawings to communicate the desired direction of the scheme to the client and local authority. The scheme aims to retain much of the existing hospital buildings alongside proposing new houses and apartments.

36,198m2 (8.94 Acres)

Project Assistant

Hand Drawing

14 22 30 50 20 49 14 53 51 71 59 12 20 51 to 61 Greylees Orchard 3 Path Chapel Post Stmp Stmp Stmp Stmp Stmp Stmp Stmp G2.1 TCL: G1.5 G1.2 G1.5 *B/B (21)S01 (21)S01 A * B B B1 B1 B B B1 B1 B1 B1 B1 B1 B B B1 B1 B B B1 B1 B B1 B/ * B1B1 B B * B1 B1 * D D D D B B B1 B1 D1 B B1 D1 D1 D1 D1 D1 C1 C1 C C1 C1 C1 C1 C C C1 C1 C C*C1/C1 C/C *C1/C1 A A1 A1 A A1 A A1 A1 A1* A A1* A A1* A1 A1* A A A1 A1* B B 21836 12287 22411 21949 5034.7 10874 6000 V V HINE AVENUE GOLDRING CRESCENT Block Bin/ Cycle Store Substation Man. Company V V U33 U34 U35 U36 100.0 sq.m. Garden 64 114.6 sq.m. U37 U38 U39 U40 U41 U43 U44 U45 U48 U50 U51 U52 U53 U62 U61 U60 U59 U58 U57 U56 U55 U63 U64 U65 U66 U68 U71 U72 U73 U74 U75 U76 U54 U47 U42 U46 U49 U67 U70 U69 U09 U10 U11 U12 U14 U15 U17 U18 U19 U20 U21 U22 U23 U24 U25 U27 U26 U28 U29 U30 U31 U32 BLOCK D BLOCK M U16 U07 U08 U05 U06 U03 U04 U01 U02 WAU.01 WAU.02 WAU.03 WAU.04 WAU.05 WAU.06 WAU.07 WAU.08 BLOCK G Conservatory BLOCK L BLOCK C Communal Garden Communal Garden Communal Garden Existing path retained Trees indicative location BLOCK E 22919 21037 17560 11001 21333 16437 20757 20694 8270 7663 20945 13778 23018 19390 5000 5000 5000 6000 6000 6000 5500 5500 BLOCK B SCHEDULE OF ACCOMMODATION Units Detached Dwellings Semi-Detached Dwellings Terraced Dwellings Wheelchair Accessible Apartments Total Unit Types New- Build Dwellings Conversion/ Extension Conversion/ Extension Total Block G Apartments 1Bed 2Person 2Bed 3Person 2Bed 4Person Total Wheelchair Accessible 3Bed 5Person Total Block Apartments 1Bed 2Person 2Bed 3Person 2Bed 4Person Total Block C Dwellings 3Bed 5Person 4Bed 6Person Total Block Apartments 2Bed 4Person Total Block M Apartments 2Bed 4Person Total Block D Dwellings 3Bed 5Person 4Bed 6Person Total Block Apartments 1Bed 2Person 2Bed 4Person Total Existing Units and Wheelchair 1Bed 2Person 2Bed 3Person 2Bed 4Person 3Bed 5Person 4Bed 6Person Total House Types Type Type Type Type Total Parking Allowance - 2no. car parking spaces - 3no. car parking spaces - 1no. car parking spaces per 4no. flats - 1no. cycle space per converted dwelling Total Total 50% EV allowance been included for visitor 01 Proposed Masterplan 5m 20m 1:500 02 Schedule of
RIBA Stage 4 RIBA Stage 5-7 Project Information Site Area Involvement Programme
RIBA Stage 3 RIBA Stage
14 2 30 50 20 31 KINROSS ROAD 33 49 14 53 29 51 77 Greylees 47 71 16 73 59 45 27 31 31 23 12 20 51 AncasterMews 22 to61 87 79 to MONTROSE GROVE Greylees Orchard 12 15 19 MURRAYFIELDAVENUE 17 11 10 TURNBERRY CLOSE Track 1 37 60 Path 64to58 46 Chapel 504000 504000 504100 504100 504200 504200 504300 504300 343900 343900 344000 344000 344100 344100 344200 344200 metres 0 100 200 503901 343858 503901 344204 504340 344204 504340 343858 TF0344 TF0444 TF0443 TF0343 MapServe © Crown copyright 2022 Ordnance Survey 100053143 N Legal Info ©RDA Consultant Architects. Drawing not construction. dimensions given millimeters unless otherwise stated. survey information others. Check dimensions site. Site boundaries confirmed by client solicitors with reference title deeds. This drawing intended use the commissioning client only. RDA do RaynerDaviesArchitects Nottingham Nottingham Kent JOB TITLE DATE BY CHECKED BY 3022(02)001 B 18/04/23 Greylees Housing, Sleaford Location Plan CA As Existing A2 00 Location Plan - 26/10/22 CA First Issue 10m 50m 100m 1:1250 Application Boundary Exact site boundary TBC by client's solicitor in reference to title deeds. A 01/12/22 CA Boundary line type revised 18/04/23 CA Boundary revised
0-2
Location Plan Site Plan
Chapel TURNBERRY CLOSE
Woodland
Open Space Woodland
Woodland Woodland D8 C5 C4 C3 C2 C1 C8 L2 L1 M1 M2 E1 E2 AVENUE D1 D2 D3 D4 D5 D6 D7 C6 C7 2.15 2.14 2.13 1.6 1.10 1.9 G1 2.9 1.5 B1 2.10 2.11 2.12 1.11 MEWS GOLDRING CRESCENT GOLDRING CRESCENT 2.6 2.7 2.8 3.1 1.1 1.3 3.2 1.4 1.7 1.8 2.17 2.16 2.18 2.19 2.20 2.21 2.2 2.3 2.4 2.5 2.1 1.2 Conservatory B2 G T54 T68 T69 T52 Event Space Public Open Space Public Open Space Public Open Space Mirrored Zone Indicative Greenhouse Frame CENTRAL AXIS T51 015
HINEAVENUE HINE AVENUE
Formal Airing Court Public
Woodland

RIBA Stage 5-7

RIBA Stage 4

RIBA Stage 3

RIBA Stage 0-2

1. Proposed Elevations

My involvement in this project also required me to perform Part O Building regulation checks for Solar Gains and Ventilation

+41,352 Ridge +40,400 Ridge 04 01 01 03 02 02 08 12 13 Conversion Proposed +30,480 GF FFL +34,500 1F FFL +42,369 Ridge Privacy glass 04 09 Concealed gutter Sill lowered Levels raised locally for level access 11 01 New opening Downpipe relocated New opening +41,352 Ridge 04 08 11 +40,400 Ridge Conversion Proposed +30,480 GF FFL +34,500 1F FFL 01 01 03 02 +42,369 Ridge 04 16 09 +41,352 Ridge +30,480 GF FFL +34,500 1F FFL Conversion Proposed 11 01 01 03 02 08 09 +42,369 Ridge 10 16 Privacy glass 04 16 12 09 Privacy glass Levels raised locally to achieve level threshold 12 14 14 13 12 09 10 +40,338 Ridge +41,352 Ridge Levels raised locally to achieve level threshold Levels raised locally to achieve level threshold Sill lowered +30,480 GF FFL +34,500 1F FFL AOV Conversion Proposed 11 01 01 03 02 08 +42,369 Ridge 15 16 Privacy glass 10 17 16 16 Step in brick facade Canopy Bin/ cycle store in foreground Sill raised 13 12 14 12 14 15 True elevation Hipped roof to bay window, refer to whole building elevation 02 12 SV RWP 1A 1B 1C 1D 1E True elevation Hipped roof to bay window, refer to whole building elevation 02 12 RWP 2A 2B 2C 2D 2E True elevation Hipped roof to bay window, refer to whole building elevation 02 12 3ARWP 3B 3C 3D 3E 02 03 04 Bay 3 NOTES Please read reports All topographical others. All layouts Engineer Demolition Heritage recommendations removal Demolition previously shown. shown. items such banding cover for building. Acoustic Acoustician. Proposed M&E Engineer. Final location detail stage Reclaimed conversions. reconstituted demolition reconstituted PROPOSED 1. Existing 2. Existing 3. Existing 4. Existing 5. Not 6. Not 7. Not 8. Brick 9. Standing 10. New Colour 11. Aluminium 12. Aluminium 13. Aluminium Anthracite 14. Composite 15. Spandrel Colour 16. Canopy 17. Not 18. uPVC JOB TITLE DWG TITLE DATE DWG NO. 3022(21)B01 18/05/23 REVISIONS NOTES Greyless Proposed Legal 1. ©RDA are given 2. All survey boundaries 3. This drawing not assume 01 Proposed Elevation 01 02 Proposed Elevation 02 03 Proposed Elevation 03 04 Proposed Elevation 04First Issue A General B Planning

3. Proposed Elevations

This drawing was completed as a render to form part of the stage 3 planning pack.

2. SketchUp Model

This drawing was completed as a render to form part of the stage 3 planning pack.

017
Conversion Conversion Proposed Infill +30,490 GF FFL +41,600 Ridge +41,808 Ridge +41,320 Ridge +40,360 +40,160 Ridge +34,550 1F FFL +38,240 Eaves +41,630 Ridge 01 02 03 04 02 08 13 12 11 01 13 Sill lowered Sill lowered Sill lowered Sill lowered Sill lowered Sill lowered Sill lowered Privacy glass Step in facade Brick and stone banding to proposed wall return reinstated in reconstituted materials to match existing on site Step in facade 41,600 +38,240 Eaves +34,550 1F FFL +30,490 GF FFL Conversion Proposed 01 02 03 02 12 08 11 Decorative chimney reinstated using reclaimed brick from site Privacy glass +41,630 Ridge +38,240 Eaves 02 04 12 +41,600 Ridge +41,808 Ridge +41,630 Ridge +41,320 Ridge +40,360 +38,240 Eaves +37,890 Eaves 09 08 08 10 01 Concealed gutter Opening altered to match adjacent existing windows 11 Step in facade Proposed Conversion +34,550 1F FFL +30,490 GF FFL +41,600 09 08 +41,600 Ridge 01 02 12 Privacy 01 Proposed Elevation 01 02 Proposed Elevation 02 03 Proposed Elevation 05

Broxtowe Garage Sites, Chilwell

Project Information

Site Area

7,566m2 (Total)

This project involved work on 5 separate sites within Chilwell and Kimberley. By closely working alongside Broxtowe Borough Council and the project Contractor, I was involved in the proposals from initial feasibility and conception through to Stage 4 Drawing Issue.

Stage 4

Site Plans

5no. Residential Infill Schemes RIBA Stage 3 RIBA Stage 0-2

Involvement Programme

Project Assistant Autocad / Sketch

- 2

- 1

RIBA Stage 5-7
RIBA
Car Parking 15no. Spaces RPA shown dashed. New development not encroaching more than 20% as per guidance 5500 6310 2500 MH Turning Private Garden 80sqm Private Garden 42sqm Tree removed to allow additional parking Bin collection area 5090 6030 Primaryelevation elevationSecondary highways designs be assessed Highways Engineer 01 02 03 04 08 11 01 +107,400 Optional roof mounted photovoltaic solar panels, subject overshadowing analysis +107,400 +107,550 +107,400 +180,310 +107,860 +107,550 +107,550 Gardens slope 1:11 gradient Patio slope away from building 1:20 gradient 02 KEY Buildings Cark Parking Tarmac Garden/ Proposed Landscape Existing Landscape Zone External Paving Zone Existing Trees retained Trees be felled Closed boarded timber fence panels 1.8m high Gate Retaining stucture (railway sleepers woodblock gravel boards) Optional: PV Solar panels Vertx approved Area Schedule Unit Bed person GEA: 97.2m Unit Bed Person GIA: 79m Legal Info RaynerDaviesArchitects Nottingham Kent 2766(08)D02 A 30/06/22 Spring Close, Watnall Residential Development Spring Close Proposed Site Plan Planning Proposed Site Plan - 30/06/22 DK - 07/07/22 MJV Landscaping updated 84 Chilton Drive 61 Chilton Drive 28 Hillcrest Close 35 Edgwood Close Woodbine Cottages Car Parking 7no. Spaces 01 02 03 07 06 04 Increase of footprint to neighbouring property as per full planning application 22/00214/FUL. Decision: Conditional Permission. Garden 106 Garden 3500 6000 (08)E04 C-C 05 Refuse collection 1500 ASHP ASHP Trees to increase garden privacy 1175 +108,200 +108,350 +108,200 02 2400 Refuse collection area +108,350 01 01 (Rear) 02 (Rear) DirectionofFall KEY Buildings Cark Parking Tarmac Private Garden P.O.S External Paving Zone Proposed Tree PV Solar Panels 1.8m Tall Closeboard Timber Fencing N - 00/00/00 XX RaynerDaviesArchitects Nottingham www.rd-architects.co.uk Nottingham Kent 2766(08)E02 C 23/11/22 Chilton Drive, Kimberley Residential Development Chilton Drive Proposed Site Plan MJVPlanning A3 01 Proposed Site Plan 1m 5m 10m 20m 1:200 Legal Info ©RDA Consultant Architects. Drawing not construction. dimensions boundaries be confirmed client solicitors with reference title deeds. This drawing intended commissioning client only. RDA 16/06/22 DK Amended Following DTM 05/09/22 DK Roof Plan Added 25/11/22 DK Amenity Space Amenity Space Amenity Space
lifted Felled 2400 1200 Approval.
Access Open access Adjacent buildings design and specification Grassed area formed newly imported topsoil and seeded, depths engineers Public landscaped area refer Hard landscaping Both covers laid accordance with manufacturers recommendations; on 30-40mm mortar bedding and jointed, levels TBC. Boarders paved areas edges New trees Landscape Architects Adopted Highways Boundary concrete posts, caps, concrete gravel boards. System provide year 1m 1.8m flat feather board timber gate, braced and ledged, Jacksons Fencing, provide guarantee. Extent adopted highway be reinstated carriageway. Surfacing and civil engineers design and specification and Extent adopted highway be reinstated footway. Surfacing and civil engineers design and specification and highways Generally Drawings are read colour Architects Outline Specification Drawing read conjunction with civil RaynerDaviesArchitects NG1 2JG 01159473859 Nottingham 03/07/23 Broxtowe Borough Council Felton Close, Chilwell Proposed Site Plan DK MJV 01 Site Plan 03/07/23 DK Legal Info boundaries confirmed client solicitors with reference title deeds. drawing must read conjunction relevant engineer's 11/01/23 DK Revised following latest site plan update 18/01/23 MJV 24/01/23 MJV Surfacing update PrivateGarden 121m (Including Paving) (08)B05 (08)B04 PrivateGarden 98m (Including Paving) 21000 existingfacinghabitableroom 1000 2500 2500 2500 2500 2500 2500 2415 Existing kerbline (shown red Extent highway surfacing 1000 1000 PLOT PLOT +49,000 Adjacent buildings design and specification specification accordance with Remediation Strategy Public landscaped area refer Landscape Architects design Hard landscaping concrete slabs, spec TBC concrete slabs, spec TBC 30-40mm mortar bedding jointed, levels TBC. Boarders paved areas Existing Trees be Retained specification board fence, treated panels with slotted concrete posts, caps, concrete gravel Fencing, provide year guarantee. Extent adopted highway reinstated highways approval. footway. Surfacing engineers design and specification and highways Generally Drawings read conjunction with Architects Outline Specification All stated levels are A.O.D. Levels highlighted planning approved. levels subject S.E. Drawing read conjunction with RaynerDaviesArchitects Nottingham Kent 2766(80)B01 18/01/23 Broxtowe Borough Council Gayrigg Court, Chilwell Proposed Site Plan MJV Tender A1 - 10/01/23 DK Legal Info structural engineer. 19/01/23 MJV General update 21000 SELSIDE COURT PrivateAmenity Space91.9m (IncludingPaving) PrivateAmenity Space49m (Including PrivateAmenity Space50.4m (IncludingPaving) Extent and specification Authority. 5000 2500 1000 1000 1000 1200 PLOT PLOT PLOT Cark Parking surfacing civil engineers Road surface civil engineers design and Grassed area formed newly imported Remediation Strategy Landscape Architects design Hard landscaping concrete slabs, spec TBC concrete slabs, spec TBC manufacturers recommendations; compacted 50mm layers. Finished levels TBC. Boarders paved areas New trees Landscape Architects Adopted Highways Boundary 1.8m high Closed Boarded Timber Fence panels, Jackson Fencing Top feather boards. System provide 25 year 1m 1.8m feather board timber Extent adopted highway reinstated highways approval. footway. Surfacing civil engineers Generally design and site setting out. engineers Landscape architects design specification RaynerDaviesArchitects Nottingham Nottingham 2766(80)A01 Broxtowe Borough Council Selside Court, Chilwell Proposed Site Plan MJV A1 - 09/01/23 DK Legal Info survey information others. Check dimensions structural engineer. 12/01/23 General update
2 3 4 5
1
019

RIBA Stage 5-7

Stage 4

1. Site 4 GA Sections

A.G02 Kitchen A.G01 Lobby A.F04 Master Bedroom A.F03 Bedroom B.F01 Hall B.F06 Master Bedroom B.G01 Lobby C.F01 Hall C.F06 Master Bedroom C.G02 Kitchen C.G01 Lobby (21)A01 AA (21)A01 AA +59,465 Ridge +56,460 Eaves 1 +58,729 Ridge +55,860 Eaves +50,600 External GL (PA) +53,567 01 FF FFL +53,267 02 FF FFL +52,967 03 FF FFL 2250 s/o 2175 s/o 1040 1285 s/o 2400 FTC 2700 FTF 890 1360 s/o 890 1360 s/o 890 1360 s/o Footings to S.E design Min 2400 FTC 2700 FTF 2400 FTC 2400 FTC 2700 FTF 2400 FTC 2400 FTC 250 Sub Floor Void Ventilation 250 Sub Floor Void Ventilation 250 Sub Floor Void Ventilation 250 Sub Floor Void Ventilation 250 Sub Floor Void Ventilation 2400 FTC 2400 FTC 2400 FTC RT.01 FT.02 FT.02 FT.02 FT.02 RT.01 RT.01 +50,567 02 GF FFL 100 or 150? D01 (30)D01 D02 (30)D02 D03 (30)D03 +50,867 01 GF FFL +50,567 02 GF FFL +50,267 03 GF FFL Footings to S.E design Periscopic vents Level access threshold as per DWG 2766(30)D02 2no. 12.5mm fireline to provide 60 minute fire spearation Insulation to continue 225mm below u/s of floor insulation Roof truss to specialist manufacturers design 50mm XPS insulation 0.019 thermal conductivity 2no. 12.5mm fireline to provide 60 minute fire spearation 2no. 12.5mm fireline to provide 60 minute fire spearation Periscopic vents FT.01 Min. 2400 FTC 2700 FTF Min. 2400 FTC 2700 FTF Periscopic vents +53,267 02 FF FFL +50,567 02 GF FFL +53,267 02 FF FFL FT.01 To all IW.03 and FT.01 Junctions: Foamglas insulation block thermal conductivity 0.058W/mK B.G02 Kitchen 50mm XPS insulation 0.019 thermal conductivity FT.01 SVP SVP SVP (21)A01 AA (21)A01 BB RWP RWP 01 North 02 East 03 South 04 West Min 250 void FT.01 Suspended Ground Floor FR Rating: N/A DnT,w + C tr dB: N/A Duty: N/A 75mm floating sand cement screed 500 gauge polythene separating layer 120mm Rigid PIR insulation of thermal conductivity 0.019W/mK or better DPM Gas membrane as required (Refer to relevant Site Investigations) to contractor design Concrete beam and block floor to S.E. Specialist subcontractor design, with min 250mm ventilated sub floor void by means of periscopic vents to external wall. FT.02 Timber upper floors FR Rating: N/A R dB 40 Duty: N/A FT.03 Upper (Party) floor FR Rating: 60min DnT,w + C dB: 45 Duty: N/A 22mm T&G Chipboard Joists to S.E. design and specification 100mm mineral wool min density 12kg/m 16mm metal resilient bar at 400 centres 9.5mm gypsum ceiling board with plaster skim finish 75mm floating sand cement screed Acoustic underlay, min 4.5mm o/a uncompressed thickness. Concrete beam and block floor to S.E. Specialist subcontractor design 9.5mm gypsum ceiling board with plaster skim finish, on MF ceiling system RT.01 Pitched cold roof, vented FR Rating: N/A DnT,w + C dB: N/A Duty: N/A Fibre cement tile roof cover 25 50mm S/W treated timber battens and counter battens Underlay Truss to specialist manufacturer's design and specification 450mm (100 between joists, 150 + 100 + 100) mineral wool, thermal conducitivty 0.034W/mK or better Ceiling finish to houses: 2no. 12.5mm fireline, to provide 60 minute separation, plaster skim Ceiling finish to apartment: 1no. 9.5mm gypsum board, plaster skim Co-ordination Aspects of this drawing listed below are in abayance, pending information from others. Co-ordination with Truss Manufacturer's design and specification Building Control Plans Appraisal including but not limited to: SAP Calculation Fire Authority consultation Generally Drawings are to be read in colour Drawings are to be read in conjunction with Architects Outline Specification All stated levels are to A.O.D. Levels highlighted in blue are planning approved. All levels subject to S.E. design and site setting out. RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2766(21)A01 B 19/01/23 STATUS REVISIONS NOTES Broxtowe Borough Council Selside Court, Chilwell Propsed GA Sections A-A, B-B and C-C DK MJV Tender A1 01 Section CC - 08/12/22 DK First Issue 0.5m 2m 4m 1:50 Legal Info ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing in either paper digital form. Use written dimensions only. All dimensions are given millimeters unless otherwise stated. survey information by others. Check dimensions on site. Site boundaries confirmed client solicitors with reference title deeds. This drawing intended for use the commissioning client only. RDA do not assume any liability any third party the information herein. 4. This drawing must read conjunction with all relevant engineer's and specialist designers’ drawings and specifications. 5. demolition works subject to statutory approval and assessment by structural engineer. Works covered pre-commencement conditions or works without consent must NOT be carried out without statutory approval. 03 Section BB 02 Section AA 00 Key Plan A 12/01/23 DK B 19/01/23 DK Structural Co-ordination
RIBA
RIBA Stage 3 RIBA Stage 0-2

2. Soffit Junction Detail

3. Site 2 GA Ground Floor Plan

021
SVP 2000 1702 2807.5 A.101 Hall A.104 Storage 2.7 sqm A.103 Bathroom 4.8 sqm Bedroom 1 14.0 sqm 2807.5 2404.5 4602 797.5 s/o 664.5 726.5 7087.5 797.5 s/o 4040 797.5 s/o 726 4602 797.5 s/o 664.5 RWP RWP SVP 2000 1702 2807.5 B.101 Hall B.104 Storage 2.7 sqm B.103 Bathroom 4.8 sqm Bedroom 1 14.0 sqm 2807.5 2404.5 SP F/F WM/TD 4065 2000 1700 5312.5 1388.5 3824 3167 1000 A.G04 Living/Dining 20.8 sqm Unit A 2 Bed 4 Person 76.9 sqm A.G01 Lobby A.G02 Kitchen 9.0 sqm A.G03 WC 2.1 sqm 11690 1012.5 552.5 1135 s/o 890 1135 s/o 552.5 1135 552.5 1135 s/o 890 1135 s/o 552.5 1012.5 3027.5 4714.5 4602 1022.5 s/o 664.5 1565 910 s/o 2127 389 7087.5 1135 s/o 440 1135 s/o 890 1135 s/o 440 1135 s/o 388.5 450 3027.5 4714.5 4602 1022.5 s/o 664.5 1565 910 s/o 2127 450 RWP RWP RWP SP F/F 4065 1700 5312.5 1388.5 3824 3167 B.G04 Living/Dining 20.8 sqm Unit B 2 Bed 4 Person 76.9 sqm B.G01 Lobby B.G02 Kitchen 9.0 sqm B.G03 WC 2.1 sqm 2000 RWP RWP A.G05 Laundry Store 0.6 sqm WM/TD B.G05 Laundry Store 0.6 sqm EW.02 EW.02 Generally Drawings are to be read in colour Drawings are to be read in conjunction with Architects Outline Specification All stated levels are to A.O.D. Levels highlighted in blue are planning approved. All levels subject to S.E. design and site setting out. All junction details to be either to Robust Details or subject to on site testing. Contractor to confirm with BCO AI. External dimensions are to face of brick / cladding. Internal Co-ordination Aspects of this drawing listed below are in abayance, pending information from others. Co-ordination with Truss Manufacturer's design and specification Building Control Plans Appraisal including but not limited to: · SAP Calculation · Fire Authority consultation · Structural, Civil and M&E Engineer Designs REVISIONS NOTES 02 Ground Floor Plan - 07/07/23 DK First Issue 0 0.5m 1:50 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. Do not from this drawing in either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title 3. This drawing is intended for use by the commissioning client only. 03 First Floor Plan Aircrete Blockwork 12.5mm gypsum board on adhesive dabs, plaster skim finish 150mm full fill mineral wool, thermal conducitivty 0.032W/mK Proprietary Cavity tray and DPC system Weepholes every third perpend Brick slip, specification to match main brick IG Brick Slip lintel to S.E. Specification Steel to S.E. Design and specification 21mm cedar cladding boards 25x50mm s/w treated timber battens SW treated timber battens fixed to u/s of joists 25 + 60mm mineral wool insulation thermal conductivity 0.032W/mK PIR bonded plasterboard head thermal conductivity 0.019W/mK Lintel to S.E. Specification 102.5 facing red brick in stretcher bond Stainless steel wall ties staggered at 225 vertical centres and 900 horizontal Upper floor joists to S.E. Design 22mm T&G Chipboard Floor finishes to HRA Specification 100mm mineral wool min density 12kg/m3 - 12/01/23 DK First Issue RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2766(30)D0210/01/23 STATUS REVISIONS NOTES Broxtowe Borough Council Selside Court, Chilwell Proposed Detail Soffit DK MJV Tender A3 01 D02 Soffit 0 50mm 200mm 500mm 1:5 Legal Info ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing in either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries be confirmed by client solicitors with reference title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 4. This drawing must be read conjunction with all relevant engineer's and specialist designers’ drawings and specifications. 5. All demolition works subject statutory approval and assessment by structural engineer. 6. Works covered by pre-commencement conditions or works without consent must NOT be carried out without statutory approval.

RIBA Stage 4

RIBA Stage 3

RIBA Stage 5-7 4. Site 4 GA Elevations

RIBA Stage 0-2

01 +55,860 Eaves +50,267 03 GF FFL +52,967 03 FF FFL RWP 02 04 150mm Vent 30 l/s WC 06 +58,732 Ridge +59,465 Ridge 01 RWP 04 02 150mm Vent 15 l/s WC 06 Levels subject to S.E input +56,460 Eaves +50,867 01 GF FFL +53,567 01 FF FFL 460 750 1360 s/o 1360 s/o 460 750 460 750 460 750 460 750 460 750 460 750 2147.5 1285 s/o 1135 2175 2175 1135 2175 1285 s/o 1285 s/o 1360 s/o 1360 s/o 1360 s/o 01 02 02 02 03 03 03 04 04 04 04 04 04 04 04 04 04 05 05 05 05 05 1135 +56,460 Eaves 1 +55,860 Eaves 3 +50,867 01 GF FFL +50,567 02 GF FFL +50,267 03 GF FFL +53,567 01 FF FFL +53,267 02 FF FFL +52,967 03 FF FFL 01 03 Side Elevation Side Elevation 2325 s/o 2325 s/o 2325 s/o 1040 1040 890 890 890 150mm Vent 15 l/s WC 150mm Vent 15 l/s WC 150mm Vent 30 l/s WC 150mm Vent 30 l/s WC 150mm Vent 15 l/s WC 150mm Vent 15 l/s WC 500 500 Levels subject to S.E input +59,465 Ridge +58,877 Ridge 2 +58,729 Ridge 3 500 460 862.5 460 750 460 750 460 862.5 460 750 460 750 01 03 03 03 05 03 01 1360 s/o 2175 s/o 1360 s/o 1360 s/o 2175 s/o 1360 s/o 1360 s/o 2175 s/o 1360 s/o 05 05 05 04 04 04 04 04 04 04 04 815 815 815 890 890 890 150mm Vent 30 l/s WC Levels subject to S.E input 500 500 500 +56,460 Eaves 1 +55,860 Eaves +50,867 01 GF FFL +50,567 02 GF FFL +50,267 03 GF FFL +53,567 01 FF FFL +52,967 03 FF FFL +59,465 Ridge +58,877 Ridge 2 +58,729 Ridge 3 MATERIAL KEY Buff Brick laid in stretcher bond. Brick specification TBC. Western Red Cedar vertical board cladding. Buff Brick laid flemish bond with projecting headers (cut brick) Clear double glazed UPVC windows and doors RAL 7016 Anthracite Grey. All glazing to comply with impact resistance and guarding requirements of Part K of the building regulations. Any glazing less than 800mm above FFL to be toughened. As per 04, with obscure glazing Fibre cement tile roof cover GRP Composite Doors with Double Glazing. RAL TBC, provisionally RAL 7016 Anthracite. Glazing to be toughened comply with Part K of the building regulations for impact resistance. 01 02 03 04 05 06 07 Co-ordination Aspects of this drawing listed below are in abayance, pending information from others. Co-ordination with Truss Manufacturer's design and specification Building Control Plans Appraisal including but not limited to: SAP Calculation Fire Authority consultation Generally Drawings are to be read in colour Drawings are to be read in conjunction with Architects Outline Specification All stated levels are to A.O.D. Levels highlighted in blue are planning approved. All levels subject to S.E. design and site setting out. SVP SVP SVP (21)A01 AA (21)A01 BB RWP RWP 01 North 02 East 03 South 04 West Levels updated subject input RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2766(21)A02 B 18/01/23 STATUS REVISIONS NOTES Broxtowe Borough Council Selside Court, Chilwell Proposed GA Elevations DK MJV Tender A1 03 Side Elevation 01 - 08/12/22 DK First Issue 0.5m 2m 4m 1:50 Legal Info ©RDA Consultant Architects. Drawing not construction. Do not scale from this drawing in either paper or digital form. Use written dimensions only. All dimensions are given millimeters unless otherwise stated. All survey information by others. Check all dimensions on site. Site boundaries confirmed by client solicitors with reference to title deeds. This drawing intended for use the commissioning client only. RDA do not assume any liability to any third party for the information herein. This drawing must read conjunction with relevant engineer's and specialist designers’ drawings and specifications. All demolition works subject statutory approval and assessment by structural engineer. Works covered pre-commencement conditions works without consent must NOT be carried out without statutory approval. 04 Rear Elevation 01 Side Elevation 02 02 Front Elevation B 00 Key Plan A 12/01/23 DK General updates B 19/01/23 DK Structural Co-Ordination

5. Level Access Threshold Detail

6. Site 3 GA Ground Floor Plan

023
12590 337.5 1022.5 s/o A.G05 Kitchen 10.2m (21)B01 AA (21)B01 BB (21)B01 CC 1 3 4 6 5 FF FF RWP SP RWP RWP RWP 1340 910 s/o 1340 1810 s/o 1790 1810 s/o 1340 910 s/o 1340 8090 1677.5 1135 s/o 2812.5 8090 1677.5 1135 s/o 5277.5 225 327.5 572.5 s/o 327.5 1002.5 1585 s/o 1790 1585 s/o 1002.5 1022.5 s/o 225 327.5 572.5 s/o 327.5 337.5 5787.5 835 1650 3117.5 5787.5 835 1650 3117.5 2757.5 1615 2757.5 960 1615 15 l/s 30 l/s 30 l/s 15 l/s A.G02 WC 1.3 sqm A.G04 Living/Dining 19.5m Unit A 3 Bed 4 Person 83.2m2 B.G03 Kitchen 10.2m B.G04 Living/Dining 19.5m2 Unit B 3 Bed 4 Person 83.2m2 B.G05 Kitchen 10.2 sqm B.G01 Hall 5.1 sqm B.G02 WC 1.3 sqm B.G04 Living/Dining 19.5 sqm Unit B 3 Bed 4 Person 83.2 sqm A.G05 Kitchen 10.2 sqm A.G01 Hall 5.1 sqm A.G04 Living/Dining 19.5 sqm Unit A 3 Bed 4 Person 83.2 sqm 603 452.5 603 477.5 EW.01 EW.04 IW.02 B.G03 Store/Plant 1.3 sqm A.G03 Store/Plant 1.3 sqm 1025 960 1 2 3 4 6 5 1050 SVP IW.03 SVP A.101 Hall 3.7 sqm A.106 Bedroom 3 7.5 sqm A.105 Bathroom 4.9 sqm A.104 Store/Plant 1.8 sqm 4 6 5 7 8 9 10 11 12 (21)B01 BB SVP RWP 8090 4152.5 8090 4152.5 1565 910 s/o 3027.5 910 s/o 3027.5 1360 s/o 890 3140 890 1565 910 s/o 910 s/o 1360 s/o 3281.5 2405 2110 2287.5 15 l/s 3910 1900 1345 1347.6 EW.01 EW.02 B.101 Hall 3.7 sqm B.106 Bedroom 3 7.5 sqm B.105 Bathroom 4.9 sqm B.104 Store/Plant 1.8 sqm 3281.5 2405 2110 2287.5 15 l/s 3910 1900 1345 1347.6 (21)B01 CC (21)B01 CC 3 2 1 60 Minute FR Loft Hatch 60 Minute FR Loft Hatch SVP Generally Drawings are to be read in colour Drawings are to be read in conjunction with Architects Outline Specification All stated levels are to A.O.D. Levels highlighted in blue are planning approved. All levels subject to S.E. design and site setting out. Co-ordination Aspects of this drawing listed below are in abayance, pending information from others. Co-ordination with Truss Manufacturer's design and specification Building Control Plans Appraisal including but not limited to: REVISIONS NOTES 01 Ground Floor Plan - 08/12/22 DK First Issue 0 0.5m 1:50 Legal Info 02 First Floor Plan A 12/01/23 DK B 19/01/23 MJV Polymer modified mortar 600x600x50 precast concrete paving slabs ACO threshold drain Concrete haunch to drain min 50mm Part M Compliant level access threshold 150mm compacted MOT Type1 25mm rigid edge insulation 75mm Sand cement screed Polythene separating layer 120mm PIR 0.019W/mK DPM to lap inner face of blockwork and continue under threshold 30mm mortar bedding 50 - 12/01/23 DK First Issue RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2766(30)D01 A 19/01/23 STATUS REVISIONS NOTES Broxtowe Borough Council Selside Court, Chilwell Proposed Detail Level Access Threshold DK MJV Tender A3 01 D01 Level Access Threshold 0 50mm 200mm 500mm 1:5 Legal Info ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing in either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries be confirmed by client solicitors with reference title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 4. This drawing must be read conjunction with all relevant engineer's and specialist designers’ drawings and specifications. 5. All demolition works subject statutory approval and assessment by structural engineer. 6. Works covered by pre-commencement conditions or works without consent must NOT be carried out without statutory approval. A 19/01/23 MJV Paving update

This project was situated in a conservation area of Nottingham and involved numerous constraints and requirements. The design was crafted such that the street facing façades architecturally responded to the Victorian housing adjacent to the site. My role on the project involved producing visualizations using Lumion and assisting with the full set of planning drawings.

RIBA Stage 0-2 RIBA Stage 4 RIBA Stage 5-7 Project Information Site Area Involvement Programme Location Plan Site Plan 3,947m2 Project Assistant Autocad / Lumion Addison Street, Nottingham Residential Apartment Scheme 24 26 22 19 to 21 NEWSTEADGROVE 23 26 ANNESLEY GROVE 22 30 30 26 28 ChineseBellGarden Statue 27 29 38 25 ADDISON STREET 28589.4 27823.4 5284.2 2836.8 32195.4 3952.3 28320.1 33147.1 30993.9 8609.5 9872.1 12041.7 3085.5 4525.5 45° deg. angle from neighbouring property window 25460.2 45214.4 12242.5 15628.1 30365 15627.5 15177.3 6344.5 8268.3 6144.2 A3 01 Proposed Block Plan - 24/03/22 DK First Issue 0 5m 20m 40m 1:500 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing either paper digital form. Use written dimensions only. All dimensions are given millimeters unless otherwise stated. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. This drawing intended for use by the commissioning client only. RDA not assume any liability any third party for the information herein. RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2928(08)00224/03/22 STATUS REVISIONS NOTES New Residential Apartments 29 Addison Street Proposed Block Plan DK TB Planning N Application Boundary 28 30 12a 24 26 22 MANSFIELD GROVE 42 11to1 15 38 12 2to12 14to20 19 to 21 El Sub Sta 36 14 Convent NEWSTEADGROVE 23 26 ANNESLEYGROVE 22 30 30 20 26 28 Arboretum ChineseBellGarden Bowling Green Statue 27 29 Subway 38 25 ADDISON STREET 44 456800 456800 456850 456850 456900 456900 456950 456950 340700 340700 340750 340750 340800 340800 340850 340850 340900 340900 metres 0 20 40 60 80 100 456775 340690 456775 340907 456972 340907 456972 340690 SK5640 SK5640 SK5640 SK5640 MapServe © Crown copyright 2021 Ordnance Survey 100053143 N - 00/00/00 XX First Issue RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2928(03)00128/07/21 STATUS REVISIONS NOTES New Residential Apartments 29 Addison Street Location Plan TCB JMG Preliminary A3 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. Do not scale from this drawing in either paper or digital form. Use written dimensions only. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. RIBA Stage 3
025

RIBA Stage 5-7

RIBA Stage 4

RIBA Stage 0-2

1. Site Layout and Ground Floor Plan

-0.6m (08)S01 AA (08)S02 BB Mechanical smoke shaft size & specs tbc by Fire eng. & M&E eng. Mechanical smoke shaft size & specs tbc by fire eng. & M&E eng. Extent of facade of upper levels Extent of facade of upper levels Sill height FFL +1050mm Privacy hedge planting, approx. 1m height Low level planting to maximise daylight to adjacent apartment Sill height FFL +1050mm Sill height to all front windows FFL +1050mm Sill height to front windows FFL +1050mm Existing conifer and ground cover planting removed to improve site access existing conifer hedgerow removed in this location to make way for new development Replace ext. doorway with window for bedroom Ext. internal doorway to become external secondary escape door. Subject to Fire strategy Ext. timber staircase demolished to create new access to kitchen area and improve daylighting. BCO Fire Engineer to confirm no access from upper floors required for escape Basement access retained for landlord access only. Basement to be kept clear & no regular access required. Existing. door to become external door. Ext. glazing and brick infill panels to be replaced with new timber french doors and windows refer to elevations new full height painted timber framed windows. Privacy glass new full height painted timber framed windows. Privacy glass new masonry piers. All weatherboarding to GF facade removed and overclad in breathable render finish. refer to elevations. block up block up block up demolish nibs build floor level up as required. privacy glass + fixed lights demolish nib integral full height cbds breakfast bar demolish flat roof single storey extension demolish outbuildings demolish existing gable ended single storey wing demolish existing gable ended single storey wing and replace with new build extension, broadly to match existing footprint 1500 1500 1500 1500 1500 1500 2850 2600 3367.5 2285 2250 2850 2300 2875 4120 3385 Line of wall above Line of wall above -0.6m -0.6m -0m -0m Residents' gate for Pavilion refurb and new wing units only Core A 0m FFL Plant Meter Room 15m2 2B4P duplex above Formal landscaped gardens (Landscaping design by others) Core Entrance Addison Street +71,700 FFL ('0m FFL') Core Entrance Addison Street +71,700 FFL ('0m FFL') Core A Entrance Gardens -1.5m Unit 07 2B3P 61m -1.5m FFL Unit 01 2B3P 67m -1.5m FFL Unit 02 2B3P 63m -1.5m FFL Unit 03 2B3P 61m -1.5m FFL Escape window Unit 08 1B2P 54m -1.5m FFL Unit 05 2B3P 67m -1.5m FFL Unit 04 2B3P 63m -1.5m FFL Unit 06 2B3P 61m -1.5m FFL cpd 2m cpd 0.7 m cpd 0.8m cpd cpd cpd cpd cpd cpd 1.3m cpd Escape window Unit 05 Private Terrace 12.5m -1.5m FFL Unit 01 Private Terrace 12.5m -1.5m FFL Core B -1.5m FFL Meter room 2.3m 1.1m cpd cpd 1.6m Unit 07 Private Terrace 24m -1.5m FFL 02 03 04 05 06 07 08 09 10 11 Car Park 11 Spaces For full layout refer to dwg. 2928(08)L01 Site Plan Unit 28 1B1P 39m2 +71,850 FFL Unit 27 2B4P 84m2 Duplex Entry Level +71,850 FFL Unit 28 Private Terrace 40m2 Unit 27 Private Terrace 24.5m2 Unit 26 2B4P 87m2 +71,850 FFL Landscaping design by others) 27 Addison Street Double Bed 13m2 Single Bed 11.9m2 cpd 1m cpd 0.7 m Double Bed 11.8m2 Single Bed 9m Single Bed 10m Double Bed 12m cpd 0.7 m cpd 1.3 m Single Bed 10m Double Bed 11.7m (exc. ensuite) Double Bed 14.9m Axis through site driven by sight lines through to Chinese bell tower cpd 0.7 m 0.9 m cpd Unit 25 2B4P 79m2 Duplex Entry Level +71,850 FFL Unit 26 Private Terrace 12m2 45°deg. angle from neighbouring property window 0m FFL -0.6m -0.6m -0.6m -1.5m Existing trees removed refer to site plan and arboreal information stone retaining wall retained stone retaining wall retained stone retaining wall retained demolish existing poor quality blockwork outbuilding + boundary wall existing 2.1m timber fence retained and length extended to join new boundary wall new timber fence and gate Refuse store 7 x 1100ltr wheeled bins proprietry cycle shelters screened by wall (20 cycles) new 1.8m timber boundary fence to secure site. Post & panel arrnagement to limit footings within RPAs as recommended by Arb report. 0m A) LAYOUT NOTES All layouts comply with Nationally Described Space Standard minimum requirements. Overall unit size, bedroom sizes and widths, and storage areas indicated on plans for each unit type. B) UNIT SCHEDULE (Refer to 2928(08)K01 for Colour-coded unit diagrams Type Level LGF UGF FF 2F Total Duplex (2 bed/ 4p) - 17 - 19 (38 beds) Flat (2 bed/ 4p) - - - 1 beds) Flat (2 bed/ 3p) - - - 7 (14 beds) Flat (1 bed/ 2p) - - - 1 (1 bed) Flat (1 bed/ 1p) - - - 1 (1 bed) Total 12 - 17 - 29 (56 beds) C) GIA AREA SCHEDULE:(m2) New build Refurb Total LGF 748 100 848 UGF 558 - 558 FF 658 57 715 2F 477 54 531 Total 2,441 211 2,652 D) GEA AREA SCHEDULE:(m2) New build Refurb Total LGF 830 115 945 UGF 613 - 613 FF 737 68 805 2F 532 63 595 Total 2,712 246 2,958 E) TOTAL GROSS AREA DEMOLITION 182m2 F) SITE AREA = 4,000m2 0.98 acres 0.4 Ha. PLANS KEY Equates to +71.70m above OS datum Existing Wall Retained Proposed External Wall Proposed Internal Wall Existing Walls Demolished RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2928(08)G01 D 05/04/22 STATUS REVISIONS NOTES New Residential Apartments 29 Addison Street Proposed Lower Ground Floor Plan DK TB Planning A1 01 Lower Ground Floor Plan - 17/02/22 DK First Issue 1m 5m 10m 1:100 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. This drawing intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. N A 02/03/22 TB Unit no. increase from 26 to 29 as per client request - see rev. clouds B 25/03/22 DK General Updates C 25/03/22 JMG Cycle shelters added D 05/04/22 JMG Proposed boundary wall substituted for proposed fence as recommended within Arb Report. RIBA Stage 3
027
3. Elevation Concept Sketches 2. Additional Render Produced using SketchUp and Lumion

Rosemary Street, Mansfield Residential Scheme

Our project at Rosemary Street provided numerous challenges. Having joined the project at initial concept stage, I was able to co-ordinate with the client, local authority and sub-contractors to produce a number of design iterations that addressed the specific contextual requirements.

RIBA Stage 0-2 RIBA Stage 4 RIBA Stage 5-7 Project Information Site Area Involvement Programme Location Plan Site Plan 659m2 Project Assistant Autocad / Lumion 1a 1 Depot 3 87a 89 95 Westfield Hotel (PH) 107 99 79 69 WESTFIELDLANE 453175 453175 453200 453200 453225 453225 361450 361450 361475 361475 361500 361500 361525 361525 metres 0 10 20 453157 361448 453157 361538 453240 361538 453240 361448 SK5361 SK5361 SK5361 SK5361 MapServe © Crown copyright 2021 Ordnance Survey 100053143 A609 ROSEMARY STREET LADYBROOKLANE WESTFIELDLANE Existing Crossover Retained 15040 Offices Estimated GIA (based on OS data) = 394m2 69 79 71 73 75 77 1 Ladybrook Lane Bin Store Cycle Store R2 R3 O6 O7 O3 O5 O2 O1 R4 R5 R1 O4 12680.1 3000 2500 5000 5000 4800 2500 Ent 01 02 03 New Brick Wall, 1.2m Buildings Permeable Block Paving Office parking bays Permeable Block Paving Residential parking bays Tarmac Bollard Existing low level brick wall New brick wall Concrete paving slabs Gravel splash strip Communal soft landscaping zone Grass verge (adopted footpath) Existing Tree and RPA (Blue dash) retained Proposed new tree Schedule Unit 01 1Bed 2Person 57m Unit 02 2Bed 4Person 70m Unit 03 2Bed 4Person 87m Total 5 Bed 10 person Car Parking 5no. Residential 7no. Offices N - 22/07/22 MJV First Issue RaynerDaviesArchitects St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2158(08)A01 A 01/02/23 STATUS REVISIONS NOTES Rosemary Street, Mansfield Residential Development Proposed Site Plan DK MJV Planning A3 01 Proposed Site Plan 1m 5m 10m 20m 1:200 Legal Info ©RDA Consultant Architects. Drawing not for construction. All dimensions are given millimeters unless otherwise stated. All survey information by others. Check all dimensions on site. Site boundaries to confirmed by client solicitors with reference to title This drawing intended for use by the commissioning client only. RDA not assume any liability to any third party for the information herein. A 21/03/23 DK Revised to Planner Comments
RIBA Stage 3
029
+133,370 GF FFL +136,295 1F FFL +139,545 Parapet +141,425 Ridge 02 03 05 02 04 04 02 03 +139,545 Parapet +141,425 Ridge +136,295 1F FFL +133,370 GF FFL 04 04 04 04 04 04 05 +139,545 Parapet +141,425 Ridge +136,295 1F FFL 01 +133,370 GF FFL 03 04 04 04 04 04 04 04 04 04 04 04 04 04 05 04 01 03 06 02 +139,545 Parapet +141,425 Ridge +136,295 1F FFL +133,370 GF FFL Facing Red Brick Fibre Cement Slate Roof uPVC gutters and fascias Brick Relief Detailing Window - RAL TBC uPVC, Clear Double Glazing As - Frosted Glazing for Privacy 01 02 03 04 05 06 05 RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 01/02/23 STATUS REVISIONS NOTES Rosemary Street, Mansfield Residential Development Proposed Elevations HD DK A3 03 West Elevation - 22/07/22 MJV First Issue 0 1m 5m 10m 1:100 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 01 East Elevation 02 South Elevation 04 North Elevation A 09/11/22 HD Extruded window frames added B 21/03/23 DK Revised to Planner Comments
RIBA Stage 0-2 RIBA Stage 4 RIBA Stage 5-7 1. Elevations
RIBA Stage 3

2. Plans

031 Bedroom 2 Bathroom 01 03 Lobby Kitchen/ Living/ Dining Lobby FR/FZ 3400 Kitchen/ Living/ Dining Lobby +133,370 5815 6515 3100 5840 2850 3375 20745 Bedroom 1 En-Suite (08)A04 A-A (08)A04 B-B 02 Apt. 1 2bed 4person 70.2m2 Apt. 3 1bed 2person 57m2 2850 Bedroom 2 Bathroom Bedroom 1 Kitchen/ Living/ Dining En-Suite FR/FZ +136,070 Bedroom 1 5815 6515 6295 2815 2965 5310 2000 3050 20745 (08)A04 B-B (08)A04 A-A Apt. 2 2bed 4person 87m2 +140,250 Ridge +139,320 Parapet Direction of fall (08)A04 A-A (08)A04 B-B - 22/07/22 MJV First Issue RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2158(08)A02 B 01/02/23 STATUS REVISIONS NOTES Rosemary Street, Mansfield Residential Development Proposed Plans HD DK Planning A3 01 Ground Floor Plan 0 1m 5m 10m 1:100 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 02 First Floor Plan 03 Roof Plan N A 09/11/22 HD Extruded window frames added and Bedroom 1 layout adjusted B 21/03/23 DK Revised to Planner Comments

I was part of the YMCA scheme team throughout various stages of pre-site co-ordination and on-site construction. Within these various stages I worked on tasks including drawing updates for site and producing setting out plans, schedules and visualizations.

RIBA Stage
Information Elevation Internal Elevation +17,500 GF FFL +21,550 FF FFL +25,375 TOS 4050 +17,500 GF FFL 8552 +21,300 TOS +25,975 +24,957 (21)S02 CC 01 (30)217 01 (30)124 (30)219 01 (30)015 Curtain walling system with revolving door hour fire rated glazing 400mm Exposed services zone below ceiling Steel Truss to SE design Ancon nexus brick soffit system, to SE design and specifications Timber soffit formed of siberian larch sections on NVelope proprietary soffit carrier system fixed back primary structure Cavity tray and weepholes Roof Type 1.1 Security Shutter in bulkhead 2890 Floor to ceiling 2700 675 2700 Glazed security and safety screen Cafe Entrance Sliding Screen RL.017 Internal window to Function Hall W.1.1.002 W.1.1.001 1500 S/O Roof light Type Domed roof light Floor type 1.5 Polished concrete Roof light Type Reception roof light Floor type 1.1 Floor type 2.1 (30)208 2866 2500 2900 3945.1 2900 2080 300 1500 300 3825 Floor u/s soffit 13000 s/o 668 Services zone 400 Services 1100 2675 3375 floor to ceiling 2100 1425 3457 floor to ceiling 7050 3540 2255 3880 2600 s/o 1275 400 c/c 175 105 Fixing Fixing Fixing Fixing Fixing 1500 Fixing 100 7313.1 6845.1 105 Door head gear requires additional headroom to achieve 2960mm min clear. Contractor to allow for tolerance. - All steel members shown indicatively. For all structural information, including primary and secondary steel and foundations, refer to structural engineers drawings and specifications - Services shown indicatively, for details refer M+E engineers drawings and specifications. Rigid slab insulation as per floor, wall or roof type DPM & DPC Vapour control layer KEY Composite panel as per floor wall type Facing brickwork Concrete blockwork Mineral wool insulation, as per wall roof type Areas in Abeyance Revision Cloud Fixing Details Refer to DWG 2242(35)008 for fixing details Type A Type Type C Type D Type Joint position. Scarf joint to provide continuous length Fixing G Fixing 100 Ø8 25 Ø8 B1 150 25 21 B2 25 21 19.3 39.3 B2 REVISIONS NOTES 01 Section G-G - 26/04/22 AL Record Drawing Issue Legal Info ©RDA Consultant Architects. Drawing not construction. scale from this drawing either paper digital form. Use written dimensions only. dimensions given millimeters unless otherwise stated. specialist designers’ drawings and specifications. demolition works subject statutory approval assessment structural engineer. Works covered pre-commencement conditions works without consent must NOT carried out without statutory approval. specific drawing notes are read conjunction with project 0.5m 2m 4m 1:50 Please note this is not 'As-Built' drawing GEA Involvement
RIBA Stage 5-7 RIBA
RIBA Stage
5635 opening 1135 opening Type 1425 6000 opening 2525 1125 2875 525 Curtain Wall Type M1 7050 opening 4510 opening TYPE 3225 opening 4510 opening TYPE A 3225 opening 4510 opening TYPE 3225 opening TYPE AN 4510 opening 2390 opening 835 s/o 1022.5 opening 2100 opening Type L1 4510 opening TYPE 3225 opening 3375 225 s/o 450 s/o 3375 225 s/o 450 s/o (20)E03 01/02 150 1275 7050 s/o 1425 Elevation O 4050 4425 449.2 439.2 450 975 Adjacent Fitness Centre Entrance Signage Zone Signage by others Fabric Sails Indicative only Line 1.8m fence to creche external play spaces +17.35m External Ground Level +21.55m FF Finish Level +17.50m GF Finish Level Parapet+25.975m TOS +21.55m FF Finish Level 2083.4 RB RB Type AK 4510 opening 2550 opening 450 3382.5 opening 2550 opening 450 Type N Type AK 4510 opening 2550 opening 450 Type AM 450 2255 opening 2550 opening 572.5 opening 2550 opening 450 Type AL 1000 1000 250 300 Main Entrance Reception Pre-School Education Wing ED.0.4.001 ED.0.1.027 ED.0.2.021 EW.1.2.011 Elevation set back Elevation set back Elevation set back EW.0.4.001 ED.0.1.024 ED.0.4.003 ED.0.4.002 EW.1.5.015 EW.1.5.035 Type AM 450 2255 opening 2550 opening 572.5 opening 2550 opening 450 Type AL 2035 opening 2485 opening Type 1100 Type L2 3010 opening 2035 opening Elevation A Elevation Elevation D Elevation Elevation Elevation 6000 opening 2525 1125 2875 525 Curtain Wall Type M1 7050 opening 1550 opening 3225 opening TYPE 1425 1040 4050 4425 1940 150 minimum from external ground level +17.35m External Ground Level Parapet+25.975m TOS +17.50m GF Finish Level +21.55m FF Finish Level 400 1224.7 1175 910.3 913 1063 914 450 ED.0.1.027 ED.0.2.023 ED.0.1.024 4510 opening TYPE A 3225 opening 4510 opening TYPE 3225 opening 4050 4425 1275 2550 opening 1425 Elevation L 4050 4425 2242 450 opening 3374.5 225 opening Line 1.8m fence to creche external play spaces +17.50m GF Finish Level +21.55m FF Finish Level Parapet+25.975m TOS Scupper drain feeding into External Hopper Pre-school External Play Areas 3 no. eco habitats for swifts incorporated within brick cladding ED.0.4.006 Climbing Wall General Purpose Activity Space Omitted for clarity Pre-School Community Rooms 1000 1000 250 300 Key - All indicatively. structural - For structural RB 1065 opening 15375 opening TYPE 1794 1928 2122 1928 2122 1928 2122 1431 1065 opening 15375 opening 1794 1928 2122 1928 2122 1928 2122 1431 1065 opening 15375 opening TYPE 1794 1928 2122 1928 2122 1928 2122 1431 Elevation EW.1.3.003 EW.1.3.002 Legal Info ©RDA Consultant Architects. from drawing either This drawing read specialist designers’ drawings All demolition works subject structural engineer. Works covered pre-commencement consent must NOT be carried All specific drawing notes Health Safety "Information REVISIONS NOTES 01 West Elevation 03 Entrance Fold-Out Elevation 04 East Elevation L West Elevation Drawing No. 2242(20)E01 East Elevation Drawing No. 2242(20)E01 South Elevation Drawing No. 2242(20)E02 North Elevation Drawing No. 2242(20)E02 02 Elevations Key Plan - 26/04/22 Record Drawing 1:100 1:100 1:100 A D G M N Q R 05 East Elevation R 1:100 Please
0-2 Project
Programme 8,100m2 Project Assistant Autocad YMCA, Newark Multi-Use Community Facility
Stage 3
4
033

1. First Floor Plan

RIBA
SFG SVP 7.20 Function Hall 5.13 Stair 03 7.24 Balcony Covered external seating area 6.01 Circulation 6.03 Dance Studio 180m Approximate class size: 30 6.30 Roof Terrace 7.01 Lobby Area welcome 5.04 Acc. WC 6.10 Art Studio 74m Max Capacity: 32 students 6.04 Dance Studio Store 6.11 Store 5.40 Balcony Lobby 5.01 Lobby Education Wing Refuge Refuge area VOID Refuge area 7.23 Stair 02 Escape Stair Stair 01 6.31 Stair 04 Stair 05 1.05 Feature Stair 5.03 Corridor 5.02 Corridor 7.22 Fire Corridor 6.02 Circulation First Floor Hospitality Wing Max Capacity: 220 First Floor Media & Studio Wing Max Capacity: 120 Studio by Specialist Sub Contractor, inc. Layout, Specification fitout EW.1.5.015 EW.1.5.017 EW.1.9.018 EW.1.9.019 EW.1.7.024 EW.1.7.025 EW.1.7.026 ED.1.7.029 ED.1.7.030 ED.1.7.031 D.1.5.014 D.1.5.018 D.1.5.019 D.1.6.009 D.1.6.005 D.1.6.001 D.1.6.002 D.1.6.003 D.1.6.004 W.1.5.002 W.1.5.003 W.1.5.005 RL.033 Over W.1.1.002 FS-60 FS-30 FS-60 FS-60 FS-30 FS-30 FS-30 FS-30 FS-30 FS-30 Refuge area EW.1.6.022 EW.1.6.023 5.08 Secure Store 5.5m 5.09 Digital Media Teaching suite Workstations 20 students tutor 5.10 Digital Media Teaching suite 57m 21no. 57m 21no. Workstations students 5.11 Digital Media Teaching suite 3 FS-30 D.1.5.006 5.06 Student Welfare Maximum Capacity >50 Maximum Capacity >50 25 students tutors 6.05 Acc. WC 8.01 Office 112m Max Capacity: no. 8.03 Kitchenette 8.02 Meeting Room D.1.8.001 6no. Hot desks position shown indicatively M&E Consultant 5.30 Plant Room FS-60 5.31 Male WC 5.35 Baby Change 5.41 Stair 06 5.34 Cleaners Cupboard *ICT Review required 5.07 Secure Store 2.9m D.1.5.009 Workstations students tutor 5.12 Teaching Suite Green Room Area 17m South Mezzanine 3.04 General purpose Activity Space 260m Floor Area 15m Clear Floor Ceiling Height Max Occupancy at First Floor Level 41 People Total EW.0.3.002 EW.0.3.003 EW.0.3.004 5.33 Acc. WC 5.32 Female WC 9.02 Stair 07 North Mezzanine D.1.5.021 D.1.5.023 D.1.9.003 D.1.6.006 ED.1.8.026 EW.1.5.035 FS-30 FS-30 5.42 Lift 01 FR-30min 7.12 Bar Bottle Storage 7.04 Female Toilets 7.05 Male Toilets Storage Area for round tables 7.10 Bar Servery 7.08 Circulation 7.11 Bar D.1.7.009 D.1.7.008 D.1.7.002 D.1.7.004 D.1.7.005 D.1.7.006 D.1.7.007 D.1.7.011 D.1.7.012 D.1.7.013 D.1.7.014 7.02 Acc. WC 3.7m 7.07 Cloak Room 2.9m 7.06 Cleaners Store 1.3m 7.13 Re-heat kitchen Fit out by specialist 36.8m FD-30 FD-30 FD-30 FD-30 FS-30 FD-30 FS-30 D.1.7.018 7.09 Circulation D.1.7.003 FS-30 extract riser roof level 5.05 Unisex Toilets Refuge area 5.43 Server Room 9.01 Lobby 5.37 Gender-Neutral WC 5.36 Female WC Stair 08 15 Risers 250 Going 2550 Floor to Floor 9.12 20 people meeting Room 42m2 9.13 14 people meeting Room 27m2 9.17 Unisex WC 2.9m2 9.16 Unisex WC 2.4m2 9.11 Accessible WC 5.25m2 9.15 Unisex WC 2.4m2 9.05 Clinical Room 16m2 9.06 Breakout Space 9.19 Cleaner's Store 9.09 Kitchen 4.8m2 9.10 1-to-1 Room 5.5m2 9.14 people meeting Room 10m2 9.03 Office 9.04 Office 9.07 Breakout Space 9.08 Breakout Space 9.18 Lobby D.1.9.006 D.1.9.005 D.1.9.007 D.1.9.008 D.1.9.012 W.1.9.001 W.1.9.002 W.1.9.004 W.1.9.005 W.1.9.006 FS-30 FS-30 D.1.5.029 4000 2035 opening 5615 1135 opening 665 440 3580 opening 3580 opening 3580 opening 730.3 3580 opening 380 (24)003 S5 (21)S06 4818 7661 4544 (21)S02 (20)E01 (20)E01 (20)E01 (21)S01 (21)S05 G-G (21)S06 280 280 280 (20)E01 North (20)E01 (20)E01 (21)S08 K-K (21)S01B-B (21)S07 L-L 4090 280 280 280 6153 7330 5798 3288 1952 2343 2147 280 4196.7 14A Q CC AA 6 8 14 16 19 20 22 G1 12 10 11 18A 19A 21A 12A O (24)001 S2 (24)001 (21)S09 O-O (24)002 S4 (24)005 (24)006 (24)004 (24)005 S12 (21)S10 P-P Q-Q (20)E01 280 280 M-M(21)S09 23A 5070 3935 4661 (24)001 (24)003 (21)S12 U-U Designers' Risk Assessment 1. RISK OF FALL FROM HEIGHT Proposed voids to be made work-safe temporary structural floor deck edge protection. Design allow permanent floors, edge protection guarding's holes and penetrations. for edge protection. Allow for work out at ground floor level or from levels where possible. 2. RISK OF FALL FROM HEIGHT high level. 3. RISK OF FALL FROM HEIGHT maintenance repair/replacement. cladding works 4. RISK OF FALL FROM HEIGHT Maintenance. Fall arrest system to trained operatives. Access roof maintenance. Ensure that maintenance out only by qualified maintenance Ensure that building manual covers procedures. 5. FIRE DURING CONSTRUCTION escape for operatives (Stairs/Routes) occupants. Access for fire fighting personnel. Temporary fire protection fire spread adjacent properties phase. Design for early installation fire compartments where possible. 6. MANUAL HANDLING/MUSCULO-SKELETAL INJURIES Appropriate access platforms, and mechanical lifting aids that are the design should be used. RaynerDaviesArchitects St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY CHECKED 2242(90)101Rayner Davies Architects. Do not scale this drawing. All dimensions to be checked 26/04/22 Newark & Sherwood Community & Activity First Floor Plan CA CJG Record 01 First Floor Plan 1m 5m 10m 1:100 - 26/04/22 Record Drawing issue Legal Info ©RDA Consultant Architects. Drawing not for construction. from this drawing in either paper digital form. only. All dimensions are given millimeters unless All survey information others. Check all dimensions boundaries confirmed by client solicitors This drawing intended for use by the commissioning not assume any liability to any third party for the This drawing read conjunction with specialist designers’ drawings and specifications. All demolition works subject statutory approval structural engineer. Works covered by pre-commencement conditions consent must NOT be carried out without statutory All specific drawing notes are be read conjunction Health Safety "Information Pack" and "Site Rules". Please note this is not 'As-Built'
Stage 0-2
RIBA Stage 5-7 RIBA Stage 3 RIBA Stage 4
035
3. Internal Construction View 02 2. Internal Construction View 01

Stage 0-2

Acorn Manor, Ellesmere Port Residential Scheme

Within a tightly bound and constrained site at Acorn Manor, we were tasked with maximising site efficiency and producing a design to meet high design quality with contextual sensitivity. Under supervision of the Project Architect, I was responsible for producing a full set of drawings for planning submission.

648m2 Project Assistant Autocad

RIBA
RIBA
RIBA
Information Site Area Involvement Programme Location Plan Roof Plan 199 ROAD 201 33.1m 233 202 200 GG 209 217 POOLTOWN Ordnance Survey, (c) Crown Copyright 2017. All rights reserved. Licence number 100022432 N RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2836(02)00125/05/21 STATUS REVISIONS NOTES Acorn Manor Residential Development Location Plan SGR SGR Preliminary A4 00 Location Plan - 00/00/00 XX First Issue 10m 50m 0 100m 1:1250 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing is intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein.
Stage 4
Stage 5-7 Project
RIBA Stage 3 POOLTOWN ROAD Unit 01 Unit 02 Unit 03 Street Furniture Lamp Post Street Furniture Lamp Post EL: 35.30 EL: 35.26 RL:37.62 RaynerDaviesArchitects St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE CHECKED BY 2836(20)005 A 02/06/21 REVISIONS NOTES Acorn Manor Residential Development Block Plan As Proposed DK SGR Preliminary A2 01 Proposed Roof Plan - 26/05/21 DK First Issue 0 1m 5m 10m 1:100 Legal Info ©RDA Consultant Architects. Drawing not for construction. All dimensions are given millimeters unless otherwise stated. All survey information others. Check dimensions site. Site boundaries confirmed client solicitors with reference title deeds. This drawing intended use by the commissioning client only. RDA do not assume any liability any third party information herein. N A 06/01/21 DK General Amendments

POOLTOWN ROAD

037 Garden Garden Garden 01 02 03 Existing Hedge removed and replanted 1500mm to East Tree T7 to be retained Tree T6 to be retained Tree G1 to be retained Footway Crossing with Dropped Curb where joining existing infrastructure Footway Crossing with Dropped Curb where joining existing infrastructure 02 01
01 02 02 03 03 03 03 03 03 04 04 04 05 05 Existing Tree T8 Sycamore Crown Lifted 06 07 07 07 Street Furniture Lamp Post Street Furniture Lamp Post Low Level Fence Low Level Fence 08 08 08 EL: 35.30 EL: 35.26 RL:37.62 N

RIBA Stage 5-7

RIBA Stage 4

RIBA Stage 3

RIBA Stage 0-2

1. Elevations
02 02 02 01 04 06 07 08 09 10 05 04 06 07 09 08 10 02 02 02 02 02 02 11 01 03 03 03 04 04 04 04 04 04 05 05 05 05 06 06 06 06 06 07 07 12 12 12 12 08 08 09 09 10 10 10 10 10 02 02 02 11 03 03 03 04 07 08 10 03 02 10 02 03 02 13 13 04 07 08 10 10 02 03 01 03 03 Material Key 01 Timber Door 02 UPVC Frame Window 03 Timber Vertical Cladding 04 Brick (Colour Variation 1) 05 Brick (Colour Variation 2) 06 Slate Tile Roof Hip 07 Slate Tile Roof - Main 08 Concrete Step 09 Entrance Canopy Material Tbd 10 UPVC Rain Water Drainage 11 UPVC Frame Sliding Double Doors 12 Timber 225mm Fascia Board 13 UPVC Frame Opaque Bathroom Window 01 02 03 04 01 02 03 04 Key Plan Unit 01 Unit 02 Unit 03 RaynerDaviesArchitects St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2836(20)004 B 29/11/21 STATUS REVISIONS NOTES Acorn Manor Residential Development Proposed Elevations DK SGR Preliminary A2 - 26/05/21 DK First Issue 0 1m 5m 10m 1:100 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 05 Unit 01 Elevation 01 01 Unit 01 Elevation 04 02 Unit 01 Elevation 02 06 Unit 01 Elevation 03 03 Unit 02+03 Elevation 04 04 Unit 02+03 Elevation 02 07 Unit 02+03 Elevation 01 07 Unit 02+03 Elevation 03 A 06/01/21 DK General Amendments B 30/11/21 DK Unit 01 Arrangement Updated
039 2. Street Elevations SITE EXTENT 202 ATHERTON LODGE +38,310 2F FFL +32,910 GF FFL +35,610 1F FFL +38,270 Eaves +40,810 Ridge Unit 01 Unit 02 Unit 03 SITE EXTENT 202 ATHERTON LODGE +38,310 2F FFL +32,910 GF FFL +35,610 1F FFL +38,270 Eaves +40,810 Ridge Unit 03 Unit 02 Unit 01 RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY CHECKED BY 22/02/22 REVISIONS NOTES Acorn Manor Residential Development Street Front and Site Rear Proposed Elevations DK SGR A1 02 Proposed Street Elevation Front - 26/05/21 DK First Issue 1m 5m 10m 1:100 Legal Info ©RDA Consultant Architects. Drawing not for construction. All dimensions are given millimeters unless otherwise stated. 01 Proposed Site Elevation Rear A 01/06/21 DK General Amendments B 30/11/21 DK Unit 01 Arrangement Updated C 16/02/21 DK Scheme Revised D 22/02/21 DK Scheme Revised

RIBA Stage 5-7

RIBA Stage 4

My role in the project involved transforming a set of plans into rendered elevations that effectively communicated the material sensitivity of the proposed extension. I communicated with the local authority to meet the validation requirements of the application.

Site Plan

RIBA Stage 0-2

Project Information Site Area Involvement Programme
Location Plan
123 12 129 LB 29 St Peters House 33 52.6m 132 118 30 28 OUT RISBYGATE 10 St Peter's Hospital 26 137 Play Area Shelter 584400 584400 584425 584425 584450 584450 584475 584475 584500 584500 264350 264350 264375 264375 264400 264400 264425 264425 264450 264450 264475 264475 264500 264500 264525 264525 264550 264550 264575 264575 metres 0 10 20 584391 264342 584391 264587 584519 264587 584519 264342 TL8464 TL8464 TL8464 TL8464 MapServe © Crown copyright 2022 Ordnance Survey 100053143 N - 26/07/22 CA First Issue RaynerDaviesArchitects 2 St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG TITLE DATE BY DWG NO. REV. CHECKED BY 2881(02)00110/11/22 STATUS REVISIONS NOTES St Peter's House Location Plan CA JMG Existing A3 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. All dimensions are given in millimeters unless otherwise stated. 2. All survey information by others. Check all dimensions on site. Site boundaries to be confirmed by client solicitors with reference to title deeds. 3. This drawing intended for use by the commissioning client only. RDA do not assume any liability to any third party for the information herein. 4,125m2 Project Assistant Autocad / Illustrator
Care Home Extension RIBA Stage 3 Emergency vehicles and deliveries 01 02 03 04 05 06 07 08 11 12 13 14 15 16 17 2845 1500 Bin Store 01 02 03 09 22 23 24 25 26 Existing Existing 27 (08)E01 S03 (08)E01 S02 (08)E01 S01 (08)E01 E01 (08)E01 E02 10 18 Vehicle Turning Staff Only Space: Parking to be maintained to suit operations. Note this space will be blocked in by spaces 19 and 20 21 20 Staff 19 Staff Staff 1500 KEY Buildings Brick Pavers Concrete Gravel Existing Soft Landscaping Area Proposed Soft Landscaped Area Concrete Paving Slabs Existing Tree Retained Timber Decking Timber Panel Fence RaynerDaviesArchitects St. Peter's Gate Nottingham NG1 2JG 01159473859 www.rd-architects.co.uk Nottingham Kent JOB TITLE DWG NO. REV. 2881(08)S0120/03/23 STATUS REVISIONS NOTES St. Peters House Bury St Edmunds Proposed Site Plan DEK MJV Planning A2 01 Proposed Site Plan - 20/03/23 DK First Issue 0 1m 5m 10m 20m 1:200 Legal Info 1. ©RDA Consultant Architects. Drawing not for construction. dimensions are given in millimeters unless otherwise stated. survey information by others. Check dimensions site. Site boundaries be confirmed by client solicitors with reference title deeds. This drawing intended use by the commissioning client only. RDA do not assume any liability any third party the information herein. N
St. Peters House, Bury
041

Derby Assembly Rooms

042
Feasibility