Scale Project number Date Drawn by Checked by 11/15/2023 4:18:46 PM A001 COVER SHEET 1 11/15/2023 Devyn Finkelstein Lucky McMahon CRYSTALLINE 2601 Victory Ave Dallas, TX 75219 No. Description Date
Sheet List
Number Sheet
Name
COVER SHEET
SYMBOLS AND ABBREVIATIONS
A004 ACCESSIBILITY PLAN
A005 ACCESSIBILITY PLAN - MEZZANINE
A006 EGRESS PLAN
A007 EGRESS PLAN - MEZZANINE
A101 MAIN FLOOR PLAN
A102 MEZZANINE FLOOR PLAN
A121 FINISH PLAN
A122 FINISH PLAN - MEZZANINE
A131 RECEPTION CALLOUT
A132 OFFICE CALLOUTS
A133 WORK STATIONS CALLOUT
A134 CLIENT PRESENTATION ROOM CALLOUT
A135 WORK CAFE CALLOUT
A136 TRAINING CLASSROOM CALLOUT
A137 MOTHER'S ROOM CALLOUT
A138 WELLNESS ROOM CALLOUT
A139 MATERIAL LAB CALLOUT
A140 WILDCARD SPACE - GYM CALLOUT
A141 HUDDLE ROOM CALLOUTS
A142 PRIVATE PHONE ROOM CALLOUTS
A143 INNOVATION LAB CALLOUT
A144 MEETING ROOM CALLOUT
A151 REFLECTED CEILING PLAN
A152 REFLECTED CEILING PLAN - MEZZANINE
A153 RECEPTION RCP
A154 WORK CAFE RCP
A302 LONGITUDINAL SECTION
A303 SHORT SECTION
A401 ELEVATIONS (1-4)
A402 ELEVATIONS (5-8)
A601 ROOM SCHEDULE
3
GENERAL NOTES SYMBOLS
Room name
150 SF A101
1 SIM 1 A101
SIM
AREA TAG
ELEVATION MARKER
/ 01 A101
TYP
CALLOUT TAG
1i LIGHTING FIXTURE TAG
? MATERIAL TAG
GENERAL ABBREVIATIONS
# NUMBER
& AND
@ AT
GL GLASS
CPT CARPET
CMU CONCRETE MASONRY UNIT
GC GENERAL CONTRACTOR
BM(S) BEAMS
ELEV ELEVATOR
SCHED SCHEDULE
PT PAINT
TERR TERRAZZO
SUSP SUSPENDED
A. GENERAL NOTES APPLY TO ALL SHEETS.
B. DIMENSIONS ARE ACTUAL AND ARE TO FACE OF STUDS, FACE OF CONCRETE WALLS, FACE OF CMU WALLS, FACE OF FRAMES,OR CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE.
C. THE OWNER SHALL FURNISH AND INSTALL THE FOLLOWING ITEMS: 1. FURNITURE, 2. COPY/PRINT/FAX MACHINES, 3. SHRED BINS
D. INCLUDE ALL OWNER-FURNISHED AND INSTALLED ITEMS AND OWNER-FURNISHED AND CONTRACTOR-INSTALLED ITEMS IN THE CONSTRUCTION SCHEDULE, AND SHALL COORDINATE WITH THE OWNER TO ACCOMMODATE THESE ITEMS.
E. COORDINATE ALL MECHANICAL CHASE SIZES WITH THE MECHANICAL CONTRACTOR.
G. ALL PENETRATIONS THROUGH WALLS SHALL BE SEALED WITH PENETRATION FIRE STOPPING MATERIAL AS REQUIRED TO ACHIEVE THE RESPECTIVE FIRE-RESISTANCE RATING AND SMOKE STOPPAGE.
H. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS THE SIZE AND LOCATION OF EQUIPMENT PADS SHOWN ON PLANS.
1i 1'-0" CEILING TAG
1t FLOOR TAG A.F.F.
THK THICK(NESS)
WDW WINDOW
I. FIRE-RESISTANCE-RATED ENCLOSURES AROUND ALL STEEL COLUMNS SHALL BE CONTINUOUS FROM FLOOR TO UNDERSIDE OF FLOOR OR ROOF DECK ABOVE FOR EACH LEVEL.
J. CONSTRUCTION DOCUMENTS ARE COMPLEMENTARY. SEE DRAWING FOR QUANTITIES AND LOCATION OF WORK. SEE SPECIFICATIONS FOR QUALITIES AND CONDITIONS OF WORK.
K. WORK: ALL ASPECTS OF THE WORK AND ITEMS NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO MAKE A COMPLETE WORKING INSTALLATION, SHALL BE INCLUDED AND INDICATED IN THE CONTRACTOR'S BID.
L. GENERAL SHEET NOTES ONLY APPLY TO PARTICULAR DRAWING OR SERIES OF DRAWINGS.
M. NO ASBESTOS OR PCB CONTAINING MATERIALS SHALL BE USED ON THIS PROJECT.
N. DO NOT SCALE DRAWINGS. DIMENSIONS NOTED PREVAIL. NOTIFY ARCHITECT IN CASE OF DISCREPANCY.
O. HORIZONTAL AND VERTICAL DIMENSIONS ARE MINIMUM DIMENSIONS. CLEARANCES ARE GIVEN TO FINISH SURFACES.
SYMBOLS AND ABBREVIATIONS
Project number Date
1
Checked by 1/8" = 1'-0" 11/15/2023 4:18:46 PM A002
11/15/2023
Devyn Finkelstein
Lucky McMahon
CALLOUT HEAD Scale
Drawn by
VICINITY PLAN
WB WHITEBOARD
Sheet
A001
A002
A003 ACCESSIBILITY SCHEDULE
FURNITURE SCHEDULE A605 FURNITURE SCHEDULE 2
LIGHTING SCHEDULE No. Description Date
A602 ROOM SCHEDULE 2 A603 ROOM SCHEDULE
A604
A606
6'9" 6' 3 1/2" 6' 4 3/4" 8'2 3/8" 3' 4 3/4" 8'2 3/8" Scale
Date Drawn
Checked
1/2" = 1'-0" 11/15/2023 4:18:47 PM A003 ACCESSIBILITY SCHEDULE 1 11/15/2023 Author Checker No. Description Date
EXIT
Project number
by
by
PUSH APPROACH
PULL APPROACH
Project number Date
Drawn by Checked by
KEY
5' DIAMETER CLEARANCE
2"
Scale
4'0" 5'
7' - 2" 4'10" 2' - 5"
1/16" = 1'-0" 11/15/2023 4:19:06 PM A004
11/15/2023
Checker No.
ACCESSIBILITY PLAN 1
Author
Description Date
KEY 5' DIAMETER CLEARANCE
2' - 5" 4'10" 7' - 2" 4'0" 5' - 2" 4' - 10" 3'5" SLIDING
Scale
Checked
1/16" = 1'-0" 11/15/2023 4:19:10 PM A005 ACCESSIBILITY PLAN - MEZZANINE 1 11/15/2023
Checker No. Description Date
PULL APPROACH PUSH APPROACH
APPROACH
Project number Date Drawn by
by
Author
WEST TOTAL EGRESS: 153' - 0"
EAST TOTAL EGRESS: 168' - 0"
No. Description Date
Project number Date
Drawn by
Checked by
Author Checker
Scale
1/16" = 1'-0" 11/15/2023 4:19:17 PM
EGRESS PLAN
A006
1 11/15/2023
No. Description Date
Project number Date
Drawn by
Checked by
Author Checker
Scale
MEZZANINE TOTAL EGRESS: 173' - 0"
1/16" = 1'-0" 11/15/2023 4:19:20 PM A007
PLAN - MEZZANINE
11/15/2023
EGRESS
1
UP UP lift 37' - 11 1/8" 5' - 2 3/4" 4' - 3 15/32" 3' - 1 3/4" 6' 4 3/4" 62' - 9 21/32" 18' - 9 1/2" 27' - 0 7/8" 16' - 2 23/32" 8' 5 5/8" 29' - 7" 3' - 8 3/4" 3' - 6" 26' 6" 3' - 6" 26' - 6" OFFICE 1 1 OFFICE 2 2 OFFICE 3 3 OFFICE 4 4 OFFICE 8 8 OFFICE 7 7 OFFICE 6 6 OFFICE 5 5 WORKSTATIONS 9 RECEPTION 10 SAUNA 22 GYM 19 MALE LOCKER ROOM 21 FEMALE LOCKER ROOM 20 CLIENT PRESENTATION ROOM 18 TRAINING CLASSROOM 17 WELLNESS ROOM 16 MOTHER'S ROOM 15 HUDDLE ROOM 1 11 HUDDLE ROOM 2 12 HUDDLE ROOM 3 13 GUEST WORKSTATIONS 14---Scale Project number Date Drawn by Checked by 1/16" = 1'-0" 11/15/2023 4:19:42 PM A101 MAIN FLOOR PLAN 1 11/15/2023 Devyn Finkelstein Lucky McMahon No. Description Date
UP 41' 1" 3' - 10" 2' - 10" 16' - 4 15/32" 29' - 5 19/32" 3'6" 11'5 1/2" 5'7 1/32" 26' - 3 1/2" 5'8 1/32" INNOVATION LAB 31 MATERIAL LIBRARY 30 PHONE ROOM 1 27 PHONE ROOM 2 28 PHONE ROOM 3 29 WORK CAFE 23 HUDDLE ROOM 4 24 MEETING ROOM 1 25 MEETING ROOM 2 26---Scale Project number Date Drawn by Checked by 1/16" = 1'-0" 11/15/2023 4:19:46 PM A102 MEZZANINE FLOOR PLAN 1 11/15/2023 Devyn Finkelstein Lucky McMahon No. Description Date
KEY
No. Description Date
MARBLE/STONE
TERRAZZO
Project number
Date
Drawn by
Author Checker
RUBBER FLOORING LAMINATE WOOD Scale
A121
1/16" = 1'-0" 11/15/2023 4:19:47 PM
CARPET
Checked by
FINISH PLAN 1 11/15/2023
KEY MARBLE/STONE TERRAZZO LAMINATE Scale
number Date Drawn by Checked by 1/16" = 1'-0" 11/15/2023 4:19:49 PM A122 FINISH PLAN - MEZZANINE 1 11/15/2023 Author Checker No. Description Date
Project
UP 5'10 1/8" 5' - 0". 5'6 7/32" 6'8 31/32" RECEPTION 10 Scale
Date
1/4" = 1'-0" 11/15/2023 4:19:49 PM A131 RECEPTION CALLOUT 1 11/15/2023 Devyn Finkelstein Lucky McMahon No. Description Date
Project number
Drawn by Checked by
3'0 21/32" 10' - 9" 4' - 7" OFFICE 5 5 10' 9" 3' - 0 1/32" 3' - 0" OFFICE 2 2 3' - 0" 10' - 9" 3' - 0 15/16" OFFICE 8 8 Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:50 PM A132 OFFICE CALLOUTS 1 11/15/2023 Author Checker No. Description Date
6'
5' - 10 23/32" 6'3 7/32" 6'9" 6'6" 11'5 9/16"
4 31/32"
1"
8 3/32"
15'
4'
8'
3 1/16"
11" WORKSTATIONS 9-Scale Project number Date Drawn by Checked by 1/8" = 1'-0" 11/15/2023 4:19:53 PM A133 WORK STATIONS CALLOUT 1 11/15/2023 Author Checker No. Description Date
8'
2' - 2 1/32" 4' - 2 1/2" 7' - 7 17/32" CLIENT PRESENTATION ROOM 18 Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:53 PM A134 CLIENT PRESENTATION ROOM CALLOUT1 11/15/2023 Author Checker No. Description Date
7' - 4 1/32" 11' - 3 7/16" 3'8 15/32" 4' - 7 9/32" 4' - 9 7/32" 3' 8 3/16" 8'5" WORK CAFE 23-Scale Project number Date Drawn by Checked by 3/16" = 1'-0" 11/15/2023 4:19:54 PM A135 WORK CAFE CALLOUT 1 11/15/2023 Author Checker No. Description Date
5' - 6 5/32" 3'2 1/32" 2' 8 5/32" 5' - 0". TRAINING CLASSROOM 17 Scale
number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:55 PM A136 TRAINING CLASSROOM CALLOUT 1 11/15/2023 Author Checker No. Description Date
Project
13'0 21/32" 6' - 7 1/4" 3'0 13/32" 4' - 3" MOTHER'S ROOM 15 Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:55 PM A137 MOTHER'S ROOM CALLOUT 1 11/15/2023 Author Checker No. Description Date
5' - 1 7/8" 7' - 6 7/8" 14'4 1/32" WELLNESS ROOM 16 Scale
number Date Drawn
Checked by 1/4" = 1'-0" 11/15/2023 4:19:56 PM A138 WELLNESS ROOM CALLOUT 1 11/15/2023 Author Checker No. Description Date
Project
by
9' - 2 1/2" 6' - 2 9/32" 4' 2 9/16" 3'0" 3'0" 3'0" 3' - 0" 3' - 0" 3' - 0" 11'5" 20' 4 3/8" MATERIAL LIBRARY 30 Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:56 PM A139 MATERIAL LAB CALLOUT 1 11/15/2023 Author Checker No. Description Date
3'11 5/16" 5'5" 4'1 1/16" 5'4 13/16" 6'11 1/8" 13' - 7 5/32" 5' - 2 9/32" 7' - 5 5/8" 9'4 5/8" 8'6 3/4" 135.00° 135.00° 9'7 11/32" GYM 19 MALE LOCKER ROOM 21 FEMALE LOCKER ROOM 20 SAUNA 22 Scale Project number Date Drawn by Checked by 1/8" = 1'-0" 11/15/2023 4:19:56 PM A140 WILDCARD SPACE - GYM CALLOUT 1 11/15/2023 Author Checker No. Description Date
4' - 7 1/16" 4' 8 7/16" 4' - 7 1/16" 4' - 8 7/16" 4' - 7 1/16" 4' - 8 7/16" 1'11 25/32" 8'1 1/8" 7' - 0" 7' - 0" Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:56 PM A141 HUDDLE ROOM CALLOUTS 1 11/15/2023 Author Checker
board walls
No. Description Date
white
glass walls
6' 1 13/32" 6' - 7 31/32" 5' - 8 1/32" Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:57 PM A142 PRIVATE PHONE ROOM CALLOUTS 1 11/15/2023 Author Checker No. Description Date
3'1 3/32" 5' - 10 7/32" 2'1 7/32" 7' - 0 3/8" 21' - 1 9/32" 8'0 1/2" Scale Project number Date Drawn by Checked by 1/4" = 1'-0" 11/15/2023 4:19:57 PM A143 INNOVATION LAB CALLOUT 1 11/15/2023 Author Checker No. Description Date
A
NOTES
A. THIS BOARD IS A WHITEBOARD WALL
5' 8 5/32" 12' 2" 11'7 1/16" 14'6 9/16" MEETING ROOM 2 26 Scale
Date
1/4" = 1'-0" 11/15/2023 4:19:57 PM A144
1 11/15/2023 Author Checker
Project number
Drawn by Checked by
MEETING ROOM CALLOUT
No. Description Date
0' 9 25/32"
4' - 5"
6'7 1/16" 5'4 9/32" 0' - 8 3/32"
4'0'5" 9 25/32"
1'5" 1'5" 1'5" 3'6"
45.00°
13' - 2"
13' - 2" 1' 7 7/16"
0'
7" 1'7" 1'7" 1'7" 3'6"
6" 3'6"
45.00°
45.00° 45.00° 45.00°
59' 5 11/16"
0' - 5"
20'3 5/8" 19'10 17/32" 10' - 10 11/32"
5'2 13/16"
2'0 15/16"
3' - 5 7/8"
2' - 7 3/32"
2'3 29/32"
3' - 0 7/16"
12'10 31/32" 12'11 13/32" 0'10 25/32"
0'5 11/16" 0' - 10 7/8"
A B
0' - 11 1/2"
0'6 11/16"
Description Date
NOTES
A. CUSTOM LIGHTING FIXTURE REQUIRES PLACEMENT PARALLEL TO EACHOTHER
B. SUSP CEILINGS AT 18' - 6" HOLD SQUARE LIGHTING FIXTURES
REFLECTED CEILING PLAN 1
Project number Date Drawn by
A151
62' - 1 21/32" 6' 2 3/16" 3' - 4 3/16" 4' - 3 19/32" 5' - 2 3/8" 38' 0" 18' - 1 1/2" 27' 8 7/8" 16' - 2 23/32" 8' 5 5/8" 29' - 4 19/32" 3' 6" 26' - 4 1/2" 4' 5 1/8" 5' 3 5/8" 15' - 0" 39' - 7 31/32" 14' 2 1/32" 3' - 6" 26' 6" 3' - 6" 26' - 5 3/8" 3' - 6 5/8" 3' - 5" 3' - 5" 11'
4" 0'
6" 2'
1' - 11" 1' - 11" 3' - 1 7/8" 28' 4 17/32" 2'8" 2'8" 9' 4 1/2" 9' 4 1/2" 4'
4'
0'
15/32" 2' 5" 1'
4'
4'
2'
4'
3'
1'
-
-
2"
- 8"
- 4"
- 10
- 5"
0"
- 0"
- 8"
- 5 3/4" 1' - 6 3/32" 1'5"
6 3/4" 0' - 8 11/32" 3'2" 1'9 7/8" 1'6 1/4" 12'
12' - 3"
4'
2' -
11/32" 0'
0' 8 13/32" 1'
4' -
4'
4' 0" 4'
4' - 2 1/2" 4' -
1/4" 1'10 29/32" 1'4 1/8" 1'4 3/8" 1'4 1/8"
- 3"
4'0"
0"
2
8 13/32"
- 0"
0"
- 0"
- 0"
0
45.00°
Scale
Checked
1/16" = 1'-0" 11/15/2023 4:19:59 PM
by
11/15/2023
Author Checker No.
33'3 29/32"
21'10 31/32"
4' - 1 13/32"
3'2 29/32" 3'4 1/16"
26' - 4 1/2" 5'8 1/32" 4' 5 1/8"
15'7 9/32" 3'1" 3'1"
- 4" 4' - 4"
- 7" 5'1" 0'6 17/32"0'8 31/32"
- 7"
7'11 1/8"
7'5 19/32"
6' - 9 27/32"
2'10 1/2" 3'0" 3'4" 2' - 1 11/16"
7' 7 15/16"
- 2 1/2"
11'6 1/2"
3'6"
3' - 11 1/8"
5'8 1/32"
4'5 5/8" 3'3 3/32"
8' - 4 1/32" 8' - 8 7/32"
1' - 6 1/2"
1' 4 1/2" 1' 11"
- 10" 1' - 0" 29' - 6 27/32"
16'
2'
41'
2'
4 21/32"
- 10"
- 1"
11'
4'
21'
21'
Scale Project number Date Drawn by Checked by 1/16" = 1'-0" 11/15/2023 4:20:02 PM A152 REFLECTED CEILING PLANMEZZANINE 1 11/15/2023 Author Checker No. Description Date
No. Description Date
Project number Date
RECEPTION RCP 1 11/15/2023
Drawn by
Checked by
A153
Author Checker
0'6 11/16" 0' - 11 1/2" 0'10 25/32" 0'5 11/16" 0' - 10 7/8" Scale
1/8" = 1'-0" 11/15/2023 4:20:03 PM
3' - 0". 0' - 0 5/32" 0' - 0 3/16" 0'0 1/8"
NOTES
THESE HEXAGONAL FIXTURES ARE MADE OF GLASS
No. Description Date
Project number Date
Drawn by
Checked by
11/15/2023
Author Checker
3'2 29/32" 3'4 1/16" 4' - 1 13/32" 8'3 3/8" 2' 11" 2' - 9" Scale
1/8" = 1'-0" 11/15/2023 4:20:03 PM
WORK CAFE RCP 1
A154
3 17/32"
29'7" 11'11 29/32"
28'2 7/8"
13'9 7/8"
13'1 31/32"
14'7" 15'0"
11'
10 5/16"
12'
3' -
-
18'6" 20'6" 29'2" 35' - 2 31/32" 30' - 8 19/32" 10' - 3 7/16" 39' - 7 31/32" 36' - 1" 27' - 4 19/32" 11' - 11" 11' - 11" 11' 11" 3' - 5 1/2" 3' - 5 1/2"
36' - 2 1/16"
Scale Project number Date Drawn by Checked by 1/16" = 1'-0" 11/15/2023 4:20:06 PM A302 LONGITUDINAL SECTION 1 11/15/2023 Author Checker No. Description Date
3'6" 3'0"
0" 10'
0"
MATERIAL LIBRARY/ BALCONY WORK CAFE/ WORKSTATIONS RECEPTION ELEVATORS
HUDDLE ROOMS VISITOR WORKSTATIONS
MEETING ROOM 2 MATERIAL LAB WORK CAFE
WORKSTATIONS
PRIVATE OFFICE 2
WORKSTATIONS
PRIVATE OFFICE 1
11' - 1 1/2".
11' - 1 1/2"
31' - 5 13/16" 40' - 5 3/32" 8' - 8" 13' - 4"
8' - 7 13/32"
2 A303 A402 Scale
number Date Drawn by Checked by 1/8" = 1'-0" 11/15/2023 4:20:15 PM A303
SECTION 1 11/15/2023 Author Checker No. Description Date
Project
SHORT
NOTES
THIS STRUCTURAL ELEMENT IS MADE OF CUSTOM WELDED STEEL TO CREATE THIS GEOMETRIC DESIGN
NOTES
THIS ELEVATION REFERS DIRECTLY TO ELEVATION 1
15'0" 2'11 7/8" 0'8 19/32" 29'0 1/8" 23' 1" 7' - 2" 9' 0 27/32" 8'0" 4' - 3 1/8"
19' - 6 29/32" 5' - 2" 11'5 13/32" 32.19°
6'10 3/4" 11'10 7/16" 1' - 6 11/16" 1' 6 11/16" 8' - 3 25/32" 2' - 11 1/32" 4' - 2 1/2" Scale Project
Drawn
Checked by 1/8" = 1'-0" 11/15/2023 4:20:26 PM A401 ELEVATIONS (1-4) 1 11/15/2023 Author Checker No. Description Date
number Date
by
12' - 11 11/16" 11' - 2 1/32" 12' 3 9/16" 5'0 15/16" 2'7 19/32" 3' - 0" 8'7 1/2" 9'5 1/2" 3'0" 3'6 1/2" 3' - 2 23/32" 8'0 3/4" 8'6 1/2" 4'0 1/4" 8'7 1/2" 3'0" 3'6" 11'11 29/32" 13'3" 12'11 1/2" 11' - 1 1/4" Scale
Date Drawn
Checked by 1/8" = 1'-0" 11/15/2023 4:20:29 PM A402 ELEVATIONS (5-8) 1 11/15/2023 Author Checker No. Description
Project number
by
Date
ROOM SCHEDULE 1
Project
Drawn by
Checked by
Scale
number Date
11/15/2023 4:20:30 PM A601
11/15/2023
Schedule Number Name Floor Finish Base Finish North Wall East Wall South Wall West Wall Ceiling Finish Comments
OFFICE 1 LAMINATE FLOORING RUBBER FINISHING GLASS PT-7 PT-6 PT-7 PT-7 2 OFFICE 2 LAMINATE FLOORING RUBBER FINISHING GLASS PT-7 PT-6 PT-7 PT-7 3 OFFICE 3 LAMINATE FLOORING RUBBER FINISHING GLASS PT-7 PT-6 PT-7 PT-7 4 OFFICE 4 LAMINATE FLOORING RUBBER FINISHING GLASS PT-7 PT-6 PT-7 PT-7 5 OFFICE 5 LAMINATE FLOORING RUBBER FINISHING PT-6 PT-7 GLASS PT-7 PT-7 6 OFFICE 6 LAMINATE FLOORING RUBBER FINISHING PT-6 PT-7 GLASS PT-7 PT-7 7 OFFICE 7 LAMINATE FLOORING RUBBER FINISHING PT-6 PT-7 GLASS PT-7 PT-7 8 OFFICE 8 LAMINATE FLOORING RUBBER FINISHING PT-6 PT-7 GLASS PT-7 PT-7
WORKSTATIONS BLUE MARBLE FLOORING RUBBER FINISHING GLASS GLASS WDW GLASS PT-6 THERE IS A DOUBLE HIGH CEILING ON THE WORKSTATIONS 10 RECEPTION BLUE MARBLE FLOORING RUBBER FINISHING PATTERN ED WALL GLASS WDW N/A PT-7 11 HUDDLE ROOM 1 BLUE MARBLE FLOORING RUBBER FINISHING WB WALL GLASS WDW GLASS SUSP PT-1
HUDDLE ROOM 2 BLUE MARBLE FLOORING RUBBER FINISHING WB WALL GLASS WDW GLASS SUSP PT-1
HUDDLE ROOM 3 BLUE MARBLE FLOORING RUBBER FINISHING WB WALL GLASS WDW GLASS SUSP PT-1 14 GUEST WORKSTATIONS BLUE MARBLE FLOORING RUBBER FINISHING N/A GLASS WDW PT-5 PT-1 15 MOTHER'S ROOM CARPET FLOORING RUBBER FINISHING PT-2 PT-7 PT-7 PT-7 PT-3 PAINT LEGEND No. Description Date
Author Checker Room
1
9
12
13
17
18
19
Room Schedule Number Name Floor Finish Base Finish North Wall East Wall South Wall West Wall Ceiling Finish Comments
WELLNESS ROOM CARPET FLOORING RUBBER FINISHING PT-6 PT-7 PT-7 PT-7 PT-5
16
TRAINING CLASSROOM TERRAZZO FLOORING RUBBER FINISHING PT-3 PT-7 PT-7 PT-1 PT-7 THIS ROOM
CONTAINS TWO ANGLED WALLS ON EITHER SIDE OF THE EAST WALL AND MATERIALIZING WILL BE LEFT UP TO THE GC
CLIENT PRESENTATION ROOM TERRAZZO FLOORING RUBBER FINISHING PT-5 PT-7 PT-7 PT-6 PT-7 THIS ROOM
CONTAINS TWO ANGLED WALLS ON EITHER SIDE OF THE EAST WALL AND MATERIALIZING WILL BE LEFT UP TO THE GC
GYM RUBBER FLOORING RUBBER FINISHING PT-1 WDW PT-7 PT-5 PT-7
FEMALE LOCKER ROOM TERRAZZO FLOORING RUBBER FINISHING PT-7 PT-7 PT-7 PT-1 PT-7 Scale Project number Date Drawn by Checked by 11/15/2023 4:20:30 PM A602 ROOM SCHEDULE 2 1 11/15/2023 Author Checker PAINT LEGEND No. Description Date
20
ROOM SCHEDULE
Project number
Date
Drawn by
Checked by
Scale
11/15/2023 4:20:30 PM A603
3 1 11/15/2023
Room Schedule Number Name Floor Finish Base Finish North Wall East Wall South Wall West Wall Ceiling Finish Comments 21 MALE LOCKER ROOM TERRAZZO FLOORING RUBBER FINISHING PT-7 PT-7 PT-7 PT-5 PT-7 22 SAUNA WOOD FLOORING RUBBER FINISHING PT-7 PT-7 PT-7 PT-7 WOOD FINISH 23 WORK CAFE BLUE MARBLE FLOORING RUBBER FINISHING N/A PT-3 WDW N/A PT-1 24 HUDDLE ROOM 4 BLUE MARBLE FLOORING RUBBER FINISHING PT-7 PT-2 PT-7 PT-7 PT-1 25 MEETING ROOM 1 BLUE MARBLE FLOORING RUBBER FINISHING PT-7 PT-3 PT-7 PT-7 PT-1 26 MEETING ROOM 2 BLUE MARBLE FLOORING RUBBER FINISHING PT-7 PT-4 PT-7 PT-7 PT-1 27 PHONE ROOM 1 LAMINATE FLOORING RUBBER FINISHING GLASS PT-1 WDW PT-7 PT-7 28 PHONE ROOM 2 LAMINATE FLOORING RUBBER FINISHING GLASS PT-1 WDW PT-7 PT-7 29 PHONE ROOM 3 LAMINATE FLOORING RUBBER FINISHING GLASS GLASS WDW PT-7 PT-7 30 MATERIAL LIBRARY BLUE MARBLE FLOORING RUBBER FINISHING N/A WDW PT-7 PT-7 PT-1 31 INNOVATION LAB TERRAZZO FLOORING RUBBER FINISHING PT-7 WDW GLASS PT-7 PT-1 PAINT LEGEND No. Description Date
Author Checker
Scale Project number Date Drawn by Checked by 11/15/2023 4:20:31 PM A604 FURNITURE SCHEDULE 1 11/15/2023 Devyn Finkelstein Lucky McMahon Furniture Schedule Family Count Manufacturer Type Viccarbe - Aspa - Round Table 2 Viccarbe 0.48"T - 23.62"D High Viccarbe - Aspa - Square Table 4 Viccarbe 0.87"T - 31.50" Low Coalesse_AM_Seating_ConferenceChair_Lox 12 Coalesse 4 Star - Upholstered Back and Seat Steelcase Coalesse - Lagunitas - Table - Personal 9 Steelcase 13D x 24W Steelcase - Migration SE - Desk - Base - Rectangular 54 Steelcase 29D - 58W Steelcase - Migration SE - Desk - Rectangular - T Leg 54 Steelcase 29D x 58W Coalesse_AM_Seating_ConferenceChair_SW_1_5StarBas e 4 Coalesse Aluminium Caster AMQ_Seating_GuestChair_Bixby_Multipurpose_Armless 40 Steelcase Caster West Elm Work Collection - Lucas Wire Chair 13 west elm Work Collection Chair Bolia - Zyl Pouf 2 Bolia D50 Furniture_Office-Chairs_Fritz-Hansen_Little-GiraffeT-3211 12 Steelcase Default Coalesse_AM_Seating_LoungeChair_SW_1_Collaborative _Lowback 16 Coalesse Glide No. Description Date
Scale Project number Date Drawn by Checked by 11/15/2023 4:20:31 PM A605 FURNITURE SCHEDULE 2 1 11/15/2023 Devyn Finkelstein Lucky McMahon Furniture Schedule Family Count Manufacturer Type Coalesse_AM_Seating_Stool_LastMinute 8 Coalesse High Steelcase - Architectural Solution - Privacy Wall - Post 2 Steelcase L Post Steelcase Coalesse - Lagunitas - Seating - Chaise - Two Seat 1 Steelcase Low Back Screen - Left Corner Cushion Steelcase - Worktool - SOTO II - Mobile Caddy 55 Steelcase Mobile Caddy Coalesse_AM_Table_Conference_Ballet_Rectangular_XB ase 1 Coalesse Non Folding - 96L x 42W Treadmill 4 Ny märkning Coalesse_AM_Seating_GuestChair_Capa 13 Coalesse Polished Chrome Leg Bolia - Grab - Pouf 1 Bolia Small Steelcase - Seating - SILQ - Stool 12 Steelcase Stool Steelcase - Architectural Solution - Privacy Wall - Post 2 Steelcase T Post Coalesse_AM_Seating_LoungeChair_SwathmoreGrande_ WoodLouverBase 2 Coalesse Three Seat Steelcase - Seating - Think 465 Series - Chair (1) 61 Steelcase Upholstery Back/Adjustable Arm/Caster No. Description Date
LIGHTING SCHEDULE
Project
Scale
number
Date
11/15/2023 4:20:32 PM A606
Drawn by Checked by
1 11/15/2023
Finkelstein Lucky McMahon Lighting Fixture Schedule Type Lamp Count Manufacturer Model 4' x 3" LED 3 Lumenwerx Default - Load Type Catalog 303 - Filament Lamp LED 1 Cooper Lighting 303 2340-03 LED 9 VIBIA HALO 2340-03 Lighting_Other_LumenWerx_Sh ell-Recessed-8 LED 38 Lumenwerx Shell Recessed 8 PENDENT_STRIP_4' T-12 20 RAB Lighting Inc. Strip RIM-MULTIPLE-SQUARE-PEN DANT-2+3+4 LED 3 Lumenwerx Rim Multiple Square Pendan single blue light LED 42 Custom Fixture Pendant single purple light LED 66 Custom Fixture Pendant No. Description Date
Devyn