Georgia 14, July 5, 2017

Page 1

441

59

75

GEORGIA STATE EDITION

Cornella 19

A Supplement to:

Rome 85 27

Athens 441

Atlanta

20

Madison Augusta

85

20

Griffin 1

129

Milledgeville

75

La Grange

Macon

July 5 2017

Vol. XIX • No. 14

301

185 19

®

16

Dublin

Swainsboro Oak Park

Columbus

Statesboro

341 441 16

Lyons Americus

Dorchester

341

Cuthbert

75

Albany

84

Douglas Tifton

82

95

82

Blakely

Pearson

Your Georgia Connection: Rich Olivier, Atlanta, GA • 1-800-409-1479

301

1

82

“The Nation’s Best Read Construction Newspaper… Founded in 1957.”

Savannah

McRae Cordele

27

27 84

Moultrie

19 319

84

Bainbridge

Valdosta Thomasville

Waycross Brunswick 82

1 441

When finished, a water supply project under construction in Atlanta will not only be the largest ever undertaken in Georgia, but provide greater capacity than any other in the United States.

Largest Water Supply Project in Georgia History Under Way

By Lori Tobias

When finished, a water supply project under construction in Atlanta will not only be the largest ever undertaken in Georgia, but provide greater capacity than any other in the United States. It also is the site of a unique drilling technique never before utilized on the east coast. The $300 million project is Atlanta’s effort to provide water for the city during times of drought, an all too frequent condition in the southern city. It involves converting the 400-ft. deep Bellwood rock quarry to a 30-day, 2.4 billion gal. water storage supply facility and connecting it through a 5 mi. tunnel to the Chattahoochee River and the Hemphill Water Treatment Plants. Atlanta will be the only city in the United States with a capability to store 30 days of water, according to a press release from the city of Atlanta. “The unique thing we are doing is called a blind bore,” said Brian Walker, vice president of water and waste of PC

CEG CORRESPONDENT

Construction Company, headquartered in Burlington, Vt. “Typically when you do these pump stations you put your tunnel in and as you are going from the surface down, you dig down, blast out the rock and haul it out. With this blind bore method, we set up the drill rig, drill down 400 feet, and keep increasing the size of drill bit until the hole is the size we need for pumps to go down. “Instead of the risk of blasting and mining out, we can do this all via the blind bore method. Here you are boring in the blind because you are just drilling a hole straight down into the earth. You have to make sure you are plum, straight up and down. Inside the shaft, there is a little pump, if the shaft is not plum, the pump would hit the side of the shaft. It affects the performance of the pump. “We are doing it because of the schedule. Otherwise, we would have had to mine all the way to pump station, then build the shaft, however, with the blind bore operation, we are able to build the tunnel while doing the shaft construc-

tion.” The 5-mi. tunnel to the river and treatment facilities is being built by “Driller Mike,” an $11.6 million tunnel boring machine built by Robbins. The TBM earned its moniker in a city-sponsored contest. It was named after Atlanta rapper and activist Michael “Killer Mike” Render. Work on the tunnel got under way last fall, and is expected to continue through March 2018, the scheduled completion date. “We have our launch pad for our tunnel boring machine in the bottom of the quarry,” Walker said. “We will build the tunnel to the pump station at the quarry site. It will allow the city to pull water from the river and to the quarry and to the treatment plants. They will pull water out and divert it to water plants and treat it and go out to the distribution system. They will keep the quarry full, but use the water gradually so it doesn’t get stagnant. Otherwise it will be there for a see WATER page 2


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Georgia 14, July 5, 2017 by Construction Equipment Guide - Issuu