CCNZ National Awards 2016

Page 35

CONSTRUCTION EXCELLENCE AWARDS 2016 CCNZ / HIREPOOL

CATEGORY 5: Excellence in the maintenance and management of assets

Managing Tauranga’s three waters

D

owner has the operations and maintenance contract for the potable water, wastewater and stormwater assets throughout Tauranga City. This performance-based contract focuses on the mechanical and electrical operations and maintenance of these assets throughout the Tauranga region providing three waters services to over 120,000 residents. Downer secured this contract in 2013. With a locally based team comprising of 37 personnel, Downer undertakes mechanical and electrical maintenance of all water and wastewater treatment plants and pump stations, inspection, monitoring and renewal of over 1200 kilometres of CATEGORY watermain (including backflow testing), 800 kilometres of sewer main and 490 kilometres of stormwater network. In addition to this are meter reading services to over 51,000 residential meters, flushing and maintenance to over 4800 T S I L A hydrants and grounds maintenance services. N I F “From day one, the team endorsed a highly

5

collaborative approach, engaging with Tauranga City Council regularly to ensure a seamless transition throughout the contract’s initial stages,” says Downer. “Over time the collaboration and relationship between council and Downer has strengthened, resulting in the achievement in meeting all KPIs with regards to level of service, value for money and performance.” Downer says its contract management team meets with the council monthly to present a report, and an annual review is held to report on performance throughout the year. The contract allows for four, one-year extensions based on achieving a weighted KPI score of greater than or equal to 92.5 percent. “The first extension was achieved last year and the contract is on track to comfortably achieve an overall KPI score exceeding 97 percent for the 2015/16 contract year. “These scores have been achieved through a focused team, passionate about the delivery of a service for the communities in which they reside. The training and access to national support and systems improvements have all contributed to achieving these outstanding results repeatedly.” l

PROJECT: Tauranga City Water Maintenance Contract. CONTRACTOR: Downer NZ

AUGUST 2016 35


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.