Historic Character Delivery Work Plan (Built Heritage Section)

Page 19

Historic Character Delivery Work Plan (Built Heritage Section)

Appendix A: Record of CLG, IPR and Auckland Council Comments A1. CLG Comments A Mt Eden CLG meeting was held on 8 October to discuss the enabling works and for the CLG to provide comments / feedback on the CEMP and sub-plans, including this HC DWP (Built Heritage Section). No comments were received from the CLG on this DWP.

A2. Independent Peer Review Comments An Independent Peer Review of the draft Historic Character Delivery Work Plan (Built Heritage Section) was undertaken by Jeremy Salmond from Salmond Reed Architects with peer review comments received on 30 October 2019. The comments received are as follows: Section of DWP / condition

Comment

Response

3.1

Correct reference to Table 4.1

Corrected

4.1.1

Spelling- construction

Corrected

4.1.4 Building record strategy

Clarify whether there are no heritage buildings affected, or whether the three buildings listed in Appendix D are listed as being adjacent, although outside the works area

Change made in 4.1.4 and in section 3.1 Clarified that no heritage buildings are directly impacted by the Mt Eden enabling works. The three buildings listed are outside the works area. Building condition surveys recommended for these to provide baseline information.

A3. Auckland Council Comments Mr Dan Windwood, Senior Specialist in Historic Character – Built Heritage, has reviewed and provided comment on the draft Historic Character – Built Heritage DWP as follows (email communication 13 November 2019):

Page 19

| Mt Eden Enabling Works


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Historic Character Delivery Work Plan (Built Heritage Section) by City Rail Link Ltd - Issuu