CRLL Health, Safety, Environmental and Sustainability Report 2020

Page 35

OVERVIEW

Water treatment plant at Mt Eden site

Erosion and sediment control HEALTH & SAFETY

In order to protect surrounding waterways, systems to manage erosion and sediment have been established on all CRL construction sites. This includes soil characteristic assessments, and establishing flocculation and sediment control systems. Water treatment at Link Alliance

The major difference between Link Alliance's WTPs and those on other projects, is that they have been set up so that water, once treated, can be reused on-site. This helps ease the pressure on Auckland's water infrastructure.

Left: Influent - Site water prior to entering WTP Centre: Flocculated - Introducing flocculants Right: Discharged water leaving the WTP

SUSTAINABILITY

Recycled water from the Mt Eden and NAL sites is used for general activities such as soil mixing, cleaning and dust control. To date, no water has been discharged from the NAL site, and in recent months recycled water makes up approximately 20 per cent of Mt Eden's entire water use. At Aotea, the team has now started collecting rainwater from roof areas for reuse. The Link Alliance will continue to ramp up water recycling across all its sites as WTPs are established.

ENVIRONMENT

Six water treatment plants were installed and commissioned across all Link Alliance sites in 2020. Water treatment plants (WTPs) ensure that site rainwater and ground water are free of sediments and any other potential pollutants, before being discharged into the stormwater network.

The systems that control WTPs are also being updated to include online monitoring to automatically adjust pH, measure flows and allow remote access and control.

33


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
CRLL Health, Safety, Environmental and Sustainability Report 2020 by City Rail Link Ltd - Issuu