Construction Noise and Vibration Delivery Work Plan
Appendix E: Consultation Records Communications records are contained in the communication and consultation plan (CCP). Community and Business Liaison Group (CLG) comments on this CNV DWP are recorded in Table E-1, the Independent peer review comments are recorded in Table E-2, and comments from Auckland Council are included in Table E-3. All communications records relating to the two Enabling Works DWPs are attached to those DWPs (refer Section 2.4).
E.1
CLG Comments
Table E-1: CLG review comments
Date
CLG Member
Comment
Response Craig Fitzgerald (MDA)
11/05/2020
Kelvin Norgrove
Just wondered if construction operating hours/days will change to allow catching up on the programme?
Thibaut and I gave a summary of works. Prioritise noisy activities between 7am-7pm Mon - Sat, extending to 10pm where required. Some night works are required to support BOL. Explained the need for these (tunnelling to comply, BOL limited short interval works needed to keep workers safe and train line operating).
Tim Harding
Will you limit work after Addressed above. 7:00pm to low-noise work? What sort of work will it be?
E.2
Independent peer review Comments
Table E-2: Independent peer review comments
DWP Section
Comment
Response
Agile comments on draft (email), dated 29 April 2020 Table 6.2
Clarity sought on extent of night works
We have been advised that night/weekend work will be required only for craning the bridge platforms. List of receivers at risk from night works has been updated and clarified. (Table 5.1)
GIS maps
Errors and comments regarding specific receivers
GIS maps updated to reflect comments, following a meeting to discuss the details
Agile comments on Rev 000 (CA-09), dated 6 July 2020 General 1. Condition 36.3 (e) requires identification of comments on the “The timing of construction activities that are likely to create an adverse noise and vibration DWP effect�. However, descriptions in Appendix C involving timing, relate to overall work hours only. They make no mention of specific times Page 64
| Mt Eden Main Works CNV DWP
Refer our response to question 4 below. Night-works are well defined, and the specific timing of works during the daytime period is less important - unless a particular receiver has daytime sensitivity (as identified in their SSCNVMP).