Minutes or Action Points Community Liaison Group Meeting Contract 2: Air Quality Delivery Work Plan (AQDWP) Contract 2: Contamination Delivery Work Plan (CDWP) Date:
27 October 2015
Time:
5:30pm
Venue:
CRL office, Level 17, 29 Customs Street West
Attendees:
Auckland Transport: Carol Greensmith (CG), Richard Jenkins (RJ), Holly Claeys (HC), Contract 2: Alasdair Mawdsley (AM), Andrew Curtis (AC), Emma Trembath (ET), Bob Mawdsley (BM), Chris Powell (CP), Rachel Purdy (RP), Alan Howard-Smith (AHS) CLG members Dick Ayers (DA), Tim Coffey (TC), Ross Boswell (RB), Peter Bowden (PB), Ben Twigden (BT), Kathy Ross (KR)
Apologies
Tania Loveridge
Topic Air Quality Delivery Work Plan (AQDWP) – Andrew Curtis Plan focuses on the measure of odorous material and dust. Proactive measures will be used to avoid spreading dust. Water will also be controlled to avoid creating sediment. If odorous material is found, immediate action will take place to avoid dispersal. 24/7 solar powered monitoring devices will be set up and will be recorded in real time which can be made available online to the public. The devices will have set low triggers alerting staff if oddities peak and will be handled before it is noticeable to the public. Any weekend incidences will be handled as it happens and will not be left until the Monday. Members of the public can also call the 0800 number for more details. Two dust monitors will be used. Once at the Albert and Customs Sts and one will move along Albert Street with the works. The work in Wellington shows that dust issues are more likely to occur on the surface areas of the construction area. Each monitor will be installed two metres high. On a normal day, we would expect to see anywhere between 20 - 60 micro grams of dust per cubic metre. Natural causes may affect the results such as when pine releases pollen which could peak at 80 micro grams per cubic metre. Monitoring devices will be set up before construction to find the average. The prime source of dust will be from vehicles however, measures will be in place such as having separate trench vehicles and road vehicles. Monitors will show discrepancies before members of the public will know.
CRL - Minutes – CLG Meeting – 27th October 2015 Page 1