Adopted FY2017 2018 Operating & Capital Budget

Page 411

CITY OF SUFFOLK FEE SCHEDULE FISCAL YEAR 2017-2018 Fees Installment Payments Down Payment Interest Finance charge New Account Setup Charge Fire Hydrant Meter Deposit Fire Hydrant Flow Test Fee/Water Model Evaluation Sewer Collection (per 100 cubic feet) Sewer Usage Not Metered (per month 5 ccf) Sewer Connection Charge (installed by city) 4 inch lateral size 6 inch lateral size Greater than 6 inch Sewer Connection Charge (installed by developer) Sewer Availability Charge (residential) Single Family Attached Multi Family (Building with 2 to 4 units), (cost per unit) Attached Multi Family (Building with 5 to 16 units), (cost per unit) Attached Multi Family (Building with 17-24 units), (cost per unit) Attached Multi Family (Building 25+ units), (cost per unit) Mobil Home Park (cost per unit) Sewer Availability Charge (commercial) 5/8 and 3/4 inch meter 1 inch meter 1½ inch meter 2 inch meter 3 inch meter 4 inch meter 6 inch meter 8 inch meter 10 inch meter Manual of Cross Connection Policies Plan sheet copies 24" x 36" (per sheet) Copies (black and white (each) Copies (color) (each)

Fiscal Year 2016-2017

Fiscal Year 2017-2018

250.00 Equal to prime rate - July 1 1 1/2 % or $0.50 minimum per month 10.00 300.00 400.00 6.97 34.85

250.00 Equal to prime rate - July 1 1 1/2 % or $0.50 minimum per month 10.00 300.00 400.00 7.21 36.05

1,800.00 3,000.00 actual cost of installation plus 25% 50.00

1,800.00 3,000.00 actual cost of installation plus 25% 50.00

6,000.00 5,400.00 4,800.00 4,200.00 3,600.00 3,900.00

6,000.00 5,400.00 4,800.00 4,200.00 3,600.00 3,900.00

6,000.00 14,800.00 29,500.00 47,100.00 88,100.00 146,800.00 293,400.00 469,300.00 674,600.00 20.00 2.00 0.20 0.35*

6,000.00 14,800.00 29,500.00 47,100.00 88,100.00 146,800.00 293,400.00 469,300.00 674,600.00 20.00 2.00 0.20 0.35*

Engineering Review

Site Plans Review Engineerying Plans Review Engineering Plans/Site Plans Amendments Plats Pump Station Review/Sewer Model Evaluation Single Family Grinder Pump Review/Inspection Engineering Construction Inspection Sanitary Sewer Facilities

$1,500 Base Fee plus $1.50/if for every foot of public water $1,500 Base Fee plus $1.50/if for every foot of public water & sewer mains beyond the initial 250 if no mains plus pump & sewer mains beyond the initial 250 if no mains plus pump station review fee station review fee $2,500 Base Fee plus $.15/if for every foot of public water $2,500 Base Fee plus $.15/if for every foot of public water & sewer mains plus pump station review fee & sewer mains plus pump station review fee $500/Submittal $500/Submittal 200.00 200.00 $2,000 per station $2,000 per station 300.00 300.00

$1.50/LF for every foot of public sewer installed

$1.50/LF for every foot of public sewer installed

$1.50/LF for every foot of public sewer installed $1,500 plus $1.50 for every foot of public water or sewer mains installed

$1.50/LF for every foot of public sewer installed $1,500 plus $1.50 for every foot of public water or sewer mains installed

3,250.00 8,125.00 16,250.00 26,000.00 48,750.00 81,250.00

3,250.00 8,125.00 16,250.00 26,000.00 48,750.00 81,250.00

1,750.00 4,375.00 8,750.00 14,000.00 26,250.00 43,750.00

1,750.00 4,375.00 8,750.00 14,000.00 26,250.00 43,750.00

Water Transmission/Distribution Facilities Site Plan with Public Utilities Environmental Incentive - Water 5/8 and 3/4 inch meter 1 inch meter 1½ inch meter 2 inch meter 3 inch meter 4 inch meter Environmental Incentive - Sewer 5/8 and 3/4 inch meter 1 inch meter 1½ inch meter 2 inch meter 3 inch meter 4 inch meter

323


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.