City of Lakeland Small Business Development Guide

Page 19

19

Obtaining Building Permits What activities require a building permit?

When you obtain

All businesses must obtain building permits for construction and interior improvements. Examples of work that requires a permit include additions, demolition, interior walls, drop ceilings, new plumbing, new electrical wiring or light fixture installation. Finish work which does not require a permit includes carpeting, painting, and wall papering. If you have questions about whether or not your project needs a permit, please email buildinginspection@lakelandgov.net

a permit for any

How do I apply?

Most inspections

To obtain your building permit(s), you or your contractor must submit plans and pay the fees for plan check with the City’s Building Permitting Division. The types of plans required, and the level of detail, will depend upon the scope of work proposed. When plans are required, it may be advisable to have an experienced design professional assist you. Plans for non-structural alterations, such as door and window replacements, can be drawn by anyone. For projects involving structural modifications, plans and calculations are typically required and must be prepared, signed and sealed by a registered architect or engineer licensed in the State of Florida.

Are there certain permits or approvals which must be acquired before the building permit? Yes. There are instances where you must already have approvals before applying for your building permit. These include: • If you need zoning or a Conditional Use • If you need Architectural Design Review from EITHER the Lakeland Downtown Development Authority or the Historic Preservation Board Design Review Committee • If you intend on applying for a geographic property owner incentive, such as the Façade Improvement Matching Grant, Design Assistance Grant, Signage Grant or Food Service Matching Grant.

Why do I need inspections and how do I request them? The City will require periodic inspections to ensure that your project is being constructed per the approved plans and specifications associated with your building permit. The building inspector acts on your behalf and that of the City to ensure the safety of your business and building. When you obtain a permit for any work the required inspections for that job will be included. Most inspections when called in are completed within 24 hours. Inspections are to be called in on the Interaction Voice Response (IVR) system by the contractor. The Automated Inspection Response System is an Interaction Voice Response (IVR) system for callers to use a touch-tone telephone to schedule, inquire, or cancel inspections. The IVR system is available 7 days a week, 24 hours a day. Inspections request made before 7 AM will be scheduled for the current working day. When you obtain a permit, instructions for IVR use will be included.

work the required inspections for that job will be included. when called in are completed within 24 hours.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
City of Lakeland Small Business Development Guide by City of Lakeland - Issuu