Ives Dairy Road Project Progresses Forward
The City Commission unveils completed renovations at Waterways park, the first of two athletic facilities installing synthetic grass. The newly installed turf makes the multi-use field available year-round, withstanding any harsh weather conditions and eliminates the need to use harmful pesticides and fertilizers. Contact the City Manager or Community Services department for more information.
The Florida Department of Transportation (FDOT) started the intersection project along NE 203 Street/Ives Dairy Road on November 15, 2021 in Miami-Dade County. This is an update on the progress.
The project will increase safety and ease traffic flow through this busy intersection by adding a new westbound bridge over the FEC Railway, adding a pedestrian bridge over the railroad track and adding new turn lanes to the eastbound bridge. Here’s the work currently being perfomed:
• Elevating westbound NE 203 Street over the Florida East Coast Railway (FEC) tracks and West Dixie Highway
• Constructing a pedestrian bridge over the FEC tracks.
• Widening the roadway along southbound US 1 and eastbound NE 203 Street, including the bridge
• Improving drainage along the corridor
• Updating pedestrian ramps, signage, pavement markings and lighting
• Installing a bicycle lane along West Dixie Highway between NE 206 Street and NE 202 Street.
This project will provide additonal eastbound lanes and a dedicated bike lane on west dixie Highway easing the traffic flow for drivers, bicyclists and pedestrians on this busy intersection. This $41.3 million dollar project is expected to be completed by late 2024. For more information, visit the FDOT website.
August 26 - September 8, 2023
For a list of qualifying items, visit floridarevenue.com/DisasterPrep
Consumers can purchase qualifying disaster preparedness supplies exempt from tax during the 2023 Disaster Preparedness Sales Tax Holiday. Passed by the Florida Legislature and signed into law by Gov. Ron DeSantis, the second sales tax holiday exemption will begin Saturday, August 26 and through Friday, September 8.
Follow us on Social Media @cityofaventura
&
News Noteworthy
Receive Emergency Alerts with CodeRED
CodeRED® is an emergency notification system that enables local public safety personnel to notify residents by telephone, text message, email, social media and more of time-sensitive information, emergencies or urgent alerts. The system can reach hundreds of thousands of individuals in minutes to ensure information such as evacuation notices, inclement weather advisories are quickly shared. Aventura, stay informed with emergency updates before, during and after a storm.
What you need to know:
• Alerts are geographically based, and alert only residents in the affected area.
• You may select the types of alerts you wish to receive.
• Alerts are issued by authorized local public safety officials.
• You must register with CodeRED via text by texting the keyword “AlertAventura” to 99411 or by downloading CodeRED mobile from the App Store or Google Play.
Founders Park South Update
Download the CodeRED safety app today to receive emergency alerts directly on your phone. OnSolve.com/CRmobile
IMPORTANT NUMBERS
Mayor Howard S. Weinberg, Esq.
Vice Mayor Amit Bloom
Commissioners
Rachel S. Friedland
Billy Joel
Paul A. Kruss
Dr. Linda Marks
Michael Stern
City Manager Ron Wasson
Assistant City Manager
Bryan Pegues
City Clerk
Ellisa L. Horvath,
MMCCity Attorney Weiss Serota Helfman Cole
& BiermanThe City of Aventura has begun the Founders Park South Facility Improvement Project located at 3105 NE 190th Street on Monday, June 12, 2023. The project is expected to be completed by January of 2024. Improvements will include construction of pickleball courts, tennis courts, gardening planters, lighting and landscaping. Please use caution in the construction area during the duration of the project.
Main Number 305-466-8900
Community Development
305-466-8940
Community Services
305-466-8930
Police (Non-Emergency)
Scan