Recreation & Parks Strategic Plan

Page 70

General Maintenance Recommendations  Establish a set of performance standards for maintenance performance.  Commission the design and implementation of a parks wide wayfinding system.  Prepare a buildings and mechanical systems inspection schedule for all restrooms and structures in the parks.  Commission an architect / engineer to provide a current inspection report on all existing structures on the buildings schedule.  Set up a rotating schedule to have all structures and mechanical systems inspected every three years.  Commission a certified play structure safety inspector to prepare a conditions assessment of all the play structures and establish a reoccurring schedule to repeat the inspection every three years.  Prepare a set of tree pruning standards and thinning practices approved by a certified arborist to be provided to maintenance supervisors.  Fine grade all the baseball infields once every five years to remove the residual buildup and pits that develop on the fields.  Renegotiate or rebid the maintenance contract a minimum of every three years.  Establish maintenance storage areas at every park (sized based on park served). Individual Parks Maintenance Recommendations Shakerag Park  Add sub-drain under playground mulch bed.  Replace wooden benches with a standard metal bench.  Replace wooden trail signs with metal.  Raise the water level of the lake to minimize the width of the steep banks along the edge of the lake.  Establish a three year safety inspection cycle for the play structures.  Establish a three year building conditions inspection schedule for the shelters and restroom facilities.  Skim coat the parking lot every 10 years.  Thin the forested areas every 5 years to improve the health of the forest and promote climax forest growth. Autrey Mill Nature Preserve  Commission a forest and wildlife management study to determine best management practices for the protected natural areas.  Consider adding a full or part time maintenance professional at the park.  Inspect all wooden structures and roofs to set up a 3 year inspection cycle.  Establish a set of uniform standards for paint, roof and materials replacement in the village and passive-use park.  Establish aging mulch pile to be used for periodic replacement of trail mulch.

Page 70 of 135


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Recreation & Parks Strategic Plan by City Johns Creek - Issuu