225 Woodbine

Page 1

225 WOODBINE DR ORANGEBURG, SOUTH CAROLINA 29115 209,000 SF AVAILABLE IMMEDIATELY DISTRIBUTION/WAREHOUSE FACILITY FOR LEASE SUPERIOR LOCATION IN ORANGEBURG JOHN BEAM Associate Vice President +1 843 810 6868 john.beam@bridge-commercial.com HAGOOD MORRISON SIOR, MBA, CRE Executive Vice President +1 843 270 5219 hagood.morrison@bridge-commercial.com HAGOOD S. MORRISON (HAGOOD II) SIOR Vice President +1 843 830 9108 hs.morrison@bridge-commercial.com BROOKS COURTNEY Senior Associate +1 859 327 8749 brooks.courtney@bridge-commercial.com

BUILDING SPECIFICATIONS

BUILDING SIZE: 209,000 SF DIVISIBILITY: 50,000 SF

AVAILABLE: Immediately

TMS: 172-12-06-006

COUNTY: Orangeburg County CLEAR HEIGHT: 12’ - 14’

DRIVE-IN DOORS: 1

BUILDING DIMENSIONS: 864’ x 310’

EMPLOYEE PARKING: 125 Spaces

TRAILER PARKING: 62 Stalls

FLOOR THICKNESS: 4” - 6” Reinforced Concrete

ELECTRIC PROVIDER: Orangeburg City

Wet,

BRIDGE-COMMERCIAL.COM SITE PLAN
SPECS 225 WOODBINE DR
&
DOCK HIGH DOORS: 14
Utility
60’
50’ INTERIOR
30’ x 40’
190’
Fluorescent Metal Halide
OFFICE: Yes MAIN OFFICE: 5,000 SF
Block ROOF: Rubber Membrane TPO
Public
SPRINKLER:
100% LOADING BAY SPACING:
x
BAY SPACING:
TRUCK COURT DEPTH:
LIGHTING:
TRUCKERS
CONSTRUCTION:
8 8 10 14 13 16 16 16 16 15 16 16 VICINITY MAP NOT TO SCALE SHEET BBG 0521005668 LAND AREA 550,638 SQUARE 12.641 ACRES PARKING REGULAR HANDICAP TOTAL STATEMENT OF ENCROACHMENTS 0.8' ASPHALT PROJECTION INTO R/W 5.7' ASPHALT PROJECTION ONTO ADJOINER GENERAL NOTES 1. NO UNDERGROUND UTILITIES ARE SHOWN ON THIS SURVEY, ONLY ABOVE GROUND VISIBLE UTILITIES ARE SHOWN. 2. ALL STATEMENTS WITHIN THE CERTIFICATION, AND OTHER REFERENCES LOCATED ELSEWHERE RELATED TO: UTILITIES, IMPROVEMENTS, STRUCTURES, BUILDINGS, PARTYWALLS, PARKING, SERVITUDES, AND ENCROACHMENTS ARE BASED SOLELY ON ABOVE GROUND, VISIBLE EVIDENCE, ANOTHER SOURCE OF INFORMATION IS SPECIFICALLY REFERENCED HEREON. 3. THIS SURVEY MEETS OR EXCEEDS THE SURVEY STANDARDS/STANDARDS OF CARE AS SECTION 3 OF THE 2021 ALTA/NSPS SURVEY REQUIREMENTS. 4. THE SUBJECT PROPERTY HAS DIRECT ACCESS TO CHARLESTON HWY (US HWY 178) & WOODBINE DEDICATED PUBLIC STREETS OR HIGHWAYS. 5. THERE IS NO VISIBLE EVIDENCE OF CEMETERIES ON THE SUBJECT PROPERTY. 6. THERE IS NO OBSERVABLE EVIDENCE OF EARTH MOVING WORK BUILDING CONSTRUCTION ADDITIONS WITHIN RECENT MONTHS. 7. THE PARCEL CONTAINED IN THE LEGAL DESCRIPTION ARE CONTIGUOUS WITHOUT ANY GAPS, OVERLAPS. 8. BUILDING AREAS SHOWN HEREON ARE FOR THE FOOTPRINT OF THE BUILDING ONLY. 9. NO APPARENT CHANGES IN STREET RIGHT OF WAY LINES EITHER COMPLETED OR PROPOSED, AVAILABLE FROM THE CONTROLLING JURISDICTION. NO OBSERVABLE EVIDENCE OF RECENT SIDEWALK CONSTRUCTION OR REPAIRS. 10. NO ATTEMPT WAS MADE TO DETERMINE WETLANDS OR OTHER ENVIRONMENTAL ISSUES, OTHERWISE NOTED. 11. ORANGEBURG COUNTY TM #0172-12-06-006.000 12. REF PLAT: PB D262-4; PB D346-1 13. ALL DRIVES AND PARKING AREAS ARE ASPHALT PAVING, UNLESS OTHERWISE LABELED. ALTA/NSPS LAND AND TITLE SURVEY PROJECT NAME ORANGEBURG INDUSTRIAL 225 WOODBINE DRIVE ORANGEBURG COUNTY ORANGEBURG, SURVEYED BY: SURVEYOR CERTIFICATE To: GFI Partners, LLC, a Massachusetts Limited Liability Company; Old republic National Title Company; BBG Assessments, LLC: This is to certify that this map or plat and the survey on which it is based were made in accordance 2021 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 6(a), 6(b), 7(a), 7(b)(1), 7(c), 8, 9, 13, 14, Table A thereof. The fieldwork was completed on 7/6/2021. Date of Plat or Map: 7/12/2021 BASISOF BEARINGS THE BASIS COORDINATES.MEASUREMENTSOF ZONING DATA ZONING ITEM REQUIRED PARKING REQUIREMENTS ZONING DESIGNATION ZONING NOT PROVIDED MINIMUM LOT AREA (SQ. FT.) MAX IMPERVIOUS COVERAGE MAX BUILDING HEIGHT BUILDING SETBACKS FRONT SIDE REAR NOTES: CONTACT: REPORT DATE: REPORT #: BUILDING HEIGHT BUILDING 1: 13.5' ± BUILDING AREA BUILDING 1: 208,460 SQ. CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS 225 ROCKY CREEK ROAD, GREENVILLE, SC 29615 PH: (864)271-0496 www.sitedesign-inc.com = DOCK HIGH
= DRIVE IN
DOOR
DOOR

PHOTOS

INTERIOR PHOTOS

225
225 WOODBINE DR
WOODBINE DR

LOCATION MAP

225
DR DRIVE TIME ANALYSIS: TO I-26 EXIT 149: 10 Minutes 6.5 Miles TO I-26 EXIT 169: 20 Minutes 21.4 Miles TO I-26 : 10 Minutes 6.5 Miles ORANGEBURG
WOODBINE
SUMMERVILLE 225 WOODBINE DR EXIT 169 EXIT 149
COLUMBIA
ORANGEBURG EMPLOYERS MAP 225 WOODBINE DR warranties arising out of this document and excludes all liability for loss and damages arising out of this document. 78 301 26 301 78 95 26 95 CHARLESTON COLUMBIA FLORENCE SAVANNAH
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.