TEAM NAME:
SOLAR PANELS MOUNTED ON CANOPY
D
FIRST LIGHT
ADDRESS:
139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND
CONTACT:
ELINUTTALL@GMAIL.COM WWW.FIRSTLIGHTHOUSE.AC.NZ
D CONSULTANTS TENNENT + BROWN ARCHITECTS TIMBER CANOPY DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY
MODULES 1 THROUGH 6 CRANED ONTO FOUNDATION SYSTEM. CLADDING ATTACHED AFTER MODULES ASSEMBLED
C
C CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV
B
B
TIMBER DECKING SYSTEM
MARK
PLANTER BOXES
DATE
DESCRIPTION
LOT NUMBER:
LOT NUMBER
DRAWN BY:
Author
CHECKED BY:
Checker
COPYRIGHT:
SHEET TITLE
3D VIEW A
A
22/02/2011 5:35:52 p.m.
1
3D VIEW
Z103 1
2
3
4
5
6
7
1
2
3
4
5
6
7
GENERAL SHEET NOTES 1.
2.
E
3.
4.
1. ALL PV SYSTEMS WILL BE DESIGNED AND INSTALLED IN FULL COMPLIANCE WITH THE 2008 NATIONAL ELECTRICAL CODE (NEC) AND THE 2010 SD RULES AND REGULATIONS PV MODULES, SOURCE-CIRCUIT COMBINERS, AND UTILITY - INTERACTIVE INVERTERS MUST BE SAFETY CERTIFIED (LISTED) TO THE APPROPRIATE UNDERWRITES LABORATORIES (UL) STANDARD (UL 1741 FOR INVERTERS AND COMBINERS, UL 1703 FOR PV MODULES) AND MUST BE TESTED AND CERTIFIED BY ONE OF THE FOLLOWING US NATIONALLY RECOGNIZED TESTING LABORATORIES (NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTH AMERICA.THE EUROPEAN CE DESIGNATION AND TESTS BYLABORATORIES IN OTHER COUNTRIES ARE NOT ACCEPTABLE. (690.4) DC CIRCUITS FROM THE PV MODULES TO THE DC PV DISCONNECT MUST BE IN METAL CONDUIT (RACEWAYS) WHERE INSIDE THE STRUCTURE. (NEC690.31 (E)) ALL PV STRINGS TO USE MANUFACTURED PROVIDED CABLE.
E
M1
TEAM NAME:
5472
FIRSTLIGHT NZ
ADDRESS:
139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND
CONTACT:
INFO@FIRSTLIGHTHOUSE.AC.NZ WWW.FIRSTLIGHTHOUSE.AC.NZ
M2 D
D CONSULTANTS TENNENT + BROWN ARCHITECTS
M3
DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD
3357
SOUTHERN PERSPECTIVES / SOLAR CITY
3357
M4 M5 2200
M6
C
C CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011
3357
WWW.SOLARDECATHLON.GOV
3357
2200
MODULE 3 WILL BE DISASSEMBLED AND PACKED INTO THE 40 FOOT SHIPPING CONTAINERS
11-01-11
FOR CONSTRUCTION
DATE
DESCRIPTION
3357
CN
2200
B
B 2200
5472
MARK
2272
LOT NUMBER:
LOT NUMBER
DRAWN BY:
AUTHOR
CHECKED BY:
CHECKER
COPYRIGHT:
VICTORIA UNIVERSITY
SHEET TITLE
22/02/2011 5:11:54 p.m.
A
A1 EXPLODED MODULES ISOMETRIC
A
EXPLODED MODULES SCHEMATIC
A-401 1
2
3
4
5
6
7
1
2
3
4
5
6
7
GENERAL SHEET NOTES
E
E C1 A1 G-201 A-211 -
1
C1
C4
D44
A1
A4
B2
A-302
A-302
A-513
A-302
A-302
A-303
2
3
2200
4
2200
3000
6
2200
D D01 A-501
5
FIRSTLIGHT NZ
ADDRESS:
139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND
CONTACT:
INFO@FIRSTLIGHTHOUSE.AC.NZ WWW.FIRSTLIGHTHOUSE.AC.NZ
7
2200
D30 A-533
D02 A-501
TEAM NAME:
2200 D03 A-501
D22 A-532
D45 A-513
D CONSULTANTS
836 TENNENT + BROWN ARCHITECTS WI03-4
WI05-5
A
DUNNING THORNTON CONSULTANTS LTD
D04 A-501
DO01-3
LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY
LAUNDRY
C1
770
ID01-4 1442
713 1280
WI01-1
LIVING
C1 A1
M1
M2
895
DINING
STUDY
M3
M4
C1 G-202 A-212
ID02-5 1303
852 1305
895
896
M6
SHED
M5
3418
2732
DO04-6
635
C
DOORS DO03-6 AND DO046 TO BE RESOLVED
A-301
JN05-4
B
UTILITIES
1934
1575
JN06-5
BATHROOM
DO03-6
KITCHEN
BUNK
C1 G-201 A-212
C
S-301
CLIENT SEE DRAWINGS I-110 TO I-523 FOR INTERIOR FINISHING DETAILS
U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV
C
DO02-3
WI02-2
WI04-4
WI06-6
D08 A-511 D31 A-533 D25 A-533
D19 A-531
D42 A-531
CN
B
11-01-11
FOR CONSTRUCTION
DATE
DESCRIPTION
B
MARK
LOT NUMBER:
LOT NUMBER
DRAWN BY:
AUTHOR
CHECKED BY:
CHECKER
COPYRIGHT:
VICTORIA UNIVERSITY
SHEET TITLE A1 -
FLOOR PLAN
G-202 A-211 A
A
A1 FLOOR PLAN 14/01/2011 6:33:51 p.m.
1 : 50
A-111 1
2
3
4
5
6
7
1
2
3
4
5
6
7
GENERAL SHEET NOTES 1.
E
7
6
5
2200
4
2200
3
2200
3000
2
E
1
2200
6713
2200 4513
1387 PHOTOVOLTAIC PANELS ON ALUMINIUM SUPPORT STRUCTURE. SUPPORT STRUCTURE CONSTRUCTION DETAILS TO BE CONFIRMED, SEE DRAWINGS E-101 TO E-902 FOR ELECTRICAL DETAILS
1352 SOLAR WATER HEATING PANELS TIMBER CANOPY STRUCTURE. CONSTRUCTION DETAILS TO BE CONFIRMED
4째
75X19MM CEDAR SLATS @100MM CENTRES
OUTDOOR SHOWER
TOP OF PARAPET 2985
GLUE-LAMINATED COLUMNS
D
MAXIMUM ELEVATION OF SITE COMPONENTS FROM HIGHEST GRADE POINT ON SITE MUST NOT EXTEND BEYOND THE SOLAR ENVELOPE. IF A POTENTIAL VIOLATION OF THIS REQUIREMENT EXISTS, CONTACT ARCHITECT PRIOR TO CONSTRUCTION
TEAM NAME:
SOLAR ENVELOPE FOR WASHINGTON SITE SHOWN DASHED
PANELIZED HORIZONTAL SHIPLAP HERMAN PACIFIC CEDAR WEATHERBOARD SYSTEM. SEE DRAWINGS A-591 TO A598 FOR CONSTRUCTION DETAILS
ADDRESS:
139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND
CONTACT:
INFO@FIRSTLIGHTHOUSE.AC.NZ WWW.FIRSTLIGHTHOUSE.AC.NZ
D
DO01-3
CONSULTANTS
GROUND FLOOR 0
WI03-4
WI05-5
FIRSTLIGHT NZ
TENNENT + BROWN ARCHITECTS DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY
GRADE LEVEL -550
C1 NORTH ELEVATION 1 : 50
C
C CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV
1
2
3
4
5
6
7 CN
11-01-11
FOR CONSTRUCTION
DATE
DESCRIPTION
4째 METALCRAFT CORRUGATED PROFILED AWNING. SEE DRAWING A-533 FOR CONSTRUCTION DETAILS B
B
TOP OF PARAPET 2985
MARK
SOLAR ENVELOPE SHOWN DASHED
DO02-3
WI02-2
PANELIZED HORIZONTAL SHIPLAP HERMAN PACIFIC CEDAR WEATHERBOARD SYSTEM. SEE DRAWINGS A591 TO A598 FOR CONSTRUCTION DETAILS
14/01/2011 6:34:03 p.m.
GROUND FLOOR 0 GRADE LEVEL -550
WI06-6
DRAWN BY:
AUTHOR
CHECKED BY:
CHECKER
COPYRIGHT:
VICTORIA UNIVERSITY
ELEVATIONS A
A1 SOUTH ELEVATION 1 : 50
1
LOT NUMBER
SHEET TITLE
EXTERIOR SOLAR SHADING INSTALLED ON ALL SOUTH FACING WINDOWS. CONSTRUCTION DETAILS TO BE CONFIRMED
A
LOT NUMBER: WI04-4
A-211 2
3
4
5
6
7
1
2
3
4
5
6
7
GENERAL SHEET NOTES 1.
C
B
A
MAXIMUM ELEVATION OF SITE COMPONENTS FROM HIGHEST GRADE POINT ON SITE MUST NOT EXTEND BEYOND THE SOLAR ENVELOPE. IF A POTENTIAL VIOLATION OF THIS REQUIREMENT EXISTS, CONTACT ARCHITECT PRIOR TO CONSTRUCTION
E
E
75X19MM CEDAR SLATS @100MM CRS FIXED TO 65X35MM BATTENS. CONSTRUCTED IN PANELIZED SYSTEM FOR ONSITE ASSEMBLY
FIRSTLIGHT NZ
ADDRESS:
139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND
CONTACT:
INFO@FIRSTLIGHTHOUSE.AC.NZ WWW.FIRSTLIGHTHOUSE.AC.NZ
OUTDOOR SHOWER
75X19MM VERTICAL CEDAR SLATS @100MM CRS FIXED TO 65X45MM HORIZONTAL BATTENS D
TEAM NAME:
TOP OF PARAPET 2985
GLUE-LAMINATED COLUMNS
SOLAR ENVELOPE FOR WASHINGTON SITE SHOWN DASHED
METER HOUSING BOXES
D CONSULTANTS TENNENT + BROWN ARCHITECTS
PANELIZED HORIZONTAL SHIPLAP HERMAN PACIFIC CEDAR WEATHERBOARD SYSTEM
DUNNING THORNTON CONSULTANTS LTD
DO04-6
GROUND FLOOR 0 GRADE LEVEL -550
DO03-6
CUSTOM FABRICATED STEEL FOUNDATION SYSTEM. SEE DRAWING S-101 FOR FURTHER DETAILS
LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY
DETAILS FOR DOORS DO03-6 & DO04-6 TO BE CONFIRMED
C1 EAST ELEVATION 1 : 50
C
C CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011
A
B
C
WWW.SOLARDECATHLON.GOV
PHOTOVOLTAIC PANELS ON ALUMINIUM SUPPORT STRUCTURE. SUPPORT STRUCTURE CONSTRUCTION DETAILS TO BE CONFIRMED, SEE DRAWINGS E-101 TO E-902 FOR ELECTRICAL DETAILS
CN
11-01-11
FOR CONSTRUCTION
DATE
DESCRIPTION
TIMBER CANOPY. CONSTRUCTION DETAILS TO BE CONFIRMED 75X19MM CEDAR SLATS @100MM CENTRES
B
B
TOP OF PARAPET 2985
GLUE-LAMINATED COLUMNS
MARK 75X19MM CEDAR SLATS @100MM CENTRES
SOLAR ENVELOPE FOR WASHINGTON SITE SHOWN DASHED WI01-1
PANELIZED HORIZONTAL SHIPLAP HERMAN PACIFIC CEDAR WEATHERBOARD SYSTEM. REFER TO DRAWINGS A591 TO A-598 FOR CONSTRUCTION DETAILS
GROUND FLOOR 0 GRADE LEVEL -550
LOT NUMBER
DRAWN BY:
AUTHOR
CHECKED BY:
CHECKER
COPYRIGHT:
VICTORIA UNIVERSITY
SHEET TITLE
ELEVATIONS
A
14/01/2011 6:34:12 p.m.
LOT NUMBER:
A
A1 WEST ELEVATION
A-212
1 : 50
1
2
3
4
5
6
7