First Light A1 Drawings

Page 1

1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University. Cladding wall battens to be placed over wall structural members, fit blocking where required

E

E

All panel backers to line up with wall battens

E02 A-594

1

2

3

4

5

6

7 TEAM NAME:

D05 A-598

NORTH WEST FACE

REMOVABLE CORNER COVER BOARD SEE A-598 FOR DETAIL

NORTH EAST FACE

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

A D

D

CONSULTANTS STANDARD PANEL CONNECTION

B

C

WEST FACE

WEST FACE

C

CLIENT U.S. DEPARTMENT OF ENERGY

E03

M1

A-595

M2

M4

M5

SOLAR DECATHLON 2011

E04

M6

A-595

www.solardecathlon.gov

CENTRE MODULE OMITTED FOR CLARITY

B

B

MARK ALL CONNECTIONS LOCATED OVER WALL STRUCTURAL MEMBERS

LOCKING PANEL CONNECTION

TIMBER BLOCKING WHERE REQUIRED

DATE

DESCRIPTION

D06 A-598

LOT NUMBER: BL

DRAWN BY:

C

CHECKED BY:

GM, TD

COPYRIGHT:

SOUTH WEST FACE

SOUTH EAST FACE SHEET TITLE:

A

E01

S01

A-593

A-592

CLADDING LAYOUT PLAN A

A-591 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

A

C

Panels are hung from the bottom up with each subsequent panel fitted over the one below

E

PARAPET COVERBOARD SEE A-598 FOR DETAIL

PARAPET FLASHING

PARAPET FLASHING

PARAPET COVERBOARD SEE A-598 FOR DETAIL

E

Northeast face uses the Type 2 wall channel configuration Northwest face uses the Type 1 wall channel configuration See A-596 for panel construction details

2.990 TOP OF PARAPET See A-597 for wall channel details PANEL SERIES 5

PANEL SERIES 7

PANEL P5-SE

D

TEAM NAME:

PANEL P7-SE

PANEL SERIES 4

ROOF STRUCTURE

ROOF STRUCTURE

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

D

CONSULTANTS PANEL SERIES 6 PANEL P4B-SE

PANEL P6A-NE

WALL STRUCTURE

WALL STRUCTURE

PANEL SERIES 3

PANEL SERIES 3

PANEL P3A-NE

PANEL P3B-SE C

C

CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 www.solardecathlon.gov

PANEL SERIES 2

PANEL SERIES 2

PANEL P2-NE

PANEL P2B-SE

B

FLOOR STRUCTURE

B

FLOOR STRUCTURE

PANEL SERIES 1

PANEL SERIES 1 0.000 F.F.L

MARK PANEL P1-SE

PANEL P1-NE

DATE

DESCRIPTION

LOT NUMBER: BL

DRAWN BY: CHECKED BY:

GM, TD

COPYRIGHT: ALUMINIUM WALL CHANNEL TYPE 1

45X35 H3.2 TIMBER CAVITY BATTEN

45X35 H3.2 TIMBER CAVITY BATTEN

ALUMINIUM WALL CHANNEL TYPE 2

-0.550 TOP OF GRADE SHEET TITLE:

PANELS SOUTH EAST FACE

PANELS NORTH EAST FACE

A

A

CLADDING ASSEMBLY SECTION

A-592 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University. Cladding panels designated by panel series number (P1-P7), letter of panels in that series from left to right (A-C) then the building face that the panel is on (NE - Northeast, NW- Northwest, SE - Southeast, SW Southwest, E - East, W - West)

E

E

Southeast & Southwest faces use the Type 1 wall channel configuration see A-597 for details

1

2

1100

1112

4

3

1100

5

1100

1100

7

6

1100

1100

1100

1100

1112 TEAM NAME:

37

342

733

733

733

733

733

266

101

101

266

733

733

733

248

733

733

733

248

733

458

733

342

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

37 2.990 TOP OF PARAPET

342

PANEL SERIES 5 D

D

P5-SW

C5

C5

C5

C5

C5

P5-SE

C5

CONSULTANTS

C5

PANEL SERIES 4

P4A-SW

P4B-SW

P4A-SE

P4C-SE

P4B-SE

PANEL SERIES 3

C1

C1

C1

P3A-SW

C1

L2

P3B-SW

L1

L1

P3A-SE

L2

C1

P3B-SE

C1

C1

C2

L2

C1

P3C-SE

C1

C1

PANEL SERIES 2

C

C

P2A-SW

CENTRE MODULE OMITTED FOR CLARITY

P2B-SW

P2A-SE

CLIENT

P2C-SE

P2B-SE

U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 www.solardecathlon.gov

PANEL SERIES 1 0.000 F.F.L P1-SE

P1-SW

C7

C7

C7

C7

C7

C7

C7

-0.550 TOP OF GRADE

SOUTH WEST FACE

1

TYPE 1 STANDARD WALL CHANNELS SHOWN DOTTED

2

ALL PANEL BACKERS TO LINE UP WITH WALL CHANNELS

B

SOUTH EAST FACE

TYPE 1 LOCKING WALL CHANNELS SHOWN DASHED

TOP WEATHERBOARD REMOVED AT WINDOW EDGE, ALUMINIUM ANGLE REDUCED FROM 425MM TO 300MM IN THIS SECTION

3

4

BOTTOM PANELS NOTCHED AROUND FOUNDATION STRUCTURAL MEMBERS WHERE REQUIRED. EXACT SIZE AND SHAPE TO BE CONFIRMED DURING CONSTRUCTION TOP WEATHERBOARD REMOVED AT WINDOW EDGE, ALUMINIUM ANGLE REDUCED FROM 425MM TO 300MM IN THIS SECTION

5

6

P1-Sw

TOP WEATHERBOARD REMOVED AT WINDOW EDGE, ALUMINIUM ANGLE REDUCED FROM 425MM TO 300MM IN THIS SECTION

7 B

P1-SE

MARK P2A-SW

PA2-SW

P2B-SE

P2A-SE

DATE

DESCRIPTION

P2B-SE LOT NUMBER: BL

DRAWN BY: P3A-SW

PA3-SW

P3B-SE

P3A-SE

CHECKED BY:

P3B-SE

GM, TD

COPYRIGHT:

P4A-SW

PA4-SW

P4B-SE

P4A-SE

P4B-SE SHEET TITLE:

P5-SW A

INDIVIDUAL PANELS

P5-SE LOCKING PANEL BACKER

45X35 H3.2 INTERMEDIATE TIMBER PANEL BACKER

STANDARD PANEL BACKER

A

CLADDING PANEL LAYOUT ELEVATIONS

A-593 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University. Cladding panels designated by panel series number (P1-P7), letter of panels in that series from left to right (A-C) then the building face that the panel is on (NE - Northeast, NW- Northwest, SE - Southeast, SW Southwest, E - East, W - West)

E

E

Northeast face uses the Type 2 wall channel configuration see A-597 for details Northwest face uses the Type 1 wall channel configuration see A-597 for details

7

6

5

1100

1112

1100

4

1100

1100

3

2

1100

1100

1

1100

1100

1112 TEAM NAME:

37

342

733

733

733

733 294

733

733

336

733 294

733

260

107

107

259

733

733

733

733

733

342

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

37

336

2.990 TOP OF PARAPET

PANEL SERIES 7

PANEL SERIES 5

D

D

P7-NE

C10

CONSULTANTS

P5-NW

C10

PANEL SERIES 4 PANEL SERIES 6 P4-NW P6B-NE

P6A-NE

P6C-NE

PANEL SERIES 3

PANEL SERIES 3

C8

C8

P3A-NE

C8

L5

C8

C9

C8

P3B-NE

L5

C8

C9

C8

C8

P3C-NE

L4

L1

C1

C1

P3-NW

C1

C1

C1

C1

C1

PANEL SERIES 2

PANEL SERIES 2

C

C

CLIENT

CENTRE MODULE OMITTED FOR CLARITY

P2-NE

P2-NW

U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011

C4

C4

www.solardecathlon.gov

PANEL SERIES 1

PANEL SERIES 1 0.000 F.F.L P1-NE

P1-NW

-0.550 TOP OF GRADE

NORTH EAST FACE

BOTTOM PANELS NOTCHED AROUND FOUNDATION STRUCTURAL MEMBERS WHERE REQUIRED. EXACT SIZE AND SHAPE TO BE CONFIRMED DURING CONSTRUCTION

TYPE 2 STANDARD WALL CHANNELS SHOWN DOTTED

7

6

TYPE 2 LOCKING WALL CHANNELS SHOWN DASHED

NORTH WEST FACE

TYPE 1 LOCKING WALL CHANNELS SHOWN DASHED

5

4

TYPE 1 STANDARD WALL CHANNELS SHOWN DOTTED

3

2

1

B

B

P1-SW

P1-NW

MARK P4B-NE

P2A-NE

DATE

DESCRIPTION

P2-NW

P4C-NE

LOT NUMBER: BL

DRAWN BY: P3B-NE

P3A-NE

CHECKED BY:

P3-NW

P3C-NE

GM, TD

COPYRIGHT:

P4A-SW

P4-NW SHEET TITLE:

P5-SW A

INDIVIDUAL PANELS

P5-NW

ALL PANEL BACKERS TO LINE UP WITH WALL CHANNELS

STANDARD ALUMINIUM PANEL BACKER

45X35 H3.2 INTERMEDIATE TIMBER PANEL BACKER

LOCKING ALUMINIUM PANEL BACKER

A

CLADDING PANEL LAYOUT ELEVATIONS

A-594 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

A

E

B

C

Cladding panels designated by panel series number (P1-P7), letter of panels in that series from left to right (A-C) then the building face that the panel is on (NE - Northeast, NW- Northwest, SE - Southeast, SW Southwest, E - East, W - West)

E

East & West faces use the Type 1 wall channel configuration see A-597 for details 78

796

601

600

553

670

670

670

679

37 2.990 TOP OF PARAPET

PANEL SERIES 5

C3

B

C

P5-W C3

A TEAM NAME:

C3

PANEL SERIES 4

78

P4-W

705

781

781

781

781

781

627

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

37 2.990 TOP OF PARAPET

D

D

PANEL SERIES 5

CONSULTANTS

PANEL SERIES 3 C5 C1

C1

C1

C1

C1 L3

P3A-W

P5-E

C5

C5

C5

L1 P3B-W PANEL SERIES 4

PANEL SERIES 2 P4B-E

P4A-E

P4C-E

P2-W PANEL SERIES 3 C4

C4

C4

PANEL SERIES 1 0.000 F.F.L

L1

C1

L2

C1

P3A-E

P3B-E

C2

L2

C1 P3C-E

P1-W C

C

PANEL SERIES 2

CLIENT

-0.550 TOP OF GRADE

U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011

WEST FACE

P2B-E

P2A-E

TYPE 1 LOCKING WALL CHANNELS SHOWN DASHED

TYPE 1 STANDARD WALL CHANNELS SHOWN DOTTED

www.solardecathlon.gov

P2C-E

PANEL SERIES 1

A

LOCKING PANEL BACKER

ALL ALUMINIUM PANEL BACKERS TO LINE UP WITH WALL CHANNELS

B

0.000 F.F.L

C C7

C6

P1-E

C7

C7

P5-W

-0.550 TOP OF GRADE

EAST FACE

P4-W

TYPE 1 LOCKING WALL CHANNELS SHOWN DASHED

TYPE 1 STANDARD WALL CHANNELS SHOWN DOTTED

B

B

P3A-W

C

P3B-W

ALL ALUMINIUM PANEL BACKERS TO LINE UP WITH WALL CHANNELS

TOP WEATHERBOARD REMOVED AT WINDOW EDGE, ALUMINIUM ANGLE REDUCED FROM 425MM TO 300MM IN THIS SECTION

P2-W

B

A

TOP WEATHERBOARD REMOVED AT WINDOW EDGE, ALUMINIUM ANGLE REDUCED FROM 425MM TO 300MM IN THIS SECTION

MARK

P1-E

DATE

DESCRIPTION

LOT NUMBER: P1-W

INDIVIDUAL PANELS

P2A-E

P2B-E

BL

DRAWN BY:

P2C-E

CHECKED BY:

45X35 H3.2 INTERMEDIATE TIMBER PANEL BACKER

GM, TD

COPYRIGHT: LOCKING PANEL BACKER

P3A-E

P3B-E

P3C-E

SHEET TITLE: P4A-E

P4B-E

P4C-E

A

A

P5-E

INDIVIDUAL PANELS

CLADDING PANEL LAYOUT ELEVATIONS

45X35 H3.2 INTERMEDIATE TIMBER PANEL BACKER

A-595 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES TOP OF PANEL BACKER TO BE TRIMMED ONSITE DURING PANEL CONSTRUCTION

425MM ALUMINIUM PANEL BACKER

700MM ALUMINIUM PANEL BACKER

700MM ALUMINIUM PANEL BACKER

700MM ALUMINIUM PANEL BACKER

550MM ALUMINIUM PANEL BACKER

550MM ALUMINIUM PANEL BACKER

Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

700MM ALUMINIUM PANEL BACKER

Panels shown with standard panel backer, for locking connections replace relevant angle with equivalent locking panel backer

E

B

B

C

B

C

B

E

There are four different lengths of standard and locking panel backer: - 700mm, 550mm, 425mm, 300mm Each length has a standard cut pattern at top and bottom. See A-598 for details

B

45x35 Full height H3.2 timber panel batten shown dotted

A

Single stainless steel screw fixing into each weatherboard

A

5mm spacing between Aluminium Angle backer and edge of bottom weatherboard

10

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

2 TEAM NAME: 3 50

C

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

25

469 Full height

C

300 Part height

B

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

B

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

A

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

30

25

D

CONSULTANTS

10

B

10

B

D

B

LOCKING PANEL BACKER (UA 3226)

10

OUTLINE OF 300MM ALUMINIUM ANGLE BACKER SHOWN DOTTED

FIRSTLIGHT NZ

PANEL BACKER ANGLE (UA 1103)

ALUMINIUM PANEL BACKERS

B

B WEATHERBOARD TYPE A

629

-HERMAN PACIFIC CP837

90

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

5

27

A

10

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

5

STAINLESS STEEL SCREWS 10MM FROM BOTTOM EDGE OF WEATHERBOARD

C

C

B

10

C

B

588

19

C

C

CLIENT

B

C

U.S. DEPARTMENT OF ENERGY 19

A

SOLAR DECATHLON 2011

729

B

P1-SW P1-SE P1-W P1-NE P1-NW P1-E

www.solardecathlon.gov 748

B

WEATHERBOARD TYPE B -HERMAN PACIFIC CP835

798

788

A B

A 5

A

140

5

PANEL SERIES 1

C

PANEL SERIES 6

B

P6A-NE P6B-NE P6C-NE

27

C

PANEL SERIES 5

B

P4-SW P4A-SE P4B-SE P4-W P4-NW P4A-E P4B-E P4C-E

5

C

B

5

A

19

C LOT NUMBER:

1

5

P3A-SW P3B-SW P3A-SE P3B-SE P3C-SE P3A-W P3B-W P3A-NE P3B-NE P3C-NE P3-NW P3A-E P3B-E P3C-E

CHECKED BY:

PANEL SERIES 4 P4A-SW P4B-SW P4A-SE P4B-SE P4C-SE P4-W P4-NW P4A-E P4B-E P4C-E

3

GM, TD

COPYRIGHT:

PANEL SERIES 7

SHEET TITLE:

P7-NE

A

WEATHERBOARD PROFILES

2

BL

DRAWN BY:

27

A

DESCRIPTION

190

5 P2A-SW P2B-SW P2A-SE P2B-SE P2C-SE P2-W P2-NE P2-NW P2A-E P2B-E P2C-E

DATE

HERMAN PACIFIC - CP836

PANEL SERIES 3

PANEL SERIES 2

MARK

WEATHERBOARD TYPE C

4

5

6

7

CLADDING PANEL DETAILS

A-596


1

2

3

5

4

5

6

7

GENERAL NOTES

5

2

ALUMINIUM ROD (UA 1270) GLUE FIXED TO ALUMINIUM CHANNELS AT INDICATED CENTRES

ALUMINIUM ROD Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University. 50

20

30

14

10

ALUMINIUM ROD (UA 1270) GLUE FIXED TO ALUMINIUM CHANNELS AT INDICATED CENTRES

3

There are two configurations of wall channels; type 1 and type 2. Channels C1 and C8 are the full height versions of the two types. Each subsequent channel is a section of these full height channels.

36

E

E

ALUMINIUM CHANNEL 25 STANDARD WALL CHANNEL (UA 1141)

25 ISOMETRIC EXAMPLE LOCKING WALL CHANNEL (UA 3227)

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

89

88 89

88 89

80

88

88

465

D

615

615

751

CONSULTANTS

46

93

93

PANEL SERIES 6

46

C5

46

51

103

615

465 51

103 1304

51

103

PANEL SERIES 4

TEAM NAME:

CLADDING PANELS SEE A-596 FOR DETAILS

596

D

PANEL SERIES 7

80

88 80 465

545

80

PANEL SERIES 5

88

88

2.990 TOP OF PARAPET

465

465

465

465

82

82

82

82

PANEL SERIES 3

C

249

615

615

3190 2151

77

154

77

PANEL SERIES 2 154

76

153

153

www.solardecathlon.gov

615

366

733

615

3190

249 366

2186 366

2306 1598

76

153

PANEL SERIES 2 153

U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011

3190 615

2186

615

3190

249

C3

CLIENT

1286

1286

42

C

83

83

83

PANEL SERIES 3

83

42

615

615

615

615

615

C10

C9

L3

L5

CLADDING PANELS SEE A-596 FOR DETAILS

865

615 865

615

1153

865

615

615

615

615

B

615

B

LOT NUMBER:

108

108 50 66

L2

50 66

54

50 66

DESCRIPTION

BL

CHECKED BY:

GM, TD

COPYRIGHT: 215

215

215

215

288

215

215

215

ALUMINIUM ROD (UA 1270) GLUE FIXED TO ALUMINIUM CHANNELS AT INDICATED CENTRES

DATE

DRAWN BY:

120

108

PANEL SERIES 1

408

C2

50

50 66

50 66 54

108

54

50 66

0.000 F.F.L

120

108

PANEL SERIES 1

MARK

C1

C4

C6

C7

L1

23

23

23

23

23

23

23

SHEET TITLE:

C8

L4

A

A

-0.550 TOP OF GRADE

TYPE 1 STANDARD CHANNELS

TYPE 1 LOCKING CHANNELS

- SOUTHWEST FACE - SOUTHEAST FACE - NORTHWEST FACE - WEST FACE - EAST FACE

1

TYPE 2 STANDARD CHANNELS

- SOUTHWEST FACE - SOUTHEAST FACE - NORTHWEST FACE - WEST FACE - EAST FACE

2

3

4

CLADDING WALL CHANNELS

TYPE 2 LOCKING CHANNELS

- NORTHEAST FACE

- NORTHEAST FACE

A-597 5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

TIMBER WEATHERBOARD PANEL

The locking connection prevents lateral movement of the wall panel and provides an accurate locator for assembly.

E

50

The standard connection allows for thermal expansion and contraction of the weatherboard panel Parapet coverboard screw fixed to parapet to prevent cladding panel uplift

61

25

MINIMUM CAVITY DEPTH OF 61MM TO ALLOW FOR INTERNAL GUTTER SYSTEM

LOCKING PANEL BACKER UA 3226 FIXED TO WEATHERBOARDS WITH 19MM STAINLESS STEEL SCREWS, SEE A-597 FOR FURTHER DETAILS

E

Corner coverboard screw fixed in place after cladding panels hung FULL HEIGHT DPC STRIP STAPLED BETWEEN PLYWOOD AND ALUMINIUM CHANNEL

TEAM NAME:

50

50

50MM STAINLESS STEEL 6 GAUGE PAN HEAD SCREW WITH 12MM STAINLESS STEEL WASHER FIXED @ 400CRS MAX

9

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

72

68

28

R4 12MM PLYWOOD OUTER LAYER

9

R4

LOCKING WALL CHANNEL UA 3227 WITH ALUMINIUM SOLID ROD UA 1270 INSERTED THROUGH FLANGES AND GLUE FIXED, SEE A-597 FOR REQUIRED CENTRES

35

D

4 6

10

ROUGH SAWN CEDAR COVER BOARD WITH 9MM CEDAR SPACER FIXED TO BACK EDGE

87

31

31

4

CONSULTANTS

ALL CHANNELS FIXED TO WALL STRUCTURE, FIT BLOCKING WHERE REQUIRED

26

35

D

14

C

C

CLIENT U.S. DEPARTMENT OF ENERGY TIMBER WEATHERBOARD PANEL

SOLAR DECATHLON 2011 www.solardecathlon.gov

STANDARD WALL CHANNEL UA 1141 WITH ALUMINIUM SOLID ROD UA 1270 INSERTED THROUGH FLANGES AND GLUE FIXED, SEE A-597 FOR REQUIRED CENTRES

26MM STAINLESS STEEL 6 GAUGE PAN HEAD SCREW WITH 12MM STAINLESS STEEL WASHER FIXED @ 400CRS MAX

FULL HEIGHT DPC STRIP STAPLED BETWEEN TIMBER BATTEN AND ALUMINIUM CHANNEL

19

4

10

12

B

17

4 6

35

35

R4

R4

B

STANDARD PANEL BACKER UA 1103 FIXED TO WEATHERBOARDS WITH 19MM STAINLESS STEEL SCREWS, SEE A-596 FOR FURTHER DETAILS

69MM WIDE ROUGH SAWN CEDAR COVERBOARD SCREW FIXED TO TIMBER BATTEN

32

11

25X35 H3.2 TIMBER BATTEN FIXED TO WALL STRUCTURE

MARK

20

DATE

DESCRIPTION

12MM PLYWOOD OUTER LAYER LOCKING PANEL BACKER ALUMINIUM CHANNEL (UA 3226)

ISOMETRIC EXAMPLE

30X20MM CEDAR TIMBER BATTEN

69

ISOMETRIC EXAMPLE

LOT NUMBER: BL

DRAWN BY:

ALL CHANNELS FIXED TO WALL STRUCTURE, FIT BLOCKING WHERE REQUIRED

CHECKED BY:

GM, TD

COPYRIGHT:

19

28

90MM WIDE ROUGH SAWN CEDAR COVERBOARD SCREW FIXED TO TIMBER BATTEN

29

STANDARD PANEL BACKER ALUMINIUM ANGLE (UA 1103)

STAINLESS STEEL SCREWS @ 400 CRS. FIXED 28MM FROM OUTSIDE CORNER TO MAINTAIN A VERTICAL FIXING LINE

A

SHEET TITLE:

28 90

A

CLADDING COMPONENT DETAILS

A-598 1

2

3

4

5

6

7


1

2

3

4

5

6

7

GENERAL NOTES Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

30000

ACCESS ROAD

ACCESS ROAD

ACCESS ROAD ALTERNATE CRANE LOCATION

E

E

22000 8000

TRUCK 1

MODULE 1

MODULE 2

TRUCK 2 CRANE

TEAM NAME:

20' CONTAINER

20' CONTAINER

CRANE

20' CONTAINER

20' CONTAINER

M1

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

M2

D

D

CONSULTANTS

20' CONTAINER DELIVERED TO SITE SITE SETUP SITE SURVEY FOUNDATION PADS LAID

FOUNDATION STRUCTURE ASSEMBLED AND CHECKED CRANE SETUP

DECATHLETE WAY

MODULE 1 CRANED INTO PLACE AND FIXED TO FOUNDATION STRUCTURE MODULE 2 CRANED INTO PLACE\HAND WINCHED INTO MODULE 1 AND SECURED

DECATHLETE WAY

DECATHLETE WAY

N C

C

CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 www.solardecathlon.gov ACCESS ROAD

MODULE 3

ACCESS ROAD

MODULE 4

TRUCK 3

MODULE 5

ACCESS ROAD

MODULE 6

TRUCK 4

40' CONTAINER

CRANE

TRUCK 5

CRANE

CRANE 40' CONTAINER

M1

M2

M3

M4

PV PANELS & SUBSTRUCTURE

20' CONTAINER

20' CONTAINER

B

20' CONTAINER

B

M1

M2

M3

M4

M5

CANOPY COMPONENTS

MARK

M6

M1

M2

M3

M4

M5

DATE

DESCRIPTION

LOT NUMBER:

M6

DRAWN BY:

BL

CHECKED BY:

GM, TD

CLADDING

COPYRIGHT:

DECKING SHEET TITLE:

MODULE 3 CRANED INTO PLACE\HAND WINCHED INTO MODULE 2 AND SECURED MODULE 4 CRANED INTO PLACE\HAND WINCHED INTO MODULE 3 AND SECURED

A

MODULE 5 CRANED INTO PLACE\HAND WINCHED INTO MODULE 4 AND SECURED MODULE 6 CRANED INTO PLACE\HAND WINCHED INTO MODULE 5 AND SECURED MODULE JOINS WEATHERPROOFED

DECATHLETE WAY

ASSEMBLY SEQUENCE

40' CONTAINER ARRIVES ONSITE AND CONTENTS UNLOADED TO DESIGNATED AREAS 40' CONTAINER LEAVES SITE INTER-MODULE CONNECTIONS MADE

DECATHLETE WAY

A

DECATHLETE WAY

O-101 1

2

3

4

5

6

7


1

2

3

4

6

5

7

GENERAL NOTES

ACCESS ROAD

ACCESS ROAD

Do not scale of drawings. All dimensions to be checked onsite. All drawings to be read in conjunction with relevant specifications and supplementary documents. The work executed from, and all information contained within the drawings, specifications and other documents falls under copyright law, and remains the property of Victoria University.

ACCESS ROAD

E

E

8000

20' CONTAINER

M1

CANOPY COMPONENTS

M2

M3

M5

M4

M6

PV PANELS & SUBSTRUCTURE

M1

M2

20' CONTAINER

PV PANELS & SUBSTRUCTURE

20' CONTAINER

20' CONTAINER

CRANE

TRUCK 1

M3

M4

M5

TEAM NAME:

M6

M1

M2

M3

M5

M4

FIRSTLIGHT NZ

ADDRESS:

139 VIVIAN STREET TE ARO, WELLINGTON NEW ZEALAND

CONTACT:

www.firstlighthouse.ac.nz info@firstlighthouse.ac.nz

M6

D

D

CLADDING

CONSULTANTS

DECKING

DECKING

EXTERIOR CLADDING INSTALLED CANOPY STRUCTURE PART ASSEMBLED ON GROUND AND CRANED INTO PLACE

PV SUBSTRUCTURE AND PANELS INSTALLED ON CANOPY CRANE LEAVES SITE DECKING FOUNDATION PADS LAID

DECATHLETE WAY

DECKING AND LANDSCAPING INSTALLED SITE CLEANUP 20' CONTAINER LEAVES SITE

DECATHLETE WAY

DECATHLETE WAY

N C

C

CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 www.solardecathlon.gov

CONSTRUCTION EQUIPMENT 40' CONTAINER

MODULE 5

EQUIPMENT TYPE

AMOUNT

NOTES

PPE - SAFETY BOOTS, SAFETY GLASSES, EAR MUFFS, HARD HATS,GLOVES, HIGH VIABILITY VESTS, SAFETY HARNESSES

1 UNIT PER PERSON + SPARES INCASE OF DAMAGE (EXCEPT HARNESSES)

EXACT HARNESS QUANTITIES TO BE CONFIRMED

SITE EQUIPMENT - LIGHTING, SAFETY SIGNAGE, SAFETY BARRIERS, SHELTER

AS REQUIRED

EXACT TYPES AND QUANTITIES TO BE CONFIRMED

TOOLS - POWER TOOLS, HAND TOOLS

AS REQUIRED

EXACT TYPES AND QUANTITIES TO BE CONFIRMED

ELECTRICAL GENERATOR AND SPILL TRAYS

MINIMUM 2 GENERATORS AND ASSOCIATED SPILL TRAYS

EXACT SIZE AND TYPE OF GENERATORS TO BE CONFIRMED

TRUCK WITH MOUNTED CRANE FOR 20' CONTAINER (TRUCK 1)

1

TRUCK MUST HAVE ADEQUATE HIAB SYSTEM TO ENABLE CONTAINER PLACEMENT

SIDE LOADER TRUCK FOR 40' CONTAINER (TRUCK 5)

1

THE USE OF THE SIDE LOADER TRUCK OR ONSITE CRANE TO LIFT THE 40' CONTAINER INTO PLACE IS UNDER INVESTIGATION

SEMI TRAILER FLATBED TRUCKS (TRUCKS 2, 3 & 4)

3

EXACT MODEL\SIZE OF TRUCK AND TRAILER TO BE CONFIRMED, EACH TRUCK MUST BE ABLE TO CARRY 2 MODULES

MOBILE SITE CRANE - MINIMUM 80 METRIC TONNE (CRANE LOCATION 1) MINIMUM 100 METRIC TONNE (ALTERNATE CRANE LOCATION)

1

EXACT CRANE SIZE TO BE CONFIRMED. CRANE SIZE WILL ALTER DEPENDING ON MODULE/CONTAINER WEIGHT AND CRANE PLACEMENT

20 FOOT CONTAINER

1

THIS CONTAINER WILL BE THE FIRST PIECE OF EQUIPMENT ONSITE AND WILL CARRY PPE, SITE EQUIPMENT, TOOLS AND FOUNDATIONS

1

THIS CONTAINER WILL HOUSE CLADDING & CANOPY SYSTEMS, PV SYSTEMS, DECK & LANDSCAPING SYSTEM, VARIOUS OTHER EQUIPMENT

TRUCK 5

MODULE 6

TRUCK 4

B

B

MODULE 3

MODULE 4

TRUCK 3

MARK

DATE

DESCRIPTION

LOT NUMBER: BL

DRAWN BY: CHECKED BY:

GM, TD

COPYRIGHT:

MODULE 1

MODULE 2

40 FOOT CONTAINER

TRUCK 2

SHEET TITLE:

A

A

20' CONTAINER

TRUCK 1

ASSEMBLY SEQUENCE & SCHEDULES

O-102 1

2

3

4

5

6

7


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.