ELECTRIC TRANSMISSION & DISTRIBUTION

Page 1

ELECTRIC TRANSMISSION & DISTRIBUTION

BOND Civil & Utility is a premier full-service construction management and self-performing general contractor working within the power, energy and infrastructure markets.

As a premier, full-service, self-performing civil and utility contractor we are focused on ELECTRICAL SUBSTATIONS, HIGH VOLTAGE UNDERGROUND TRANSMISSION SYSTEMS, HIGH & LOW VOLTAGE UNDERGROUND DISTRIBUTION SYSTEMS, SUBSTATION & INFRASTRUCTURE STORM HARDENING AND BALLISTIC FENCING.

BOND Civil & Utility ensures successful project outcomes that are safe, reliable and cost effective.

BOND Civil & Utility is committed to creating intelligently designed infrastructure that ensures reliability and safety, while providing minimal disruption to daily lives. As a leading fullservice, self-performing civil & utility contractor since 1907, we’ve delivered thousands of infrastructure projects for clients in education, healthcare, district energy & power generation, public authority and corporate markets. Our ability to strategically think through complex work approaches and our commitment to safety & quality, are just two of the reasons why customers depend on us.

THE BOND FAMILY OF COMPANIES

TIM PEER, PE VP, DISTRICT ENERGY PAUL JAMES SVP, RISK MANAGEMENT & GENERAL COUNSEL BOB MISCHLER VP OPERATIONS, EASTERN NEW ENGLAND DAN RAMOS VP OPERATIONS, WESTERN NEW ENGLAND MIKE WALSH, LEED AP VP CHRIS FOGG, CM-BIM, CM-LEAN VP, INTEGRATED SERVICES JAMES DINARDI, CCIFP CHIEF FINANCIAL OFFICER
BOND Building Construction, Inc. BOND-BUILDING.COM BOND Brothers, Inc. BONDBROTHERS.COM
Healthcare & Life Sciences Education District Energy
FRANK HAYES PRESIDENT
MARKETS:
TONY BOND CHIEF EXECUTIVE OFFICER & PRESIDENT RICH SMALL CHIEF FINANCIAL OFFICER KANE CUDDY PRESIDENT CHRIS DECKER SENIOR VP, NEW ENGLAND DAN FOPPIANO VP, NEW YORK/ NEW JERSEY SCOTT CHURCHILL VP, SALES AND REVENUE STRATEGY
Inc. BONDBROTHERS.COM
KRISTAN KOCH CHIEF FINANCIAL OFFICER
Civil Infrastructure Electric Transmission & Distribution Oil & Gas Power Generation Commercial HVAC Water & Wastewater Industrial
BOND Civil & Utility Construction, Inc. BOND-CIVILUTILITY.COM STACEY DILLON VP, OF MECHANICAL VANESSA BROWN CHIEF HUMAN RESOURCES OFFICER AARON GOVONI VP, CLIENT STRATEGY AL WATSON Vice President, Project Management, NE DAN FOPPIANO Vice President, NYC/NJ MIKE MOORE Vice President, Field Operations , NE
OUR DEDICATED ELECTRIC TRANSMISSION
CHRIS PASQUALICHIO Field Operations Manager, NYC

direct buried 115kv transmission lines at nrg middletown

middletown, ct

power plant

casestudies

EQUINOR Empire Wind 1 Project contract value

$130 MILLION 2025 estimated completion

BOND Civil & Utility Construction, along with GE Renewable Energy’s Grid Solutions, has been awarded the EPC contract to supply a state-of-the-art digital onshore substation for Empire Wind 1, one of New York’s first offshore wind farm projects. New York is on a path to achieve its mandated goal of a zeroemission electricity sector by 2040, including 70 percent renewable energy generation by 2030, and to reach economy wide carbon neutrality.

.
BROOKLYN, NY location

NATIONAL GRID Q-R Downtown Reliability Project

year completed $16

contract value

OWNER

national grid

PROVIDENCE, RI location

BOND Civil & Utility was selected by National Grid to remove 28 existing manhole pairs, install eight new pre-cast manhole pairs and to rebuild one existing manhole pair. In addition, the scope of work included the installation, replacement and realignment of new duct bank sections as needed. BOND Civil & Utility completed this project on time and within schedule.

MILLION 2020

BROOKSVILLE

Starrett City Power Plant

$12 MILLION

contract value

year completed

BROOKLYN, NY location

OWNER brooksville

This project includes the installation of Owner supplied additional power generation equipment and new 5KV switchgear at Spring Creek Towers Power Plant.

2020

CONFIDENTIAL CLIENT

Substation Physical Security Construction

$8.4 MILLION

contract value

2018

year completed

BOND Civil & Utility self-performed perimeter security upgrades to an existing substation for a major local utility company. BOND’s Civil & Utility work included the installation of 277 hybrid precast foundations, 3,200 LF of panelized ballistic fencing consisting of 10’/15’/20’ high fence sections, 2 structural vehicle gates, 3 structural pedestrian gates, electrical infrastructure for security camera installation, trenching excavation and backfill for associated grounding and conduits and perimeter barb wire installation. The fence line installation work revolved heavily around various high voltage overhead line outage across the substation site. The fast track schedule through the winter provided a challenge, as well as the confidentiality and security around the construction site. BOND

NEW ENGLAND location

EVERSOURCE

STA 211 Woburn Substation Civil Construction

$2.0 MILLION

contract value

2017

year completed

BOND Civil & Utility was hired to provide civil and below grade electrical construction services to support the installation of a new 345 kV gas-insulated bus, a 345 – 115 kV autotransformer and the associated Trenwa trench at Eversource STA 211 in Woburn, MA.

BOND’s Civil & Utility preconstruction effort included a review of methods to optimize the construction schedule. One of the major engineered solutions included the installation of the pre-cast sound wall versus the proposed cast-in-place wall, which resulted in significant cost savings and shortened the construction schedule.

OWNER eversource WOBURN, MA location

PEABODY MUNICIPAL LIGHT AND POWER

Ipswich River Substation

$3.11

contract value

year completed

CLIENT state electric

MILLION 2019

PEABODY, MA location

BOND Civil & Utility was selected by State Electric to install the new Ipswich River Substation. The scope of work included, the removal of the existing Ipswich River Substation; the installation of 23 kV Supply Lines and Distribution feeders; the installation of a new 23 kV distribution feeder located at the existing Waters River Substation; the replacement of the 23 kV relay and control system at Waters River Substation; minor modifications to the protection system at the Warren Street Switching Station; and the installation of fiber optic cable equipment from the Warren Street offices to Ipswich River Substation.

CON EDISON

Queensboro Bridge, 69kV Feeder Riser Pipe Enhancement

$2.0 MILLION

contract value

2018

year completed

NEW YORK, NY location

As part of a proactive program to reduce nitrogen gas leaks and increase the availability and reliability of transmission facilities, BOND Civil & Utility installed a composite carbon fiber encapsulation of Queensboro Bridge 69kV Transmission Riser Pipes. The scope included the reinforcement of composite carbon fiber to mitigate existing corrosion and serve as a secondary pressure boundary of six riser 8-5/8” diameter pipes of the Queensboro Bridge Queens side for a cumulative length 825 linear feet. The composite reinforcement system was coated with a protective epoxy system after installation to protect the carbon fiber composite from UV light, impact, and abrasion.

EVERSOURCE ENERGY

Carver Substation 726

$2.1 MILLION

contract value

2013

year completed

BOND Civil & Utility performed significant improvements to Station 726, a critical component of the NSTAR Lower SEMA 345 kV Transmission Project. To improve the adequacy and reliability of the power supply to the southeast region of Massachusetts, the project included the following: expansion to the existing substation (Carver); work inside an existing rigid-bus crossover station; construction of an underground crossing of the R/W with 2 overhead-to-underground transition stations; expansion of an existing switching station and construction of a new 345 kV to 115 kV substation.

CARVER, MA location

REALITY CAPTURE | VIRTUAL DESIGN & CONSTRUCTION

INTEGRATED SERVICES START WITH THE END IN MIND.

BOND’s Civil & Utility Integrated Services model is a collaborative approach that combines the latest technology innovations with the brightest teams to manage a project’s entire life-cycle.

Site Evaluation

Improved Planning

Enhanced Quality Control

Coordination and Constructability Reviews

Virtual Reviews

Model Code-Required Clearances

Maintenance of Access Zones around Equipment

Clash Detection within Existing Conditions Model

Effectively Track Punch List / Commissioning Items

EVERSOURCE ENERGY

Stamford Reliability Project

$11.6

contract value

year completed

MILLION 2014

BOND Civil & Utility worked with Eversource Energy, formerly Northeast Utilities, to complete the Stamford Reliability Cable Project. The work included furnishing and installing a complete and operable 115 kV cable duct bank system extending approximately 1.5 miles between the Glenbrook Substation on Lincoln Avenue and the South End Substation in Stamford, CT. This project improves the transmission system in the Stamford area supplying customers with reliable electrical power to meet their growing energy needs. It also ensures that the area’s electric grid conforms to national and regional reliability standards.

ENGINEER power engineers STAMFORD, CT location

NATIONAL GRID

Worcester 115kV Cable Project

$7.4 MILLION 2011

contract value

BOND Civil & Utility completed this challenging underground transmission project for Prysmian Power Cable & Systems and National Grid. Existing spare ducts were utilized for the first mile of the project with the remaining 2 miles requiring a new 6-way concrete encased duct bank and splicing vaults. In addition to executing the trenching operation safely along a densely populated business and residential area, there was an extensive amount of ledge removal to attain proper depth. Other major work included a 42” pipe-jacking under the active CSX / MBTA railroad spur line, as well as sidewalk and pavement restoration.

year completed ENGINEER power engineers WORCESTER, MA location

EVERSOURCE ENERGY

Middletown - Norwalk Transmission Line

contract value

year completed

ENGINEER

$194 MILLION 2009

burns & mcdonnell

MIDDLETOWNNORWALK, CT location

BOND Civil & Utility provided self-performing crews supplemented with local subcontractors to meet the scheduled deadline. The scope of work included the installation of 100,000 LF of conduit through 5 communities (Norwalk, Westport, Fairfield, Bridgeport & Milford) and 4,800 LF of conduit in a residential community in Cheshire, CT, the installation of 116 pre-cast splice vaults, 3 river crossings and one 54” pipe-jacking under the Metro North Railroad. Primary challenges included dewatering, traffic control and significant ledge removal. A majority of the work occurred at night on well-traveled areas of Route 1.

CONEDISON

Unionport Horizontal Direction Drill (HDD)

$1.9 MILLION

contract value

2017

year completed

BOND Civil & Utility performed as the general contractor and subcontracted Carson Corporation to complete the 450’ long HDD operation.

BOND Civil & Utility crossed under Westchester Creek to complete the excavation work scope for the installation of 2 pre-cast manholes, backfill and restoration. Carson Corporation completed the reaming and pulling of the 8 HDPE conduits, and Consolidated Edison pulled their own cable from manhole to manhole.

OWNER conedison BRONX, NY location

EVERSOURCE ENERGY

Sudbury to Hudson 115kV Project

$38.5 MILLION CLIENT eversource

estimated completion

contract value

SUDBURY,MA location

BOND Civil & Utility has been chosen by Eversource to install a nine mile (1.5 miles in road and 7.5 miles in ROW) 115kV Transmission Line between the Sudbury and Hudson substations. This upgrade is one of a group of projects by Eversource designed to improve the reliability of the electric system serving the Greater Boston area, both today and in the future.

2024

EVERSOURCE ENERGY

Andrew to Dewar Reliability Project

2026

estimated completion

contract value

$23.3 MILLION CLIENT eversource BOSTON, MA location

To improve the reliability of Boston’s electric system now and into the future, a new 2.1 mile underground 115-kilovolt (kV) transmission line will connect Eversource’s Andrew Square substation to the Dewar Street substation. The project also includes improvements within the existing fence lines of the substations, to further ensure the delivery of safe, reliable power.

Strong ability to strategically think through complex work approaches

Commitment to safety and quality

Highly skilled, permanent workforce

Proactive & innovative work approach

Proven track record of delivering quality projects

Skilled working in challenging conditions such as:

- transmission & distribution raceways

- substations

- live, high voltage facilities

- close proximity to pedestrian & vehicular traffic

BOND’S CIVIL & UTILITY
KEYS TO SUCCESS
BOND-CIVILUTILITY.COM Aaron Govoni Vice President, Client Strategy 617.394.6204 office | 603.219.9471 cell | agovoni@bond-civilutility.com Roderick Fiske Client Executive NYC/NJ, Civil Infrastructure 812.614.6017 cell | rfiske@bond-civilutility.com