
1 minute read
OUR PLANS FOR THE FUTURE
2.30 h
Construction permits obtained for the second bore of the Učka Tunnel
Advertisement

All necessary project documentation for the construction of the second Učka tunnel bore has been ensured. As part of the obtained building permit for the doubling of the tunnel, an environmental impact study was carried out for the section to Matulji.

Technical characteristics of the Učka Tunnel second bore:
Lenght: 5.630,34 m
Width: 7,70 m
Height: 4,8 m
Emergency exits: 5
Our efforts will continue to be aimed at increasing traffic safety, meeting customer satisfaction and maintaining high standards of this valuable infrastructure, the Istrian Y Motorway. Bina Istra Team