Aswath portfolio 23'

Page 1

ASWATH KUMAR. JM

05-01-2001

As a young and passionate architect, I am committed to growth, pushing design boundaries, and delivering exceptional solutions. With strong computer skills, creative thinking, and leadership abilities, I strive for extraordinary results while maintaining a focus on time management and quality.

CONTACT

TELE : 9843894648, 9442235843

EMAIL ID : aswathjmarch@gmail.com

INSTAGRAM : aswath_art

LANGUAGES

English

Sourastra ( Mother Tongue )

Tamil (Native )

Hindi

EDUCATION

KENDRIYA VIDYALAYA TPKM

madurai, Tamilnadu 2007 - 2019

MEENAKSHI SCHOOL OF ARCHITEC-

TURE

chennai, Tamilnadu 2019 - present

EXPERIENCE

WAR ARCHITECTS

workshop for architecture and research

teynampet, chennai. ( 3D visualization )

FREELANCE PROJECTS

Residential Interior and Exterior Designs

Thesis Final year Models

Portrait Pencil, charcoal and illustraion

SOFTWARES

Autocad

Sketchup -Vray

Rhino 7 -Grasshoper

Blender

Lumion

D5

Adobe Illustration

Adobe Photoshop

Adobe Indesign

Adobe Premier Pro

PERSONAL SKILLS

Leadership

Honesty and positivity

Photography

Sketching - portraits

Time management

Architectural rendering

Blender modelling

COMPETITIONS

ARCHMELLO

The Habitat Rethinking student housing.

India 2020

RYTERNNA MODUL

Architectural challenge 2020: vacation house

International 2020

ASI

Design olympiad 2021-22

India 2021

(Selected for Regional Level )

HANGAR TICINUM

A community Hub of the river

International 2021

SRM

Furniture Design

India 2022

INTACH

Heritage Building Documentation

India 2023

(Special Mentioned by juries )

CONTENTS

1
LOW COST HABITAT HANGAR TICINUM - IDROSCAL INTACH SKETCHES,MODEL,ILLUSTRATIONS FREELANCE 2022 2021 2023 2019 - 2023 2019 - 2023
2 3 4 5

1

LOW COST HABITAT

2022

ACADAMICS

WORK TYPE : Complete project

SITE LOCATION : Mount Poonamallee Rd, Porur, Chennai

SITE AREA : 11986 sq.m

Divided the overall site into two half for the accessiblity.

pushed the front area to reduce the noice getting from the fast moving cars.

Spliting the blocks to get internal road, gives an street effect.

6

OBJECTIVE: Create affordable housing with modular construction, featuring activities such as a swimming pool, park, sports area, market, gaming room, home theatre, walking area, and parking.

KEY FEATURES: Modular construction enables flexibility and cost-effectiveness. Ground floor amenities foster community and include recreational spaces, market access, and entertainment options.

Removing the central parts to give visual connectivity and a gather spaces for each blocks.

Lifting the blocks to get natural ventilation and sunlight without disturbing surroundings.

Final and Basic form of the apartment.

7
8 Entrance/Exit Security Room Parking STILTH LEVEL PLANNING Theater Cafe Ludo Indoor games Park Gym 1 B H K 2 B H K 3 B H K M O D U L E 1 M O D U L E 2
9
AND ZONING Transformer Function zone Swimming pool Grocery shop Walking area Basket ball Arcade games STP 2 B H K 2 B H K 3 B H K M O D U L E 2 M O D U L E 3 M O D U L E 1
PLANNING

The Modules are arranged based on Sunlight and wind directions, and Each Floor act as a Modules. The floors are placed on above another in the order of 1,2,3,1,2,3,1......

10 1 2 3 4 5 11 6 7 8 9 10 LEFT ELEVATION
FLOOR MODULE
1ST
2ND FLOOR MODULE
SECTIONAL DETAIL SECTION

The Modules are removed on each floors to get recreational spaces on each floors. Which makes an interactive space on every floor.

11
1.EdgeBeam 2.Wall shoe 4.Sandwitch panel 3.False ceilings 6.Steel Truss 5.Steel Rods 7.Connectors 9.Intermediate Beam 10.Balcony Connector 11.Precast Hollow Flooring Slab 8.Anchor Bolt RIGHT ELEVATION
SECTIONAL
VIEW SECTION
3RD FLOOR MODULE 4TH FLOOR MODULE

2

IDROSCAL HANGAR TICINUM

2021 COMPETITION

WORK TYPE : Visualizer | 3D modelling

TEAM MATES : Ar.Samskrith prabhu , Ar.Shalini

SITE LOCATION : Ticino river, Milan

12

OBJECTIVE: Project aim was to revive an old building and transform it into a vibrant public space. With a focus on historical preservation, we have designed a café inspired by urban street aesthetics. The space will offer a lively atmosphere, functional layout, and a blend of old-world charm with contemporary design elements.

13
14 Zone 1 Zone 2
15 Zone 3 Zone 4

INTACH HERITAGE CONSERVATION

2023 COMPETITION

AWARD : Special Mention | only team awarded in Tamilnadu

WORK TYPE : Team Lead | Presentation | Cad plans | 3d model

SITE LOCATION : Arani, Thiruvanamalai

16
3

OBJECTIVE: The objective of this documentation competition is to promote the preservation and appreciation of old and heritage buildings.

Participants are tasked with documenting these architectural treasures to capture the historical significance, architectural details, and cultural value, aiming to raise awareness about the importance and foster a sense of pride in our cultural heritage.

17
18 0.38 1.15 0.45 1.18 0.45 1.18 0.45 0.50 1.18 2.44 1.50 2.92 3.07 0.67 0.50 3.34 0.93 2.62 0.45 1.00 0.45 5.05 1.00 3.80 1.00 2.15 0.52 2.75 2.47 4.04 2.23 1.55 3.10 1.43 0.60 0.33 1.11 1.28 0.33 0.60 0.54 3.43 3.06 1.53 3.06 3.43 0.67 0.60 0.33 0.67 1.79 5.19 3.80 1.00 29.06 5.68 3.34 19.61 29.06 1.22 3.20 2.90 1.45 1.42 3.20 2.95 1.65 2.84 4.04 4.50 6.00 2.97 4.00 5.50 2.70 5.69 1.65 4.40 5.53 2.71 1.11 1.65 3.49 4.50 1.30 2.29 3.30 1.20 1.30 3.15 2.50 4.00 2.97 7.39 6.17 19.61 2 4 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 3 4 5 8 10 4 5 9 11 13 15 17 1.60 4.64 2.92 3.07 3.31 0.93 2.62 0.45 1.00 0.45 5.05 1.21 2.15 4.04 2.23 7.69 3.43 7.66 3.43 1.17 1.30 2.14 5.62 24.27 5.68 3.34 19.61 24.28 6.59 3.17 2.51 1.17 2.06 1.07 1.82 3.30 2.96 1.44 1.42 3.30 2.95 1.65 1.60 2.84 4.00 4.50 6.00 2.97 4.00 3.20 3.00 5.69 4.56 5.83 2.71 1.11 1.65 8.95 2.20 3.80 1.35 1.30 2.87 2.50 6.16 2.97 7.54 4.50 5.84 19.61 1.75 4.56 2.77 B B’ A A' D D' C C’ B B’ A A' D D' C C’ 0.38 1.15 0.45 1.18 0.45 1.18 0.45 0.50 1.18 2.44 1.50 2.92 3.07 0.67 0.50 3.34 0.93 2.62 0.45 1.00 0.45 5.05 1.00 3.80 1.00 2.15 0.52 2.75 2.47 4.04 2.23 1.55 3.10 1.43 0.60 0.33 1.11 1.28 0.33 0.60 0.54 3.43 3.06 1.53 3.06 3.43 0.67 0.60 0.33 0.67 1.79 5.19 3.80 1.00 29.06 5.68 3.34 19.61 29.06 1.22 3.20 2.90 1.45 1.42 3.20 2.95 1.65 2.84 4.04 4.50 6.00 2.97 4.00 5.50 2.70 5.69 1.65 4.40 5.53 2.71 1.11 1.65 3.49 4.50 1.30 2.29 3.30 1.20 1.30 3.15 2.50 4.00 2.97 7.39 6.17 19.61 2 4 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 3 4 5 10 4 5 9 13 15 17 1.60 4.64 2.92 3.07 3.31 0.93 2.62 0.45 1.00 0.45 5.05 1.21 2.15 4.04 2.23 7.69 3.43 7.66 3.43 1.17 1.30 2.14 5.62 24.27 5.68 3.34 19.61 24.28 6.59 3.17 2.51 1.17 2.06 1.07 1.82 3.30 2.96 1.44 1.42 3.30 2.95 1.65 1.60 2.84 4.00 4.50 6.00 2.97 4.00 3.20 3.00 5.69 4.56 5.83 2.71 1.11 1.65 8.95 2.20 3.80 1.35 1.30 2.87 2.50 6.16 2.97 7.54 4.50 5.84 19.61 1.75 4.56 2.77 B B’ A A' D D' C C’ B B’ A A' D D' C C’ 0.80 3.38 4.08 1.44 0.18 3 4 12 13 20 21 5,35 6,3 3,74 9,98 23,32 16,28 20,53 1,4 16,28 5,35 7,87 7,87 2,48 1,96 0,3 0,6 0,45 1,96 0,49 0,49 2,25 2,67 1,86 1,13 1,08 1,13 1,79 1,13 1,15 1,96 1,6 1,15 1,15 1,13 1,79 1,13 1,08 1,13 1,86 0,43 1,6 1,5 2,1 A' A 6,15 3.60 2.55 4.70 LVL +6.15m LVL -3.60m LVL +0.0m LVL +3.50m 1.80 1.70 3.50 1.60 LVL -4.50m 1.05 1.40 0.60 0.30 0.45 0.70 0.15 0.30 0.94 1.42 1.20 0.60 LVL -3.60m LVL +0.0m 2.32 1.07 R1.17 13 19 20 Ground lvl +0.00 5,35 6,3 3,74 9,98 23,32 16,28 20,53 1,4 16,28 5,35 7,87 7,87 2,48 1,96 0,6 0,51 0,45 1,96 0,49 0,49 2,25 2,67 1,86 1,13 1,08 1,13 1,79 1,13 1,15 1,96 1,6 1,15 1,15 1,13 1,79 1,13 1,08 1,13 1,86 0,43 1,6 1,5 2,1 A' A 6,15 3.60 2.55 0.15 4.70 LVL +6.15m LVL -3.60m LVL +0.0m LVL +3.50m 1.80 1.70 3.50 1.60 LVL -4.50m 1.05 1.40 0.60 0.30 0.45 1.02 0.15 0.94 1.42 1.20 0.60 LVL +0.0m 2.32 R1.17 1.00 0.12 GROUND FLOOR FIRST FLOOR SWIMMING POOL SECTIONAL A-A’
19 3.65 0.70 10.10 0.90 1.65 1.10 1.30 1.35 1.50 1.85 1.50 3.20 3.80 1.20 3.50 0.50 0.50 0.50 2.05 1.00 1.05 1.45 0.90 3.40 0.50 1.00 1.50 0.90 1.50 1.00 1.00 1.20 1.50 0.50 0.75 0.50 0.75 0.50 1.50 5.50 0.35 1.50 0.90 1.50 0.35 0.65 1.20 0.55 1.20 0.90 1.20 1.85 29.59 21.15 LVL +7.95m LVL +4.8m LVL +6.0m 1.9 1.20 2.30 1.50 LVL +4.25m LVL +7.25m B B’ 6 11 13 16 17 2.77 2.92 2.88 3.31 2.99 1.21 2.15 4.04 2.23 6.01 3.43 7.66 3.43 1.30 3.80 24.27 5.68 3.34 19.61 24.28 9.76 2.51 6.00 1.35 19.61 6.00 6.00 6.00 10.14 3.28 12.65 1.00 0.78 1.80 0.73 5.83 1.14 0.73 4.06 6.23 2.70 2.87 5.60 A8 A8 A9 A9 2.77 2.92 3.31 4.03 24.27 19.61 24.28 6.00 19.61 6.00 6.00 6.00 0.80 2.10 12.65 2.70 2.87 1.35 7.22 2.73 A9 B B’ A A' D D' C C’ B B’ A A' D D' C C’ 6 11 13 16 17 2.77 2.92 2.88 3.31 2.99 1.21 2.15 4.04 2.23 6.01 3.43 7.66 3.43 1.30 3.80 24.27 5.68 3.34 19.61 24.28 9.76 2.51 6.00 1.35 19.61 6.00 6.00 6.00 10.14 3.28 12.65 1.00 0.78 1.80 0.73 5.83 1.14 0.73 4.06 6.23 2.70 2.87 5.60 A8 A8 A9 A9 2.77 2.92 3.31 4.03 24.27 19.61 24.28 6.00 19.61 6.00 6.00 6.00 0.80 2.10 12.65 2.70 2.87 1.35 7.22 2.73 A9 B B’ A A' D D' C C’ B B’ A A' D D' C C’ 4.08 3.75 1.42 0.11 0.25 0.10 0.70 10.10 1.30 1.50 1.85 3.20 3.80 1.20 3.50 0.50 0.65 0.50 0.65 0.50 2.05 1.00 1.05 1.45 0.90 3.40 1.00 1.50 0.90 1.50 1.00 1.00 1.20 0.50 1.50 0.50 0.75 0.50 0.75 0.50 1.50 5.50 1.50 0.90 1.50 0.35 0.65 1.20 0.55 1.20 0.90 1.20 1.85 0.79 21.15 LVL +6.15m LVL -3.60m LVL +0.0m +3.50m LVL -4.50m -3.60m +0.0m LVL +7.95m LVL +4.8m LVL +6.0m 4.20 1.9 2.30 1.50 LVL +4.25m LVL +7.25m 1.20 B B’ 3.65 0.70 10.10 0.90 1.65 1.10 1.30 1.35 1.50 1.85 1.50 3.20 3.80 1.20 3.50 0.50 0.65 0.50 0.65 0.50 2.05 1.00 1.05 1.45 0.90 3.40 0.50 1.00 1.50 0.90 1.50 1.00 1.00 1.20 0.50 1.50 0.50 0.75 0.50 0.75 0.50 1.50 5.50 0.35 1.50 0.90 1.50 0.35 0.65 1.20 0.55 1.20 0.90 1.20 1.85 29.59 0.79 21.15 +6.15m -3.60m -4.50m LVL +7.95m LVL +4.8m LVL +6.0m 4.20 1.9 1.20 2.30 1.50 LVL +7.25m B B’ 1.10 0.25 SERVANT REST AREA SECTIONAL B-B’ TERRACE PLAN WATCH TOWER
20 WALLPAPER 1 LVL +0.30m LVL +0.0m LVL +3.90m LVL +7.80m LVL +10.40m 2.10 2.11 0.24 2.57 3.60 3.75 6.15 3.45 1.30 2.30 LVL +0.30m LVL +0.0m LVL +3.90m LVL +7.50m LVL +11.55m 0.30 1.00 2.35 0.40 3.45 0.30 2.30 1.13 3.45 ( PLINTH LEVEL ) ( FIRST FLOOR LEVEL ) ( TERRACE LEVEL ) ( PLINTH LEVEL ) ( GROUND LEVEL ) ( PLINTH LEVEL ) ( FIRST FLOOR LEVEL ) ( TERRACE LEVEL ) ( DUCT TOP LEVEL ) ( GROUND LEVEL ) 0.64 3.62 1.63 1.53 0.41 3.83 2.25 3.70 2.64 R0.27 0.86 ROUNDED ARCH 6.92 4.05 2.81 0.46 0.26 1.28 1.36 1.35 1.30 0.27 0.26
SEGMENTAL ARCH LVL +15.30m LVL + 7.80m LVL +4.05m LVL +11.55m LVL +0.30m ( GROUND FLOOR ( FIRST FLOOR ( TERRACE FLOOR ( WATCH TOWER 0.40 0.40 1.00 3.75 3.75 3.75 3.75 2.36 SECTIONAL C-C’ FRONT ELEVATION PORTICO 0.3 2.73 4.85 1.69
POINTED
21 +15.30m 7.80m +4.05m +11.55m +0.30m FLOOR ) FLOOR ) ( GL ) FLOOR ) TOWER FLOOR ) 2.36 3.75 3.75 3.75 3.75 0.40 1.00 WALLPAPER 2 1.48 2.47 1.54 1.41 0.50 2.25 2.53 0.79 0.28 ROUNDED TREFOIL ARCH THREE POINTED ARCH 2.54 3.45 1.68 1.20 PESUDO THREE CENTERED ARCH BACK ELEVATION SECTIONAL D-D’ PITCHED ROOF(GABLE) 3.60 0.78 LVL +0.30m LVL +0.0m LVL +3.90m LVL +7.80m LVL +10.40m 2.10 2.11 0.24 2.57 3.60 3.75 6.15 ( PLINTH LEVEL ) ( FIRST FLOOR LEVEL ) ( TERRACE LEVEL ) ( PLINTH LEVEL ) ( GROUND LEVEL )

SKETCHES 4

22
2020 2020 2020
23 2019
2021 2 0 2 1
2020

4

MODELS AND RENDERS

24

SOFTWARE USED :

Rhino 3d Modelling

Sketch up Blender Lumion

25

FREELANCE PROJECTS 5

26
27
aswathjmarch@gmail.com Linkedlin Instagram 9843894648 ASWATH (JM) KUMAR https://www.linkedin.com/in/aswath-kumar-410954249/

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.