n
Sh Sh ing ea le th s & in g
ctio u r nst m o c De iagra D
Li g Fr ht am St in ick g
Client: BRISTON ARMS Employer: DAVIS SQUARE ARCHITECTS Date: May 2015 Location: CAMBRIDGE, MA Scope: Renovation proposal Submitted to project architect during site and building analysis. I noticed that the courtyard seemed too dark and cramped. My proposal included the removal of the hedges from sidewalk edges and pushing them back towards the buildings and the removal of the outdated mansard style roofs to be replaced by aluminum panel siding.