Mirbat: Dhofar Governorate

Page 126

#04

ACTION

Mirbat - Heritage Management and Development Plan

softscaping

Aim Restore natural water flow and drainage patterns

KHAWR

Solution Restore the khawr topography by remodelling its edges. Reestablish the original natural sediment flows, exchanges between land and sea and associated drainage systems, by removing the roads that run through the inlet.

P10 | Tudela/Culip Restoration Project

#02

#04

P6 | Adlershof Park

softscaping

ACTION

P4 | Marsupial Bridge

ACTION

124

lighting

Aim Restore ecosystem dynamics and natural vegetation

Aim Improve safety, reduce light pollution and energy consumption

Solution Remove any invasive flora species and plant the edges of the khawr with native grasses and bushes. Employ, if necessary, soil bioengineering techniques, such as use of natural fibre geotextiles, to control soil erosions along newly reconstituted slopes.

Solution Opt for energy efficient LED spotlights, integrated into the new route through the khawr, in order to illuminate it evenly but discretely, so as not to impact any nocturnal fauna that might live nearby.