was her dry er
PORTFOLIO ANNA BOOTHE
ARCHITECTURE STUDENT 2022
ANNA BOOTHE I have always had a creative side in my life, architecture has been my creative outlet for years. My goals in the architecture program are to graduate and pursue my masters in hopes of one day owning my own company. The projects shown will be first year through second year of my ambitious works.
Email Contact A m b 13 6 @ l a t e c h . e d u
Sof tware Skills
Adob
Rhino
Photos
Autocad
Indesig Illustra
Lumion
CONTENTS EGG CANTILEVER 3-4
FOUR FOLD 5-6 Four Fold Asmt 1 Anna Boothe SCALE: 1" = 100'
Phone Contact ( 8 3 2 ) 5 8 8 - 216 5
Address 1200d Wilturner Rd, Duson LA
be Skills
Of fice Skills
shop
Wo r d
gn ator
PowerPoint Excel
D
THE ARTIST
RESIDENCE 7-8
OBJ 9-10
The A-List Brewery 11-12
EGG CANTILEVER FIRST YEAR PROJECT 1
The objective of this assignment was to think about create a concept to begin the proccess of form development. In my project the concept to complete the impossible, I accomplished that by heating and soaking wooden sticks to bend and form circular forms. While also keeping in mind the structural aspect of how to hang it on the wall.
FOUR FOLD
The objective of this Assignment was to think about how to create a Geometrical concept Followed by a story to Explain the reasons Behind every move. The story that followed the concept was a new city built for mars residents looking for a fresh start. The cylinder like form is an open atrium that can view both inside and outside of the mars city. The triangles are meant to represent complex forms and communicate with circles in a conceptual way. The Drawing to the right is an artist understanding of the city
FIRST YEAR PROJECT 4
THE ARTIST RESIDENCE This project is meant to house the artists Evelyn Glennie and Olafur Ellisson. Ellison is an Environmental artist and works well with the nature around him, his studio is placed facing the pond and open area around it. Glennie is a deaf percussionist who uses vibrations to feel her music, thus is why there are divots in the floor for her studio for Water placement so she can physically see her music around her. On the public side of the house there is a collaborative space for both artist to work on projects together it is a Stage set up in the water for Glennie to move the still water around her and a huge white door back drop to act as a blank canvas for Ellisson. Near the bedrooms there are private patios for the residence to not be bothered by the public.
1 Environmentalist studio 2 Office 3 Percussionist studio Site Plan
2
3
12
Section B
Sect
2 2
10
1
12
o
tion A
dryer
9
4 Bedroom 5 Laundry 6 Bathroom
6 7
7 Kitchen 8 Living room 9 Dinning
7
8
11
4
washer
6
10
9
5
4
3
8
10 Out door patio 11 Storage 12 Stage
9 STEPS
OBJ This project was to make nine functional abstract shapes with purpose. This project I choose the watermelon spittoon i designed the spittoon to have holes where the watermelon seeds could miss, thus this made the object a game. The concept was to enjoy my object not just be a desk ornament.
Watermelon spittoon
Humming bird feeder
Oreo holder
Egg Shell holder
Phone Lamp shade
Candle holder
Prosthetic branch
Pet Rock traveling case
The A-List Brewery Anna Boothe
The A-List Brewery is intended for the citizens of Shreveport to bring a slice of life back to the city by combining a brewery and restaurant. The concept of this project is to explore spacial relations and how the interact with each other. This was completed by using all the programs the citizens would see, and have programs communicate across Platforms. The exterior and some of the interior has quite a few triangles strategically placed for the intent to always bring the visuals to the center, where the most amount of communication happens.
Brewery Brew activities
Kitchen Dinning
16
14
13
13 16
11
11
10 15
1
10
1
1
Section B
10 15
1
Section A
5
2
4
16
4 Open to below
Open to below
16
3
13
5
Open to below
14
4th Floor 3/32” = 1’
11
11
11
11 12
5
Open to below
3
15
Open to below
10
Key 3rd Floor 3/32” = 1’
1. Dinning 2. Kitchen 3. Mechanical 4. Break Room 5. General Storage
9
3
6. Milling 7. Lab 8. Keg Cleaner
Open to below
8
1
9. Grain Storage 10. Brew House & Fermentation
7
5
11. Office 12. Conference
2nd Floor
3/32” = 1’
13. Cold House 14. Bottle Filling 15. Bar 16. Loading Area
5
1
Form Diagram
2
6
3
4
16
1st Floor
3/32” = 1’