Drawing List Sheet Number A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16
Title Sheet Floor Plan Building Sections Wall Sections Interior Elevations Interior Elevations Door Schedule Enlarged Plans & Details Details Details Details Furniture Plan Finish Plan Finish Schedule & Elevations RCP Lighting Plan
Classroom View
AFF ACT CW DWG EA EL ELEC ENAM EQ EQUIP FIN FLR FRM GL GYP GWB
INT PLAM PT MTL MIN PLAS PLWD REQ'D RM SCHED S SS SF STD TYP WD
Above Finish Floor Acoustical Tile Casework Drawing Each Elevation Electric Enamel Equal Equipment Finish Floor Frame Glass Gypsum Gypsum Board
Interior Plastic Laminate Paint Metal Minimum Plaster Plywood Required Room Schedule Switch Solid Surface Sheet Flooring Stud Typical Wood
Abbreviations 1/8" = 1'-0"
101 1 A101
Door tag
SIM
1
SIM
Section symbol
A101
Detail callout
Room name Centerline
101 150 SF
North arrow
?
Name Elevation
Level indicator
Room tag
1
Tag
View Name 1/8" = 1'-0" Drawing title
Key to Symbols 1/4" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
GENERAL NOTES 1. The GC shall verify all printed dimensions in field prior to construction. Do not scale drawings. 2. The GC shall verify the location of all partitions in the field and shall confer with the Interior Designer about any existing condition which may affect the general layout as shown on drawings. 3. Blocking in walls shall be provided in all areas where required, which shall include all cabinetry, access panels, closets, and communication panels 4. The GC shall be responsible for filing all documents with the required regulatory agencies, paying related fees, and obtaining required approvals and permits. 5. Sprinkler and HVAC will be coordinated with others; relocation of sprinkler, heat, diffusers, or returns to be coordinated with Interior Designer 6. Installation and trim requirement to be coordinated with Manufacturer and all appropriate Contractors 7. All recessed incandescent fixtures will have thermal protection 8. All fixtures contacting insulation will require special protection 9. All installations will meet federal, state, and local fire and safety codes 10. Circuiting and wiring diagrams done by others 11. All electrical and telephone installations shall be in accordance with federal, state and local codes 12. GC to coordinate all plumbing, mechanical, and electrical work with sub-contractors and engineers.
Description
Date
Title Sheet Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather Pj do Val
A1
5/11/2011 3:22:14 PM
1
Sheet Name