Module 3 - Concrete
Phase 2 In this phase, we explored two other types of construction methods. Since I explored steel in the first phase, I looked at concrete and heavy timber construction for phase 2. Although my design comprised of two structures, 32’ this phase focused only on one bay of the design. In this phase, we learned about how different materials can influence the overall design.
Concrete Construction
Section Scale 1’ =3/16”
Module 3 - Concrete
Module 3 - Heavy Timber 40’
32’
32’
Section Scale 1’ =3/16”
Detail 1 Scale 1’ = 1 -1/2”
50’
Heavy Timber Construction
Module 3 - Heavy Timber
40’
Plan Scale 1’ =3/16”
Detail 2 Scale 1’ = 1 - 1/2”
Section Scale 1’ =3/16”
Concrete
Type I - B - NS 11 floors / UL sqft
Pour Footings Erect cast in place column/girder
Pour concrete foundation
160’
Attach cast in place beams -with metal fasteners/epoxy
Plate Area = 10,560 sqft
32’
24’ 50’
Plan Scale 1’ =3/16”
Section Scale 1’ =3/16”
Detail 1 Scale 1’ = 1 -1/2”
40’
Detail 2 Scale 1’ = 1 - 1/2”
Abby WInter _ Arch 600 + 611