Project O&M Manual For Electrical & Mechanical Operation and Maintenance
Project Details: Customer:
Signed: For and on behalf of Abacus Lighting Limited
DP World Southampton
Project Name/Location: DP World Southampton, SO15 1DA
Project Reference: DP World Southampton
Name of HSEQ Representative: D Griffiths
Purchase Order Reference:
Date Signed:
PO18870SOU
08.01.2026
Abacus Reference: 86227
Date: 08.01.2026
Shipping Date: 31.10.2025
Introduction to the Abacus Lighting Operations & Maintenance Manual This document serves as a guide for the electrical & mechanical lighting installation project described above and complies with the requirements of the Construction (Design and Management) Regulations 2015. This lighting system has been designed following the guidelines outlined in BS7671:2018 (the 18th Edition IEE Wiring Regulations), specifically in Section 559 (Luminaires and Lighting Installations) as published by the Institute of Electrical Engineers in London.
Phone: 01623 511 111 - Email: info@abacuslighting.com - Website: www.abacuslighting.com