Yizhi Zhang Architecture Portfolio

Page 1

YIZHI ZHANG

ARCHITECTURAL PORTFOLIO | 2018-2021

1
Architecture Portfolio 2021

Email: Yizhi_zhang@outlook.com

Phone: 226-978-9837

Portfolio Link

Revit Portfolio Link

LinkedIn

Profile

Yizhi Zhang

Intermediate Architectural Designer

Highlights

• 5+ Years of professional experience in Residential and Mixed-Use Projects

• 2x selected for OAAAS large building competition

• OAAAS student award winner and membership holder

• Certified by Autodesk Professional for Revit for Architecture

• Knowledge of Ontario Building Code—BCIN (Legal). Actively pursing professional credentials

Professional Experience Education

Turner Fleischer Architects Inc. / Intermediate Architectural Designer

June 2021-Current

Intermediate Architectural Designer:

• Experienced in Revit / BIM for preparing and coordinating drawings/documents. Ensures compliance with client specifications and building codes.

• Coordinates effectively with consultants to ensure seamless project integration and collaboration.

• Takes on responsibilities and accountabilities with a proactive and dedicated approach.

Noir Design / Architectural Technologist & Contract Based BIM Manager

May 2019–May 2021

Architectural Technologist:

• Prepare construction documents, 3D model,partake in site visits, and draft workshop drawings BIM Manager

• Produce and revise 2D and 3D models during the pre-construction and construction phases

• Create standardized BIM documentations (drafting standard, annotation style, and wall details)

Centennial College / Dynamo Research Group

Jan 2020–May 2020

• Specializes in developing algorithmic design codes for Revit with Dynamo.

Centennial College

Adv. Dip Architectural Technology (Co-op)

Toronto, ON

Graduate: 2020

OAAAS Student Member Large Building Winner Prize Architecture Competition

2020

AutoCad
June
Autodesk Revit Autodesk
Proficiencies
Professional Certified AutoDesk International Revit Professional for Architecture
2020 SketchUp Rhinoceros 3D Enscape Adobe Suites International Architecure Competitions
Project July
Awards
Revit
June
Shortlised
2021

Content

About me

It’s clear to me, architecture is not just a profession but a fusion of various disciplines and a platform for boundless creativity and innovation. It’s the intersection of philosophy, sociology, psychology, and physics, where thinking and making converge to create spaces that resonate with human experience. My understanding captures the multifaceted nature of architecture, encompassing roles such as builder, artist, philosopher, craftsman, designer, and project organizer. This holistic approach reflects your deep appreciation for the complexity and potential of architectural practice.

4 Table of Content

Gear-Scraper

Conceptual Projects

Professional

Trinidad

Preliminary

5
Projects Pink House Visitor House Competition Project In Italy 08 16 24 32 40 44
Mixed-Use Studio Project “270 m” Affordable Housing Toronto Affordable Housing Challenge
Resort Resort Design
Project
Staircase Staircase Design
Package Includes 3D Modeling, Plans, And Details
Documentation BIM
Templates, Checklists, And Drafting Standards
Modern
Staircase
BIM
BIM

Conceptual Projects - Selected Works

6 Yizhi Zhang
7

Large Building Winner Prize

01 Gear-Scraper

Mixed-Use Development | Studio Porject | 2019 BIM | Revit | Grasshopper | Enscape

Gear-Scraper was honored with the OAAAS Student Award, recognizing its innovative design, sustainability features, and community-focused approach. The award highlights the project’s contribution to advancing architectural design and construction development .The “Gear-Scraper”is a conceptual mixed-use indivudual studio project designed as a sustainable and community-centric urban development. The project offers a range of housing options, including luxury apartments and affordable housing units. Integrating residential, commercial, and public spaces, Gear-Scraper embodies a new approach to urban living that prioritizes sustainability, connectivity, and inclusivity.

8 Gear-Scraper
2020 OAAAS
10 Gear-Scraper
1. CN Tower 5. Olympic Park 2. Aquarium of Canada 3. RoundHouse Park
Key Plan + Context Plan
4. Rogers Center
1. 2. 3. 4. 5.
3D Context Plan

Extend Rotate Patio

The building’s structure is simplified by a solid core and efficient floor layout. The facade uses durable materials that maintain shape without thermoforming, with ventilation integrated into the load-bearing structure. Each floor’s units are rotated 45° horizontally. This design eliminates the need for additional enclosure, which is advantageous for tall buildings.

The podium is oriented towards the busiest street to enhance the economic impact for the retail spaces.

The sun path analysis diagram indicates the areas receiving the highest amount of heat and illustrates the orientation of the courtyard’s openings.

Penhouse Suite Sustainable Features Core

The apartment complex is positioned towards the busy street to offer highrise residents better views.

The vertical transportation system in the two buildings is designed to disperse the crowd in multiple directions.

The affordable housing building is positioned on a tranquil street, featuring a courtyard that faces south.

Green roofs and sustainable features are incorporated into the building to create a more environmentally friendly and refreshing atmosphere.

11
12 Gear-Scraper
Podium Level—2 Level Grocery Store 2. Retail Units 3. Untility Rooms for Condo 4. Elevators 5. Suite Units 6. Balconies 7. Staircases 8. Indoor Swimming Pools 9. Paths 10. Daycares 11. Banquet Halls 12. Staircases 13. Suite Units 14. Linear Hallways
1.
13 ≥20 CEMENT MORTAR TO PASTE THE SURFACE OF ANTI-SKID FLOOR TILE ASPHALT POLYURETHANE WATERPROOF LAYER CEMENT MORTAR 3% SLOPING REINFORCED CONCRETE FLOOR INTERIOR FLOOR GLASS PANEL RAILING CONCRETE FLOOR SPANDREL INSULATED PANEL FIREPROOFED STEEL FRAMING WELDED MULLION SINGLE LAYER LAMINATED GLASS WALL DOUBLE GLAZING DOUBLE GLAZING FIREPROOFED STEEL FRAMING WIELD FALSHING WIELD FALSHING CONCRETE FLOOR
14 Gear-Scraper Ground Floor Typical Floor Plan
15
South Elevation East Elevation

02 “270m”

Toronto Affordable Housing Challenge |Competition Project | 2021 Rhino | Enscape | Lumion

The project explores the possibility of using urban abandoned space to decrease the current shortage of housing in Toronto. The site is located under a viaduct in the bustling city center of Toronto, facing the CN Tower. The project uses the original mega structure as the structural frame of the building. Between the original structures, there is a recyclable steel structure system and modular living units. The building uses staggered blocks to improve sunlight exposure and connect residential and urban living areas. The inclusion of the city square and commerical space located brings life to the abandoned space. This building uses a sustainable construction method and transforms the new housing space into beautiful landscape in Toronto.

16 “270m”
17 Economically Affordable Housing Accessibility Using The Space Under City Central Bridge Convert Abandoned Space Into Mix-Used Space Design Based On Existing Bridge Structure Save Land Use Save Building Materials EXISTING CONDITIONS DESIGN GOALS DESIGN GOALS
1. Exploit Urban Abandoned Space 2. Connecting Mega Existing Structure 270 m Project Site Heart of Downtown Toronto Gardiner Expy 3. Insert Dwelling Blocks 4. Public Spaces Contribute to the Social Fabric of Communities 5. Commerical at Bottom Improving Economic Efficiency 6. Shared Lobbies Creating Dynamic Circulations 270m

Bridge

Bridge

Bridge

Residential

18 “270m”
1. Urban Plaza 3. Residential Balcony 4. Retail Unit 2. Communal Space Support Support Moudel
19 UNIT A UNIT B UNIT C Single - 28 sqm Couple - 41 sqm Family - 62 sqm 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 3 3 3 3 1. Urban Plaza 2. Retails 1. Unit A 2. Unit B 3. Unit C Level 2 Level 1 3. Residents Loby 4. Communal Space Module Plan

Options for how to deal with recycled materials:

1. Establish system boundaries so that recycling at the end of the life or use phase is completely excluded from the life cycle analysis of buildings.

2. The recucling effect is seen as “local relief” in the disposal costs. Materials that are recycled do not need to be disposed of and are therefore not a burden to landfills nor have the resulting environmental impact.

3. The recyling effect is taken into account firstly as a relief on disposal costs, and secondly as time-dependent “global relief”, The global relief is credited onlt at the point in time when the event is schedule to occur.

20 “270m”
Fiberglass Insulation Timber Panel Cellulose Insulation North Elevation South Elevation
21
22 “270m”
23

03 Pink House

Visitor House | Living Museum Competition Project | 2021 Rhino | Revit | Lumino

The concept of Pink House is designed to separate itself from traditional museum concepts to build a residential group around the Nivola Museum in Italy, serving as a living area for visitors.

The accommodation is guaranteed for a maximum of 8 guests. Pink House separates 8 guests into 8 independent small units surrounded by olive trees and Mediterranean vegetation. The Nivola Museum is located in a privileged stenographic position capable of captivating any visitor. A terrain that extends on the west side in an esplanade devoid of dense vegetation and extends to the south to meet a steep and rugged ground full of bushes and native flora of different shades of green.

24 Pink House

3D Site Plan:

Inspired by the unique nature of this magnificent landscape, participants are free to decide where to place the intervention. In between the trees, following the topography, embedded in the hill, raise from the ground, are just some of the endless possibilities.

The “look forward “ imagines and design creative proposals focused on a Unique and unconventional kind of accommodation facility, located in the heart of the museum’s park. A privileged stopover for those courageous tourists intent on traveling through the Nuorese region, and possibly also for those international artists who periodically reach the Museo Nivola to set up their own exhibitions.

26 Pink House Museum's Main Entrance Room Permanent Exhibition Entrance Formal Gardens
The Nivola Museum The “Look Forward” The Concept Evolution

The Main Floor

The Section

27 DN DN BEDROOM FFL ± 0.00 MARBLE BATHROOM FFL ± 0.00 MARBLE STORAGE FFL ± 0.00 MARBLE KITCHEN FFL ± 0.00 MARBLE PATIO FFL ± 0.00 MARBLE A 1 1 A A 2 1 3 1 4 1 5 1 B A C A 35'-11 3/4" 8'-2 1/2" 11'-3 1/2" 7'-6" 9' 2'-2" 3'-2" 7'-0 1/4" 3'-2" 3'-3 3/4" 6'-4 1/2" 35'-11 3/4" 8'-11 3/4" 8'-2 3/4" 11'-3 1/2" 7'-6" 2'-2" 3'-2" 7'-0 1/4" 3'-2" 10'-1 3/4" 13'-10 3/4" 13'-10 3/4" 6'-6 1/4" 5'-7" 0' 10' 20' 40' PROJECT ADD YOUR PROJECT NAME Project adress PROJECT NO: 2020-01 DRAWING BY: LAST NAME, YOUR NAME DATE: 10 /11/19 DRAWING TITLE: SCALE: 1:100 A.01 PLAN DRAWING NO: 5 4 2 1 30'-10 1/4" 12'-6" 14'-10 3/4" 3'-5 3/4" 9'-8 1/2" 14'-10 1/2" 0' 10' 20' 40' PROJECT ADD YOUR PROJECT NAME Project adress PROJECT NO: 2020-01 DRAWING BY: LAST NAME, YOUR NAME DATE: 10 /11/19 DRAWING TITLE: SCALE: 1:100 A.01 PLAN DRAWING NO:
28 Pink House
1. Wall Stud Structutre Wall 2. Interior Wall With 2”X4” Wood Stud With 2 1/2” Drywall 3. Spin Staircase 4. Wood Frame Structure 5. Architectural Build-Out 1. Wall Stud Structure 2. Wood Sheathing 3. Two Layers Building Paper 4. Metal Lath 5. Cement Plaster 6. Fiberglass Reinforcing Mesh
1 2 3 4 5 6 7
7. Finish Coat
29

Professional Projects - Selected Works

30 Yizhi Zhang
31

04 Trinidad Resort

Resort and Villa Design | Work Project | 2019 SketchUp | V-Ray

This project focuses on a concept of an eco-friendly resort to develop the local economy and tourism culture.

Role: proposed a concept based on agriculture land-use style to develop architecture that incorperates planting and other vegetation at the same time, which can be picked by visitors; for example, scallions are planted for viewing, rich layers are formed between the tree and the ground cover. Most of the materials used include timber wood planks and sustainable materials to decrease cost and waste.

32 Trinidad Resort
34 Trinidad Resort Port of Spain Sangre Grande Chaguanas Trinidad and Tobago Site Site Mayaro Rio Claro San Fernando Fyzabad Penal LEGEND Main Road Pedestrian Manzanilla Beach Nariva Road Eastern Main Road Manzanilla Mayaro Road Manzanilla Bay Wild Green Land Hammerhead Bar and Restaurant Life Guard Post National Gas Station Manzanilla Health Station

Vegetation Analysis

Plant Size Analysis

0yrs

This is a building succession analysis, which de scribes the construction process of palza and vegetations in 5-6 years

Planting

Berberis thunbergii

Pyrus sorotina

Berberis thunbergii

Pyrus sorotina agnolia grandiflora

Diospyros kaki

5-6yrs

ora Magnolia grandiflo

O th f smanthus fragran

ns

Sophora japonica

ora Magnolia grandiflo

ns Osmanthus fragra

Sophora japonica

Diospyros kaki

Diospyroskaki Punicagranatum Magnoliagrandiflora

Koelreuteriapaniculat

Osmanthusfragrans

Osmanthusfragrans Magnoliagrandiflora

Pyrussorotina

CassiasurattensisBurm .f.(C.glaucaLam.). Punicagranatum OsmanthusfragransMagnoliagrandiflora

DiospyroskakiAcerpalmatum

PyrussorotinaOsmanthusfragrans

Acerpalmatum

Magnoliagrandiflora

Acerpalmatum Osmanthusfragrans

Pyrussorotina Punicagranatum

Diospyroskaki

Osmanthusfragrans Magnoliagrandiflora

Acerpalmatum

35
Planting Establishme
5m 5m 30m 10m 15m 20m 25m 5m 30m 10m 15m 20m 25m 30m 10m 15m 20m 25m
The impact of lifestyle on campus
Site Plan Section A-A1 B1 B1 Visitors Flowrate 08 14 12 10 16 20 22 18 24 MonT us Fri Thur WedS at Sun Visitors Flowrate Date Service Migrant Population Type of ActivityP ermanent Resigents Entertainment Parking Parking Hote Restaurant age distribution age distribution age distribution age distribution Tree plaz Performance Activity Restoration Ar Art Gallery History Museum Viewing Parking 2P arking 3
Section B-B1 A1 A1 Visiters Food Street Foods in Food Street Foods outside Food Street Shanxi Feature Impression 08 14 12 10 16 20 22 18 24 Visitors Flowrate MonT us Fr Thur WedS at Sun Visitors Flowrate Date Impression Resigents Popularity Food Street Foods in Food Street Foods outside Food Street Shanxi Feature

• Structure Analysis

The circling and rising pillars vigorously rise, creating a beautiful resting space for the people sitting in it.

38 Trinidad Resort
Queen Vila Single Vila Hotel Center Park
39
& Bar
Playground

05

BIM Documentation

Architectural & Construction Work | 2020 BIM | Revit | Family Making

Experienced in developing and coordinating custom home projects, including the preparation of detailed construction documents for permit submissions. Integrates technical expertise in detailing, building materials, and construction technologies to achieve design solutions. Collaborates with various disciplines to ensure project coordination through all phases.

Role: As BIM manager, ensured team adherence to design templates and standards, maintaining consistency and quality throughout projects.

As designer, proficient in preparing construction documents, 3D modeling, participating in site visits, and drafting workshop drawings to support project development and execution.

40 BIM Documentation

My ability to integrate technical knowledge into design solutions and collaborate with other disciplines is a valuable asset. It allows me to develop comprehensive construction documents and coordinate projects effectively through all phases. This holistic approach ensures that design intent is carried through to the final built form, enhancing the quality and integrity of the project.

41 DN UP 859 SQFT GARAGE 110 SQFT LAUNDRY 219 SQFT OFFICE 97 SQFT MUD ROOM 41 SQFT POWDER ROOM BENC H 2 01 0 " 6.35 m 12' - 5 1/2" 3.80 m 8' - 1 1/4" 2.47 m 13' - 8 3/4" 4.18 m CEILING 10' A.F.F. CEILING 10' A.F.F. CEILING 10' A.F.F. CEILING 10' A.F.F. Ceiling 11' - 3 3/4" A.F.F. 3'8 3/4" 1.14 m UP 3 STEPS D-01 D-01 D-01 ED-02 2'6 3/4" 0.78 m 4'0 3/4" 1.24 m 22'6 3/4" 6.87 m 13'7" 4.14 m 5' - 2 1/2" 1.59 m 7' - 7 1/2" 2.32 m 5' - 1 3/4" 1.57 m 8'6 3/4" 2.61 m D-03 IW-03 IW-03 IW-02 IW-01 IW-02 EW-05 W-127 W-126 2' - 5 3/4" 0.76 m 5' - 0" 1.52 m 5' - 3" 1.60 m 5' - 0 1/4" 1.53 m 8'1" 2.46 m 5' - 4 3/4" 1.64 m 6' - 5 3/4" 1.98 m 14'5" 4.40 m 7'0 1/4" 2.14 m 2'4" 0.71 m W D IW-01 IW-01 4' - 1" 1.24 m 2' - 3 3/4" 0.70 m IW-01 IW-01 IW-01 IW-01 IW-01 IW-01 13' - 4" 4.06 m 5'4 1/4" 1.63 m 5' - 10 3/4" 1.80 m 10' - 9" 3.27 m 18' - 5 1/4" 5.62 m 10' - 2" 3.10 m DECK SEATING IW-03 EW-04 EW-04 W-106 W-105 ED-02 W-107 IW-01 IW-01 IW-01 4'1" 1.24 m 6'3 1/4" 1.91 m 3'6 3/4" 1.09 m 7'7 1/4" 2.32 m IW-01 IW-03 6' - 8 1/2" 2.05 m 6' 1.91 9' - 3" 2.82 m 3'11 3/4" 1.21 m 6'11 3/4" 2.13 m 4'6" 1.37 m IW-01 IW-03 8'11 1/2" 2.73 m 16'0 1/4" 4.88 m 169 SQFT HALLWAY 277 SQFT LOBBY 404 SQFT KITCHEN 86 SQFT B. PANTRY 63 SQFT KITCHEN SEATING 69 SQFT COFFEE STATION 44 SQFT PANTRY 3' - 4" 1.02 m 1' - 4 1/4" 0.42 m 8' - 1 1/4" 2.47 m 23' - 0" 7.01 m 8'11 3/4" 2.74 m 17'4" 5.28 m 5' - 0 1/2" 1.54 m 6'4 1/2" 1.95 m SD-CMD 35+20 8+9 8+9 35+20 D-16 225 SQFT DINING ROOM 24 SQFT WINE CELLAR Steps 15 Steps 15 20 20 20 20 20 20 20 22
42 BIM Documentation
43

06 Modern Staircase

Staircase Design | 2018 SketchUp | AutoCad | V-Ray

An interior alteration project in Scarborough, Ontario. The task assigned to me was to design the stairs that lead from the main floor to the second floor.

The style of the staircase is modern with duo structure support under. Furthermore, a mid-dark glossy saturated wood was introduced along with brushed steel hardware.

Role: Responsible for assisting with production of CAD drawings, finalizing details, and selecting the finishes in accordance to the standards of Noir Design.

44 Modern Staircase
46 Modern Staircase Second Floor & Type. Tread Detail 1 Basement& Type. Tread Detail 2 Ground Floor & Type. Tread Detail Stairs to Landing Detail
47

Thank You

48 Table of Content Vvv
ARCHITECTURAL PORTFOLIO

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Yizhi Zhang Architecture Portfolio by Yizhi Zhang - Issuu