Asset Renewal

Page 1


Asset Renewal

Our Approach

Adapting legacy buildings is integral to urban regeneration. We consider the renewal of our underperforming assets as a means to realize a sustainable future.

Zeidler supports our clients in the reimagining of their existing assets into resilient, vibrant destinations From minimal interventions to intensive measures, we design inspiring places that foster social engagement, facilitate excellence and deliver enduring value .

Our approach to asset renewal is driven by environmental, social and economic factors Our work repositions, repurposes and renews aging buildings to protect resources for future generations and improve urban life

Reposition

We reimagine properties in response to changing market conditions and to ensure long-term economic resiliency Our designs reposition assets as desirable environments . We strengthen their integration with the surrounding community through improved connectivity, transparency and impact

Repurpose

We transform underperforming buildings into well-conceived, thoughtful places . We take an environmental and socially responsible approach to design . Repurposing assets allows us to retain embodied energy and support the social fabric of the local community

Renew

We are leaders in the delivery of complex upgrades with great design ambition . Our work elevates existing assets, improving their performance and extending their lifespan . We renew with a contemporary design approach while celebrating the building’s original architectural expression

Building Feasibility Considerations

Understanding the existing condition of each asset is key in outlining initial investment costs.

A thorough analysis will determine the lifespan of the building’s elements and systems, providing our clients with an understanding of what needs to be repaired, replaced or upgraded .

We support our clients in identifying the best ways to take advantage of their asset’s embodied carbon The results are places that are both economically and environmentally resilient, helping our clients build their legacy through impactful developments

Using the building feasibility considerations listed here, we develop a holistic analysis of the asset . From here, we can effectively create a redevelopment plan that aligns with the project’s goals and the intensity of the renewal approach desired .

General

¡ Location and orientation

¡ Building age and classification

¡ Primary use type

¡ Floor plate size and overall area

¡ Existing building certifications

¡ Interior finishes

Building Envelope

¡ Window types and performance

¡ Wall performance and air barrier system, thermal bridging, assembly

¡ Window to wall ratio

¡ Roofing systems

¡ Exterior finishes

Structural

¡ Foundations

¡ Structural framing of walls

¡ Column layout

¡ Floor to floor heights

¡ Load capacity

¡ Seismic loads

Mechanical

¡ Heating and cooling systems

¡ Air distribution systems

¡ Hot water heating

¡ Plumbing

¡ Conveyance systems

¡ On-site renewable energy

¡ Energy scorecards

Electrical

¡ Power capacity

¡ Lighting system

¡ Building security

¡ Technology upgrades

Public Realm

¡ Street activation

¡ Lobby and concierge

¡ Access and safety

¡ Site connectivity

¡ Parking

Site and Grounds

¡ Hard and soft landscaping

¡ Irrigation and site drainage

¡ Loading docks

¡ Signage and exterior amenities

Regulatory Compliance

¡ Life safety and fire suppression systems

¡ Design occupant load

¡ Acoustics

¡ Accessibility

¡ Sustainability

Asset Renewal Interventions

Our approach begins with understanding our clients’ pro forma. We collaborate to uncover the right intervention

for each asset that maximizes its transformative

potential.

Potential interventions include:

¡ Recladding and envelope improvements

¡ Deep retrofits

¡ Seismic upgrades

¡ Heritage restoration

¡ Base building upgrades

¡ Systems and equipment upgrades and/ or replacements

¡ Retrofits to prepare for a carbon neutral future

¡ Energy efficiency retrofits

¡ Life safety and building code upgrades

¡ Accessibility, barrier-free and universal design enhancements

¡ Rebranding

¡ Creation of a new front door

¡ Public realm enhancements

¡ Interior and programmatic reconfigurations

¡ Addition of amenities

¡ Change of use

» Residential

» Senior’s housing

» Post-secondary

» Labs, life sciences and healthcare

» Hospitality

Projects

Stephen Avenue Place

Critical to the resiliency of Stephen Avenue Place was the need for greater integration with the public realm . We transformed the previously low-visible podium into a transparent and accessible mixed-use environment that will support the tower’s long-term success .

NAIOP Calgary REX Awards, Office Development of the Year, Finalist, 2021

Location | Calgary, Alberta

Client | Slate Asset Management

Completion | 2021

Size | 100,000 sq ft (9,290 sq m )

The ground, second and third floors are fully renovated with upgraded retail, dining hall and restaurant spaces . Tenant amenities include an exclusive lounge and games room, as well as a conference centre and club-quality fitness facility on the fourth floor .

The rebranding attracts tenants, generates new spending through enhanced visitor experiences and improves the quality of urban life .

Bow Valley Square Revitalization

The revitalization of Bow Valley Square consists of a complete transformation of a four-tower city block complex . We reimagined the podium’s interior and exterior to modernize its urban presence and strengthen pedestrian access .

Location | Calgary, Alberta

Client | Oxford Properties Group

Completion | Phase 1: 2012; Phase 2: 2019

Size | 225,000 sq ft (20,900 sq m )

Phase 1 completed in association with B+H Architects

LEED Gold for Commercial Interiors

The design replaces the podium’s aging façade with large glass storefronts and refreshed concrete . The addition of entrance canopies, exterior lighting and upgraded signage increase the complex’s visibility and boost the vibrancy of the public realm .

BOMA Outstanding Building of the Year Award, Best Renovated Building, 2012

Urban Work Campus

A showcase for innovative urban renewal, the Campus reinvigorates a legacy building as a vibrant work environment . Located within the former Sears retail space at the CF Toronto Eaton Centre, the design transforms the previously opaquely clad façade with transparent glazing, raising the building’s prominence .

Location | Toronto, Ontario

Client | Confidential Canadian Financial

Institution, The Cadillac Fairview Corporation Limited

Completion | Ongoing

Size | 350,000 sq ft (32,516 sq m )

Core + Shell Design Architect: Gensler

Core + Shell Executive Architect: Zeidler

Interior Fit-out, Floors 6,7: Zeidler

This progressive flagship supports the client’s business transformation . Focused on strategic partnerships, industry-leading customer service and investment in technology, the Campus reimagines the traditional workspace as a vibrant, collaborative environment .

A revitalized entranceway and forecourt plaza with lighting and planters activate the street and guide pedestrian traffic into the space .

791 West Georgia Street

This new luxury hotel development converts the former Four Seasons Hotel, currently integrated with the CF Pacific Centre . The proposal involves a complete renovation of the existing tower, with comprehensive seismic upgrades and an interior reconfiguration .

The former opaque, windowless façade of the podium is replaced with a highperformance double-glazed curtain wall .

Location | Vancouver, British Columbia

Client | The Cadillac Fairview Corporation Limited

Completion | Ongoing

Size | 390,000 sq ft (36,000 sq m )

The design transforms the tower’s urban presence . We reversed the internal organization of the podium, placing all public functions along the exterior façade allowing occupants to experience meaningful moments of curiosity and discovery with street life .

Existing program

Existing structural framing preserved

Proposed program exposes amenities to the street

Structural system upgraded with seismic bracing

Port cochère and podium roof revitalized
Recladding of podium and tower façade

The Cube

We transformed an underused commercial building into rental residential with 65 units . The floor plate is subdivided while the existing core and structure is retained, and a new mechanical unit allows for the increase in load . We replaced the façade with a new wall assembly and relocated the entrance to provide a better sense of scale . The conversion adds urban homes, builds community and provides vibrancy to the neighbourhood

Mayor’s Urban Design Awards, Housing

Innovation Honorable Mention, 2019

Location | Calgary, Alberta

Client | Strategic Group

Completion | Complete, 2019

Size | 61,300 sq ft (5,700 sq m )

2 Queen West

We are restoring this historic 1896 Philip Jamieson Building back to its original prominence after decades of alternations . The design includes a three-storey addition set back making it visually distinguishable from the heritage building . The design elevates the heritage attributes while providing a more accessible, flexible and connected space to the adjacent CF Toronto Eaton Centre shopping centre

Location | Toronto, Ontario

Client | The Cadillac Fairview Corporation Limited

Completion | 2024

Size | 63,200 sq ft (5,800 sq m )

Heritage restoration by ERA Architects

Sherbourne Estates

Sherbourne Estates uses a high-performing overclad system to renew an existing tower-in-the-park development, while celebrating the original brutalist architectural character .

Designed as a “second skin,” the comprehensive retrofit improves thermal comfort, energy efficiency, air tightness and operational costs .

Location | Toronto, Ontario

Client | Epic Investment Services

Completion | Under Construction

Size | 429,000 sq ft (39,855 sq m )

Envelope improvements include insulated spandrel panels fixed on top of the existing brick façade and a new double pane window system . We introduced electrical appliances and PTAC upgrades to eliminate reliance on natural gas, a leading source of greenhouse gas emissions .

Continuous louvre
New window wall with vision glass
Sheet metal over frame
New window wall with insulated shadow box
Insulation between frame
Existing brick and CMU knee wall

Before

Existing Temperature Profile

Existing kneewall with a new thermally broken window assembly and insulation. Thermal bridging of the continuous concrete slab extends beyond the envelope without insulation. The surface behind the existing insulation is at risk of condensation.

After

Overclad Temperature Profile

Overclad kneewall with an air and vapour barrier (AVB) on the outside face of the brick and mineral wool insulation exterior to the AVB. The solution prevents condensation and thermal bridging.

CF Toronto Eaton Centre

Galleria Revitalization

The revitalization modernizes this landmark glass enclosure to make

Location | Toronto Ontario

Client | The Cadillac Fairview Corporation Limited

Completion | 2025

Size | 52,740 sq ft (4,900 sq m )

The profile of the roof will remain virtually untouched . The existing glass is replaced with larger panes, improving energy efficiency and maintenance through the reduction of unnecessary connections and seals .

Additional design drivers include drainage, glare control, integration of electrical systems, wind and snow studies, and the replacement strategy . Allowing the shopping centre to continue regular operations during construction is critical .

Allan Gardens Palm House Restoration

Our refurbishment of the Palm House restores the defining heritage elements of this 1910 Edwardian horticultural pavilion . The upgrade preserves the distinct architectural language of the site, while improving its operability and accessibility .

To improve the performance of the enclosure, the overhead glazing of all three domes is replaced with laminated glass panels . Coupled with improvements to mechanical and electrical systems, the retrofits result in better indoor air quality, energy efficient operations and more stable indoor temperatures .

Location | Toronto Ontario

Client | City of Toronto

Completion | 2025

Size | 3,400 sq ft (320 sq m )

In association with heritage architects

Architects Rasch Eckler Associates Ltd.

A principal component of the project is the reinstatement of a central entrance at the eastern portico, a key element of the original design . The new projecting entry bay with double doors will offer barrier-free entry to the conservatory, accommodate access for heavy machinery for maintenance and create a more prominent entrance .

We Are Zeidler

We are passionate, curious designers

Human connection drives us as interior designers, architects, urban designers and technologists . We collaborate with clients, partners and communities to create exceptional spaces that bring people together We are committed to listening, learning and growing our expertise in all aspects of our projects — from concept to built form . The process of developing sensitive and practical solutions motivates us as we translate ideas into reality

We create spaces that shape experiences

Propelled by curiosity, we design meaningful spaces that deliver lasting value . Our portfolio spans a broad range of work: civic and academic buildings, commercial and residential properties, healthcare and research facilities, performing arts centres, hotels and resorts, and the preservation and re-purposing of our architectural heritage All our designs reflect the ambitions, practical requirements, dynamics and culture of our clients . As a team, we create spaces that contribute to communities and encourage personal connection by welcoming all people

We foster a culture of creative inspiration

Our creative process is based on cultivating the potential of our team We nurture our expertise through mentorship and continuous learning . We listen to, consider and build on each other’s ideas to create thoughtful solutions . Attuned to innovations in sustainability, accessibility, design theory and materiality, we base our design decisions on evidence . By finding inspiration in our collaborative culture, we continually achieve excellence in design and implementation for our clients .

Get in Touch

We believe that good design evolves from an understanding of our clients’ unique identities . Our clients inspire us to develop innovative solutions that address their individual business needs . We look forward to discussing how we can collaborate together

Vaidila Banelis

Senior Partner

vbanelis@zeidler com

T 416 596 8300 x2357

David Collins

Partner

dcollins@zeidler com

T 416 596 8300 x2225

Partner

qwong@zeidler com

T 416 596 8300 x2211

zeidler.com | info@zeidler.com

Toronto

600-158 Sterling Road

Toronto, Ontario

M6R 2B7

T 416 596 8300

Calgary

300-640 8 Avenue SW

Calgary, Alberta

T2P 1G7

T 403 233 2525

Vancouver 1981 Main Street

Vancouver, British Columbia

V5T 3C1

T 604 423 3183

Victoria

400-1207 Douglas Street

Victoria, British Columbia

V8W 2E7

T 250 388 9494

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Asset Renewal by Zeidler Architecture - Issuu