FALL 2019 MLA Drawing Exercise: HKU Refuge - Tony YUEN

Page 1

DRAWING LIST DRAWING NO.

DRAWING TITLE

SCALE @ A3

DATE

REVISION

DRAWN BY

A-3-0-DL

DRAWING LIST

N.S.

21 DEC 2019

-

TY

A-3-0-LP

LOCATION PLAN

1:500

21 DEC 2019

-

TY

A-3-0-PR

EXISTING CONDITIONS PHOTOGRAPHIC RECORD

N.S.

21 DEC 2019

-

TY/ MP

A-3-1-MLP

MASTER LAYOUT PLAN

1:100

21 DEC 2019

-

TY

NOTE(S): 1. 2. 3. 4. 5.

6.

7.

A-3-2-SO

SETTING OUT PLAN

1:100

21 DEC 2019

-

TY

A-3-3-EL

DESIGN ELEVATIONS

1:100

21 DEC 2019

-

TY

A-3-4-SE-1

DESIGN SECTION

1:50

21 DEC 2019

-

TY

A-3-5-SE-2

DETAIL SECTION

1:20

21 DEC 2019

-

TY

A-3-6-LP-1

LAYOUT PLAN - A

1:50

21 DEC 2019

-

TY

A-3-6-LP-2

LAYOUT PLAN - B

1:50

21 DEC 2019

-

TY

A-3-6-LP-3

LAYOUT PLAN - C

1:50

21 DEC 2019

-

TY

A-3-6-LP-4

LAYOUT PLAN - D

1:50

21 DEC 2019

-

TY

A-3-6-LP-5

LAYOUT PLAN - E

1:50

21 DEC 2019

-

TY

A-3-6-LP-6

LAYOUT PLAN - F

1:50

21 DEC 2019

-

TY

A-3-6-LP-7

LAYOUT PLAN - G

1:50

21 DEC 2019

-

TY

A-3-7-DE-1

DETAIL - A

1:10

21 DEC 2019

-

TY

A-3-7-DE-2

DETAIL - B1 & 2

1:5

21 DEC 2019

-

TY

A-3-7-DE-3

DETAIL - C

1:5

21 DEC 2019

-

TY

A-3-7-DE-4

DETAIL - D1 & 2

1:5

21 DEC 2019

-

TY

A-3-7-DE-5

DETAIL - E

1:5

21 DEC 2019

-

TY

A-3-7-DE-6

DETAIL - F

AS SHOWN

21 DEC 2019

-

TY

A-3-7-DE-7

DETAIL - G

AS SHOWN

21 DEC 2019

-

TY

A-3-7-DE-8

DETAIL - H

AS SHOWN

21 DEC 2019

-

TY

A-3-7-DE-9

DETAIL - I

1:5

21 DEC 2019

-

TY

A-3-8-MS

MATERIAL SPECIFICATIONS

N.S.

21 DEC 2019

-

TY

8.

THIS DRAWING IS FOR REFERENCE ONLY THE UNITS OF THIS DRAWING TO BE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED DO NOT SCALE THIS DRAWING THIS DRAWING SHOWS DESIGN INTENTION ONLY ALL STRUCTURAL WORKS INCLUDING BUT NOT LIMITING TO PILING WORKS, CONCRETING, METAL FIXING DETAILS SHALL REFER TO ENGINEER'S DRAWING AND SPECIFICATION THE CONTRACTOR SHALL CONDUCT SITE SURVEYING AND TRIAL PITS FOR THE PILING AND FOOTING WORKS, STRUCTURAL MEMBER SIZES SHALL SUBJECT TO ACTUAL SITE CONDITIONS THE CONTRACTOR SHALL REPORT TO THE LANDSCAPE ARCHITECT WHENEVER CONFLICT IS FOUND BETWEEN SITE CONDITIONS AND THIS DESIGN DRAWING ALL NECESSARY CHANGES/ COUNTER PROPOSAL BY THE CONTRACTOR SHALL SUBMIT TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO THE COMMENCEMENT OF WORKS

-

ISSUANCE OF DRAWING

21DEC19

REV.

DESCRIPTION

DATE

ARCH 7254

TECHNOLOGY IN LANDSCAPE ARCHITECTURE

PROJECT:

HKU REFUGE STAGE:

DRAWING SUBMISSION DRAWING TITLE:

DRAWING LIST DRAWING NO.:

A-3-0-DL SCALE:

REV.:

N.S. @ A3

DRAWING ISSUANCE

-


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
FALL 2019 MLA Drawing Exercise: HKU Refuge - Tony YUEN by Tony Yuen - Issuu