PROJECT INITIAL COST As the project came to an end, we found it was necessary to calculate and estimate of the initial cost of the project in order to submit a full report to potential sponsors. We researched the average cost/meter in Egypt for the different types of buildings we have on campus and for landscape elements. Next are the tables including the cost analysis.
SCHOOLS
TECHNICAL SCHOOLS Building
No. of floors
Total area (m2) Cost/m
Art
4
6280
3,500
21,980,000
Carbentry
4
8511
3,500
29,788,500
Civil workshopes skills
4
5752
3,500
20,132,000
Mechanical
4
3979
3,500
13,926,500
Building cost (L.E.)
Building
No. of floors
Total area (m2) Cost/m
School grade 1-8
5
26700
2,500
66,750,000
Electrical & Electronic
4
8415
3,500
29,452,500
School grade 9-12
3
15300
2,500
38,250,000
School grade 9-12
1
5403
3,500
18,910,500
Building cost (L.E.)
105,000,000 Total landscape area is 46400 m2 cost 16,240,000 L.E. (cost per meter is 350 L.E.) Parking area is 6000 m2 cost 1,500,000 L.E. (cost per meter is 250 L.E.) Total cost for school zone 122,740,000 L.E
190
134,190,000.00 Total landscape area is 87200 m2 cost 30,520,000 L.E. (cost per meter is 350 L.E.) Parking area is 6851 m2 cost 1,712,750 L.E. (cost per meter is 250 L.E.) Total cost for technical zone 166,422,750 L.E