architecture undergraduate portfolio

Page 1

portfolio yousif elgenaid P T F O O I L O R yousif elgenaid +968 9761 4824 y.nasreldeen@hotmail.com current student (Omdurman Islamic University .OIU.) Apply for architecture training

Certificates

- Revit architecture advanced course ( from Astler training center )

- Sketch-up advance course ( from Alla training center )

- Certificat of appreciation in leading the executive committees of 10th architectural week ( from faculty dean , dean of student affairs )

Bio Skills

Young ambitious architect seeking professional growth and experience to further enhance my expertise in architecture and urban planning in my point of view Attention to the user is the highest priority in the design and the realization of all aesthetic and functional aspects, the most important of which are natural and the impact of the climate on the building and environmental studies to achieve thermal comfort

Education

Al Nokhba Primary schools

Al Nokhba secondary school

current student (Omdurman Islamic University .OIU.)

Revit Sketch-up Lumion V-Ray indesign

Experience in graphic design

in my point of view graphic design is overlaps with architecture , in the end the language of architecture is a visual language so the way work is presented graphically communicates design concepts

elgenaid
yousif
Photoshop illustrator Adobe XD Figma

CONTENTS

01. 4 STARS HOTAIL 02. Park design 03. architectural campus 04. Atbara train statin

4 STARS HOTAIL

The hotel overlooks the Nile and is intended to be designed in a modern way to be a tourist and recreational area for foreign visitors

The building includes single and double apartments on the upper floors, while the rest of the services are located on the lower floors

the site plan shows the main road to the building with the entrance, the car parking and the recreational part behind the building on the Nile side

UP DN DN DN DN DN 1.1 1.2 1.3 1.4 1.5 1.6 A2 A1 A3 A4 A6 1.7 1.8 1.9 1.10 2.1 2.2 2.3 2.5 A2.1 A2.2 A2.3 A2.4 2.4 Meeting Room Coffe Shop Security Office 1 section 1.42 m 1.22 m 0.10 m 0.00 m 1.00 m 2.00 m 0.10 m 0.15 m 0.30 m 0.20 m 0.00 m 0.60 m 0.30 m 0.30 m 0.60 m 0.60 m 0.30 m 0.30 m 0.60 m Shops Reception Reception Lobby Security Break Main Entrance Coffe Shop for lobby 5.10 m 23.94 m 11.10 m 6.66 m 11.04 m 3.90 m 9.05 m 70.79 m 8.56 m 8.00 m 8.33 m 4.67 m 5.00 m 4.02 m 1.20 m 1.20 m 1.20 m 1.20 m 1.20 m 44.60 m 4.10 m 1.00 m 7.14 m 11.71 m 14.70 m 13.05 m 10.05 m 9.04 m 5.50 m 76.29 m 6.10 m 4.88 m 10.69 m 5.10 m 18.85 m 17.93 m 63.56 m Preparation Area ResturantOffices
REF. DW REF. DW REF. DW REF. DW UP A C 1 3 Single Room Suite Single Room Suite Double Room Double Room Suite Single Room Single Room Suite Double Room Double Room 1 section B 2 8.06 m 7.66 m 6.21 m 3.90 m 4.10 m 29.93 m 4.14 m 4.86 m 4.08 m 4.08 m 4.96 m 4.00 m 26.12 m 4.10 m 3.80 m 7.78 m 6.25 m 3.90 m 4.10 m 29.93 m 4.00 m 4.96 m 4.08 m 4.08 m 4.86 m 3.92 m 25.89 m -
section 2 section 3 section 4 49.00 m Gypsum Wall Board wall core structure column EIFS, Exterior Insulation air gap aluminum facade Tile, Mosaic, Gray Concrete Lightweight Metal Deck ceiling Level 20 77.00 m 2 53.00 m 1 200 1 Section 2 1 25 2 Metal Deck 1 : 25 3 elevator engine 1 20 4 wall layers

picked meeting room to work on interior design

with the interior design of the space being related to the design concepts of the hotel, (modernism) , simplicity , unity and harmony in colors .

sample bord

interior 3d shots

park design

It is intended to create a park as an outlet for a nearby residential area, while containing a small cafeteria to serve the users

Most of the landscaping design elements were used, including water bodies, stairs, outdoor ramps, and green elements

architectural campus

the project is aimed to build an environment that connects students with each other and to give them the opportunity to share knowledge . this environment is what we lack at the moment in this faculty

new architectural campus

the project is designing a new architectural campus in omdurman islamic university with a new environment.

projcet goals

the project is aimed to build an environment that connects students with each other and to give them the opportunity to share knowledge . this environment is what we lack at the moment in this faculty

the concept

the concept comes from the main bubbles diagram and The main axes of the movement diagram to create shapes that squeeze the students together

The location is north of the College of Engineering and south of the block factory The site has good accessibility. far from the noise.

Close to the College of Engineering, which encourages the students of both colleges to interact

The different blocks of the project were interconnected through a main path that runs from the reception to the educational block and then moved to the college spirit (the library) and then to the conference hall and to the outside

Through the floors, the students were separated from the female students. The ground floor is for female students, the first floor is for male students, and the second floor is for postgraduate studies.

The use of double glazing high heat and noise from entering And also the use of refractory

to allow in natural light and prevent entering refractory bricks

The city of Atbara is famous for its railway station, so the idea was to make the station an icon for the city and to be more than just a train station, so the idea was to make the ground floor contain various services available to all residents of the city and travelers, and the passenger lounges would be on the first floor

The plastic idea came from making the station in line with the general character of the city (squares overlapping randomly).

Atbara train statin

Atbara train statin

Atbara is one of the most important cities in Sudan and is considered the heart of the Sudan Railways

Location:

From site analysis, environmental problems were identified. The main elevation is the western elevation, which is considered to have many challenges due to the high temperatures falling on the building.

due to this we need to finde an architectural solution to this problem .

Site analysis:

street design:

The nature of the project requires that Walkers have priority on the road, so the road must be designed in a way that guarantees the safety of Walkers from any dangers

The city of Atbara is famous for its railway station, so the idea was to make the station an icon for the city and to be more than just a train station, so the idea was to make the ground floor contain various services available to all residents of the city and travelers, and the passenger lounges would be on the first floor

The plastic idea came from making the station in line with the general character of the city (squares overlapping randomly).

thanks

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.